Similar Documents at Byron |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M2871999-10-21021 October 1999 Refers to Rev 5 Submitted in May 1999 for Portions of Byron Nuclear Power Station Generating Stations Emergency Plan Site Annex.Informs That NRC Approval Not Required Based on Determination That Plan Effectiveness Not Decreased ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217F7891999-10-0808 October 1999 Forwards Insp Repts 50-454/99-12 & 50-455/99-12 on 990803- 0916.One Violation Occurred Being Treated as NCV ML20217B6351999-10-0505 October 1999 Forwards for Info,Final Accident Sequence Precursor Analysis of Operational Event at Byron Station,Unit 1,reported in LER 454/98-018 & NRC Responses to Util Specific Comments Provided in ML20212L1791999-10-0505 October 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Rvid & Is Releasing Rvid Version 2 ML20217B2991999-10-0101 October 1999 Forwards Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Water Chemisty Program Was Well Implemented,Resulted in Effective Control of Plant Water Chemistry ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20212J6751999-09-30030 September 1999 Forwards Replacement Pages Eight Through Eleven of Insp Repts 50-454/99-15 & 50-455/99-15.Several Inaccuracies with Docket Numbers & Tracking Numbers Occurred in Repts ML20217A5821999-09-29029 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20216F8051999-09-17017 September 1999 Forwards Insp Rept 50-454/99-14 & 50-455/99-14 on 990823-27. Security Program Was Effectively Implemented in Areas Inspected.No Violations Were Identified ML20211P1841999-09-0808 September 1999 Forwards Insp Repts 50-454/99-15 & 50-455/99-15 on 990824- 26.No Violations Noted.Objective of Insp to Determine Whether Byron Nuclear Generating Station Emergency Plan Adequate & If Emergency Plan Properly Implemented ML20211Q6821999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Byron Operator Licesne Applicants During Wks of 000619 & 26.Validation of Exam Will Occur at Station During Wk of 000529 ML20211N5151999-09-0303 September 1999 Ack Receipt of Re Safety Culture & Overtime Practices at Byron Nuclear Power Station.Copy of Recent Ltr from NRC to Commonwealth Edison Re Overtime Practices & Safety Culture Being Provided ML20211K1081999-09-0202 September 1999 Responds to Request for Addl Info to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Braidwood,Units 1 & 2 & Byron,Unit 2 ML20211M1371999-09-0202 September 1999 Discusses 990527 Meeting with Ceco & Byron Station Mgt Re Overtime Practices & Conduciveness of Work Environ to Raising Safety Concerns at Byron Station.Insp Rept Assigned for NRC Tracking Purposes.No Insp Rept Encl ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G4021999-08-25025 August 1999 Forwards Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl ML20210A3151999-07-16016 July 1999 Forwards Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.Three Violations Being Treated as Noncited Violations ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20209G1391999-07-0909 July 1999 Forwards Results of SG Tube Insps Performed During Byron Station,Unit 1,Cycle 9 Refueling Outage within 12 Months Following Completion of Insps ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196K0161999-06-30030 June 1999 Discusses 990622 Meeting at Byron Nuclear Power Station in Byron,Il.Purpose of Visit Was to Meet with PRA Staff to Discuss Ceco Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff ML20196G2161999-06-25025 June 1999 Forwards for NRC Region III Emergency Preparedness Inspector,Two Copies of Comed Emergency Preparedness Exercise Manual for 1999 Byron Station Annual Exercise. Exercise Is Scheduled for 990825.Without Encls ML20212H8241999-06-24024 June 1999 Informs That Effective 990531 NRC Project Mgt Responsibility for Byron & Braidwood Stations Was