ML20027C541

From kanterella
Jump to navigation Jump to search
Forwards La Bowen 821005 Affidavit Per ASLB 821012 Memorandum & Order Ruling on Disclosure Obligation.Info Provided Re Dekalb Area Alliance for Responsible Energy/ Sinnissippi Alliance for Energy Contention 9a
ML20027C541
Person / Time
Site: Byron  Constellation icon.png
Issue date: 10/14/1982
From: Gallo J
COMMONWEALTH EDISON CO., ISHAM, LINCOLN & BEALE
To: Callihan A, Cole R, Margulies M
NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP), Atomic Safety and Licensing Board Panel
Shared Package
ML20027C542 List:
References
NUDOCS 8210180142
Download: ML20027C541 (2)


Text

o .

ISHAM, LINCOLN & BEALE DOCKETED COUNSELORS AT LAW ljgSgC It20 CONNECTICUT AVENUE. N W SUITE 840 WASHINGTON. 0 C. 2""

EDWARD S ISHAM. 187219c2 LOB ERT T. UNCOLN. 1872 1889 201 833-9730 bcI 15 N0:30 CHICAGO OFFICE THREE FIRST NATIONAL PLAZA WILUAM G BEALE. 1885-1923 CHICAGO. sLUNOIS 30602 N ftCE 0# M ' HEE" October 14, 198f0CKETliiG ggANCH & SER Morton B. Margulies, Esq. Dr. Richard F. Cole Administrative Judge and Administrative Judge Chairman Atomic Safety and Licensing Atomic Safety and Licensing Board Board U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, D.C. 20555 Washington, D.C. 20555 Mr. A. Dixon Callihan Administrative Judge Atomic Safety and Licensing Board c/o Union Carbide Corporacion P.O. Box Y Oak Ridge, TN 37830 RE: In the Matter of Commonwealth Edison Company (Byron Nuclear Power Station, Units 1 and 2)

Docket Nos. 50-454 and 50-455 Gentlemen:

Ig accordance with the disclosure requirements of the McGuire j case and the Atomic Safety and Licensing Board's i October 12 " Memorandum and Order Ruling on Applicant's Disclo-l sure Obligation," I am enclosing the Affidavit of Leslie A.

Bowen, dated October 5, 1982. Ms. Bowen's affidavit provides l information pertaining to DAARE/ SAFE Contention 9a concerning a phenomenon called " water hammer" and its potential effect on Byron Station.

1 Specifically, Ms. Bowen stated in her affidavit of l June 6, 1982, that Commonwealth Eda. son Company planned to I install temperature sensors on the bypass system piping to the steam generators at Byron Station (Affidavit, 11 1-2). The l purpose of this filing is to apprise the Board and the parties 1

  • / Duke Power Company (William B. McGuire Nuclear Station, Units 1 and 2), ALAB-143, 6 AEC, 623, 625 (1973).

8210180142 821014 PDR ADOCK 05000454 O PDR D

that Edison no longer intends co install these temperature sensors (Affidavit, 34). The attachment to Ms. Bowen's October 5 Affidavit also addresses several questions posed by the NRC Staff with respect to the "KRSKO water hammer" event.

Memorandum and Order Ruling on Motions For Summary Disposition of DAARE/ SAFE Contentions, pp. 21-22, dated September 10, 1982.