Transferred to Gf Dick ML20209D4861999-06-17017 June 1999 Informs That R Heinen,License OP-30953-1 & a Snow,License SOP-30212-3,no Longer Require License at Byron Station 05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed1999-06-0808 June 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed ML20207G0601999-06-0707 June 1999 Provides Updated Info Re Number of Failures Associated with Initial Operator License Exam Administered from 980914-0918. NRC Will Review Progress Wrt Corrective Actions During Future Insps ML20207G0421999-06-0404 June 1999 Forwards Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.Violations Identified & Being Treated as non-cited Violations ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20207E5451999-05-28028 May 1999 Forwards Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Fire Protection Program Was Effective ML20211M1611999-05-28028 May 1999 Discusses 990527 Meeting with Comed Re Safety Culture & Overtime Control at Byron Nuclear Plant from Videoconference Location at NRC Headquarters.Requests That Aggressive Actions Be Taken to Ensure That Comed Meets Expectations ML20207D5261999-05-26026 May 1999 Forwards Response to NRC 990318 RAI Concerning Alleged Chilling Effect at Byron Station.Attachment Contains Responses to NRC 12 Questions ML20207B6361999-05-25025 May 1999 Forwards SE Accepting Revised SG Tube Rupture (SGTR) Analysis for Bryon & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20211M1781999-05-25025 May 1999 Summarizes Concerns with Chilling Effect & Overtime Abuses at Commonwealth Edison,Byron Station.Request That Ltr Be Made Part of Permanent Record of 990527 Meeting ML20195C7911999-05-25025 May 1999 Forwards Revised COLR for Byron Unit 2,IAW 10CFR50.59.Rev Accounts for Planned Increase of Reactor Coolant Full Power Average Operating Temp from 581 F to 583 F 05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed1999-05-21021 May 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed ML20206U3471999-05-20020 May 1999 Forwards Insp Rept 50-454/99-05 on 990401-22.No Violations Noted.Insp Reviewed Activities Associated with ISI Efforts Including Selective Exam of SG Maint & Exam Records, Calculations,Observation of Exam Performance & Interviews ML20207A2151999-05-19019 May 1999 Forwards Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Insp Consisted of Review of Liquid & Gaseous Effluent Program,Radiological Environmental Monitoring Program,Auditing Program & Outage Activities 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20209G1391999-07-0909 July 1999 Forwards Results of SG Tube Insps Performed During Byron Station,Unit 1,Cycle 9 Refueling Outage within 12 Months Following Completion of Insps ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196G2161999-06-25025 June 1999 Forwards for NRC Region III Emergency Preparedness Inspector,Two Copies of Comed Emergency Preparedness Exercise Manual for 1999 Byron Station Annual Exercise. Exercise Is Scheduled for 990825.Without Encls ML20209D4861999-06-17017 June 1999 Informs That R Heinen,License OP-30953-1 & a Snow,License SOP-30212-3,no Longer Require License at Byron Station 05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed1999-06-0808 June 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20211M1611999-05-28028 May 1999 Discusses 990527 Meeting with Comed Re Safety Culture & Overtime Control at Byron Nuclear Plant from Videoconference Location at NRC Headquarters.Requests That Aggressive Actions Be Taken to Ensure That Comed Meets Expectations ML20207D5261999-05-26026 May 1999 Forwards Response to NRC 990318 RAI Concerning Alleged Chilling Effect at Byron Station.Attachment Contains Responses to NRC 12 Questions ML20211M1781999-05-25025 May 1999 Summarizes Concerns with Chilling Effect & Overtime Abuses at Commonwealth Edison,Byron Station.Request That Ltr Be Made Part of Permanent Record of 990527 Meeting ML20195C7911999-05-25025 May 1999 Forwards Revised COLR for Byron Unit 2,IAW 10CFR50.59.Rev Accounts for Planned Increase of Reactor Coolant Full Power Average Operating Temp from 581 F to 583 F 05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed1999-05-21021 May 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20207E9831999-05-18018 May 1999 Forwards Copy of Commonwealth Edison Co EP Exercise Evaluation Objectives for 1999 Byron Station Annual EP Exercise,Which Will Be Conducted on 990825.Without Encl ML20206N8551999-05-11011 May 1999 Forwards 1998 Annual Radioactive Environ Operating Rept for Byron Station. Rept Includes Summary of Radiological Liquid & Gaseous Effluents & Solid Waste Released from Site ML20206U3351999-04-30030 April 1999 Forwards Evaluation of Matter Described in Re Byron Station.Concludes That Use of Overtime at Byron Station Was Controlled IAW Administrative Requirements & Mgt Expectations Established to Meet Overtime Requirement of TS ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206C7901999-04-23023 April 1999 Provides Suppl Info Re Use of W Dynamic Rod Worth Measurement Technique,As Requested During 990413 Telcon.Rev Bars in right-hand Margin Identify Changes from Info Submitted by ML20206E7521999-04-22022 April 1999 Submits Rept on Number of Tubes Plugged or Repaired During Inservice Insp Activities Conducted at Plant During Cycle 9 Refueling Outage,Per TS 5.6.9 ML20206A7431999-04-22022 April 1999 Forwards Comments Generated Based on Review of NRC Ltr Re Preliminary Accident Sequence Precursor Analysis for Byron Station,Unit 1 ML20206B3941999-04-21021 April 1999 Forwards Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors, for Byron & Braidwood Stations.Updated Info Re PCT for Limiting Small Break & Large Break LOCA Analysis Evaluations & Detailed Description of Errors ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 ML20205S9621999-04-20020 April 1999 Responds to 981203 RAI Telcon Re SG Tube Rupture Analysis for Byron Station,Unit 2 & Braidwood Station,Unit 2.Addl Info & Subsequent Resolution of Issues Discussed During 990211 Telcon Are Documented in Encl ML20206A8141999-04-20020 April 1999 Advises NRC of Review of Cycle 10 Reload Under Provisions of 10CFR50.59 & to Transmit COLR for Upcoming Cycle ML20205T3901999-04-13013 April 1999 Forwards Byron Station 1998 Occupational Radiation Exposure Rept, Which Is Tabulation of Station,Utility & Other Personnel Receiving Annual Deep Dose Equivalent of Less than 100 Mrem ML20196K6661999-03-31031 March 1999 Forwards Byron Nuclear Power Station 10CFR50.59 Summary Rept, Consisting of Descriptions & SE Summaries of Changes, Tests & Experiments.Rept Includes Changes Made to Features Fire Protection Program,Not Previously Presented to NRC ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util ML20207K0351999-03-0404 March 1999 Forwards Util Which Transmitted Corrected Pages to SG Replacement Outage Startup Rept.Subject Ltr Was Inadvertently Not Sent to NRC Dcd,As Required by 10CFR50.4 ML20205C6861999-03-0404 March 1999 Provides Notification That Byron Station Implemented ITS on 990205 & Braidwood Station Implemented ITS on 990219 ML20207D6831999-03-0101 March 1999 Forwards fitness-for-duty Program Performance Data for Each Comed Nuclear Power Station & Corporate Support Employees for Six Month Period Ending 981231,per 10CFR26.71(d) ML20207D4301999-02-26026 February 1999 Informs NRC That Supplemental Info for Byron & Braidwood Stations Will Be Delayed.All Mod Work Described in Ltr Is on Schedule,Per GL 96-06 ML20207B8971999-02-25025 February 1999 Expresses Concern That Low Staffing Levels & Excessive Staff Overtime May Present Serious Safety Hazard at Some Commercial Nuclear Plants in Us ML20203C7001999-02-0202 February 1999 Informs That Mhb Technical Associates No Longer Wishes to Receive Us Region III Docket Info Re Comed Nuclear Facilities.Please Remove Following Listing from Service List ML20202F5911999-01-29029 January 1999 Forwards Byron Unit 1 Cycle 9 COLR in ITS Format & W(Z) Function & Byron Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function. New COLR Format Has Addl Info Requirements ML20199E1611999-01-15015 January 1999 Forwards Response to 980902 RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. CE Endorses Industry Response to RAI as Submitted by NEI ML20199B7511999-01-0808 January 1999 Forwards Proprietary Versions of Epips,Including Rev 52 to Bzp 600-A1 & Rev 48 to Bzp 600-A4 & non-proprietary Version of Rev 52 to Bzp 600-A1 & Index.Proprietary Info Withheld 1999-09-30
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML20055E8111990-03-26026 March 1990 FOIA Request for Records Re Indemnification Agreements Between Util & AEC or NRC & Public Liability Insurance ML20211L3011987-02-12012 February 1987 Forwards Settlement Agreement W/State of Il,Consisting of Draft Testimony & Petition ML20211C5811986-10-16016 October 1986 Requests,On Behalf of Util,Reevaluation of Finding That No Significant Changes Occurred in Licensee Activities or Proposed Activities Since Completion of Previous Antitrust Review Re Cp,Based on Listed Reasons ML20195E9321986-05-27027 May 1986 Denies Illinois Municipal Electric Agency (Imea) Allegations of Activities W/Antitrust Implications.Facts Misstated.Refusal to Sell Power to Imea Denied Per Encl .Related Correspondence ML20127B0151985-06-18018 June 1985 Forwards 730223 Application for CPs & OLs for Byron & Braidwood Plants,Braidwood Environ Rept & FSAR for Byron & Braidwood Plants.W/O Encl.Related Correspondence ML20108B0181984-11-0909 November 1984 Informs That Further ASLB Proceedings Re Emergency Planning Stipulation Unneccessary Due to Lasped Time in Filing Petition for Hearing Concerning Commitment W.Intervenors Do Not Intend to File Petition ML20093M8911984-10-19019 October 1984 Advises That Explanation of Reinsp Procedures Contained in Encl LO Delgeorge Is Accurate.Statements Made by French Should Be Construed Accordingly.Related Correspondence ML20093M1451984-10-16016 October 1984 Submits Corrections to Listed Transcription Errors ML20098G8561984-10-0303 October 1984 Forwards Listed Correspondence Between Util & Natl Board of Boiler & Pressure Vessel Inspectors Re Intervernors 840801 Motion That Certain Allegations Concerning Authorized Nuclear Inspector Be Added as Issue in Proceeding ML20098E9491984-09-28028 September 1984 Forwards C Reed & Dl Farrar 840816 & 30 Ltrs Re Responses to Unresolved Independent Design Insp Items. Related Correspondence ML20098F1081984-09-28028 September 1984 Requests Consideration of Rev to First Sentence of Paragraph 23 of NRC Proposed Supplemental Initial Decision Re Record Facts Underlying Recertification Program for QC Inspectors at Site ML20098F1251984-09-28028 September 1984 Forwards Listed Documents Relevant to Issue of Adequacy of Equipment Supplied to Plant by Sys Control Corp,Including LO Delgeorge Describing Results of Cable Pen Hanger Weld Reinsp Program.Related Correspondence ML20098G4401984-09-25025 September 1984 Forwards C Reed & Byron Integrated Design Insp Response,For Review.Document Relevant to Intervenor Pending Motion to Reopen Record to Include Byron Station Design as Issue.Related Correspondence ML20098A8671984-09-20020 September 1984 Confirms 840919 Telcon Between J Gallo & Smith,Granting Extension Until 841002 for Applicant & Until 7 Days from Applicant Filing for Staff to File Response to Intervenor Motion to Reopen Record.Svc List Encl ML20097J4561984-09-17017 September 1984 Provides Corrections to Proposed Supplemental Initial Decision ML20097E4151984-09-14014 September 1984 Forwards Applicant Final Deficiency Rept Re Butt Splices in Electrical Conductors.Subj Deficiency Was Addressed at May 1984 Prehearing Conference.Related Correspondence ML20097F2261984-09-12012 September 1984 Forwards Omitted Page & Provides Correction to Proposed Supplemental Initial Decision ML20097B9481984-09-11011 September 1984 Forwards Listed Documents Re Applications for Licenses & Amends to Receive & Store Unirradiated Fuel at Plant in Connection W/Planned Operation & NRC Grant of License for Unit 1 to Receive & Store Fuel.Related Correspondence ML20097B7601984-09-10010 September 1984 Forwards Proposed Supplemental Initial Decision Re Reinsp Program ML20096D0711984-08-30030 August 1984 Forwards Physical Exhibits a Through E2 Received Into Evidence on 840723.W/o Encls.Related Correspondence ML20093N2541984-07-30030 July 1984 Forwards Testimony Filed During 840724 Hearings in Rockford, Il.W/O Encls.Related Correspondence ML20090E5331984-07-17017 July 1984 Forwards Testimony of Eb Branch Describing Prof Qualifications & Work Experience.Related Correspondence ML20093E3851984-07-13013 July 1984 Summarizes 840709 Meeting Re Intervenors 840702 Motion to Extend Time to File Petition for Hearings Under Emergency Planning Stipulation.Util Supports Extension of Time Until 840914 to File ML20093D4241984-07-12012 July 1984 Forwards Errata Sheet Listing Corrections to May 1984 Interim Rept of Independent Design Review.Related Correspondence ML20093E4891984-07-11011 July 1984 Forwards Summary of 840703 Telcon Re Scheduling of Hearings & Disclosure of Intervenor Witness.Related Correspondence ML20093D4371984-07-11011 July 1984 Forwards Typeset Version of Suppl to Rept on QC Insp/Reinsp Program,Errata & Addenda to Orignial Rept,Per 840628 Commitment.Related Correspondence ML20093E4971984-07-10010 July 1984 Summary of 840703 Telcon Re Scheduling of Hearings & Disclosure of Intervenor Witness.Related Correspondence ML20090A7951984-07-0909 July 1984 Forwards Testimony of Bf Maurer & Gf Marcus Re Equipment Supplied by Sys Control Corp.Related Correspondence ML20092P5511984-07-0303 July 1984 Forwards Testimony of Dl Leone & R French.Related Correspondence ML20092P7571984-07-0303 July 1984 Forwards May & June 1984 Interim Repts Re Independent Design Review Performed by Bechtel Power Corp.W/O Encl ML20092P7741984-07-0202 July 1984 Forwards Testimony of W Shewski,J Mclauglin,R French, D Leone,W Behnke,R Tuetken,R Laney,M Somsag,L Del George & Ak Singh Re Reinsp Program.Related Correspondence ML20092P5431984-07-0202 July 1984 Forwards Second Interim Deficiency Rept Re Butt Splices in Electrical Conductors.Subj Discussed at 840531 Prehearing Conference.Related Correspondence ML20092N4871984-06-29029 June 1984 Forwards Testimony of Jo Binder & Bg Treece on Issues 5 & 6 Re Cable Overtensioning,As Issues Have Been Limited by ASLB 840608 Order.Related Correspondence ML20092P6051984-06-29029 June 1984 Forwards First & Second Interim Repts of Bechtel Independent Design Review Re May & June 1983 Integrated Design Insp. Related Correspondence ML20092N2161984-06-28028 June 1984 Forwards Suppl to Rept on Byron QC Inspector Reinsp Program.Related Correspondence ML20092P7491984-06-22022 June 1984 Forwards Bechtel Interim Rept of Independent Design Review Pertaining to IE Integrated Design Insp in May & June 1983. W/O Encl.Related Correspondence ML20091R8721984-06-13013 June 1984 Forwards Interim Deficiency Rept Re Electrical Conductor Butt Splices.Topic Discussed at 840531 Prehearing Conference.Related Correspondence ML20091B2701984-05-25025 May 1984 Submits Addl Info Re Quality Oversight of Equipment & Components Purchased from Sys Control Corp.Safety-related Main Control Boards Will Be Investigated ML20084L6601984-05-0909 May 1984 Submits List of Issues Identified by Applicant as Matters of Concern or Unresolved QA Issues in ASLB Initial Decision. Prehearing Conference Should Be Held as Soon as Possible. Related Correspondence ML20084E1121984-04-27027 April 1984 Forwards Executed Affidavits of Nondisclosure of J Gallo, B Becker,L Delgeorge,M Miller & J Gayley.W/O Encl.Related Correspondence ML20088A8091984-04-0909 April 1984 Forwards Current Organizational Charts from QA Manual,In Response to ALAB-143.Related Correspondence ML20087G7421984-03-14014 March 1984 Discusses Util 840218 & 0314 Nonconformance Repts Re Discrepant Welds in Cable Pan Hangers Supplied by Sys Control Corp.Earlier Nonconformance Repts Re Matter Issued in 1977 at Byron.Related Correspondence ML20080U1431984-02-27027 February 1984 Forwards Rept on Byron QC Inspector Reinspection Program ML20080R9671984-02-22022 February 1984 Submits Corrigenda to 840213 Brief.Certificate of Svc Encl ML20080L1211984-02-10010 February 1984 Forwards Documents Pertinent to ASLB 840113 Initial Decision.Document Topics Include Enforcement Actions,Reinsp Program Audits & Surveillances & Special Insp Re Worker Allegations.W/O Encl ML20080A6561984-01-27027 January 1984 Forwards Reinsp Program Rept,Util 831028 Preliminary Reinsp Rept,Nrc 831118 Initial Response & NRC 831228 Insp Rept. W/O Encls.Related Correspondence ML20083J6971983-12-30030 December 1983 Forwards Applicant Re Changes to Byron Steam Generators to Minimize flow-induced Vibration.Ltr Addresses Issues Litigated Under Intervenor Contentions Challenging Integrity of Installed Steam Generator Tubes ML20083D9641983-12-14014 December 1983 Informs That a Koca Terminated from Position as QA Supervisor for Hatfield Electric Co,Effective 831021 ML20080S1661983-10-14014 October 1983 Forwards Applicant Reply to Joint Intervenors Partial Proposed Findings of Fact & Conclusions of Law on Contention 1A ML20080R0841983-10-10010 October 1983 Advises That Util Does Not Object to ASLB Taking Official Notice of EPA Rept, Protective Action Evaluation Part II, Evacuation & Sheltering as Protective Actions Against Nuclear Accidents Involving Gaseous Release. Part I Encl 1990-03-26
[Table view] |
Text
t - ~ >
ISHAM, LINCOLN & BEALE COUNSELORS AT LAW THRE E FIR 51 NATONAL PLAZA CHICAGO, lLUNOIS 60802 TELEPHONE 312 553 7500
'.OT,15 $"O N E% * " " ' ' ' WASHINGTON OFFICE WILUAM G BEAtt, 1885 1923 " ' ""' 5t'l's 't"" "
- WASHiN TON C 20026 December 14, 1983 Ivan W. Smith, Esq. Dr. Richard F. Cole Administrative Judge and Administrative Judge Chairman Atomic Safety and Licensing Atomic Safety and Licensing Board Board U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, D. C. 20555 Washington, D. C. 20555 Dr. A. Dixon Callihan Administrative Judge Atomic Safety and Licensing Board c/o Union Carbide Corporation P.O. Box Y Oak Ridge, Tennessee 37830 Re: In the Matter of Commonwealth Edison Company (Byron Nuclear Power Station, Units 1 and 2)
Docket Nos. 50-454 and 50-455
Dear Administrative Judges:
In accordance with its obligation to inform the Board of occurrences which may be relevant to the above-captioned proceedings, Commonwealth Edison Company hereby informs the Board that Allen Koca was terminated from his position as Quality Assurance Supervisor for Hatfield Electric Company effective October 21, 1983. During a meeting with represen-tatives of Commonwealth Edison at Byron on August 5, 1983, members of the Region III Staff of the Nuclear Regulatory Commission expressed their concern about Mr. Koca's ability to function effectively within Hatfield's quality assurance program. As understood by Commonwealth Edison personnel, the Staff's concern was that friction between Hatfield's quality control inspectors and Mr. Koca was undermining his ability to assist in the implementation of an effective quality assurance program. The Staff also expressed concern about Mr. Koca's ability to perform his job responsibilities effectively. Commonwealth Edison concurred with the Staff's assessment of Mr. Koca.
8312280378 831222 PDR ADOCK 05000454 0 PDR m66M
~ ~
EXHIBIT B
Ivan W. Smith, Esq.
Dr. Richard F. Cole Dr. A. Dixon Callihan December 14, 1983 Page Two '
Mr. Koca was not terminated because of any findings of wrongdoing on his part. The vast majority of allegations
-involving Hatfield's quality assurance program and Mr. Koca personally have proven to be unsubstantiated, Hatfield's quality assurance program is functioning satisfactorily, and to the Company's knowledge there have been no findings of wilful wrongdoing by Mr. Koca. Removal of Mr. Koca as Quality Assurance Supervisor, however, was viewed to be an appropriate step toward reinstilling confidence in Hatfield's quality assurance program.
Mr. Koca's termination should not be deemed to be a reflection on his credibility as a witness before the Board.
Mr. Koca's testimony focused on the training and certification of John Hughes, and on the testing of QA/QC trainees. On these issues there have been no findings by the NRC Staff which would indicate that the specific allegations were substantiated or suggest that Mr. Koca was anything but truthful before the Board.
Very truly yours,
.}/, '( /< WN.'
.4_m,-, . .,,,--
MIM/lw Enclosure cc: Service List
w e o UNITED STATES
![' nacr ,io,
~,
n NUCLEAR REGULATORY COMMISSION 5- -
1 WASHING TON. D. C. 20555
'o %i y ...../
- 1C ') 1983 Docket No.
- STN 50-454 Mr. Dennis L. Farrar Director of Nuclear Licensing Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690
Dear Mr. Farrar:
Subject:
Information Needed Prior to Fuel Load of Byron 1 Your letter of September 23, 1983 revised the target date for Byron 1 fuel load to February 15, 1984. It is our goal to resolve by fuel load all the outstanding items and confirmatory issues identified in our original Safety Evaluation Report (SER).
Enclosure 1 summarizes the information we need from you to resolve these issues. If an item is not listed in the enclosure, it means that is resolved or that we have all the information that we need at this time. (Supplement 3 to the SER, issued in November 1983, provides a summary of all the resolved items.)
Provide a response to the items in Enclosure 1 or a justification for proceeding with fuel load with the item unresolved. We need this response at least 60 days prior to your fuel load date so that we may complete our safety evaluation 30 days prior to fuel load.
All the items have been discussed extensively with T. Tramm of your staff.
However, if you need further clarification contact L. 01shan, the Licensing Project Manager, at 492-7070.
Sincerely,
" ' k%,
B.J.l.,oungbloo, Chief Licen ing Branc No. 1 Division of Licensing
Enclosure:
As stated cc: See next page mmmm
~ **
EXHIBIT C
_ ,, .,r-- .------m ENCLOSURE 1 INFORMATION NEEDED PRIOR TO BYRON 1 FUEL LOAD Outstanding Items (1) Additional information to confirm pipeline foundation design - Provide soils information at area 12 as requested in our June 1,1982 letter. The infcrmation provided thus far is not sufficient for us to resolve the concern for differential soil settlement effects on the pipeline.
(2) Turbine missile evaluation - Provide the turbine maintenance program discussed during the November 17, 1983 meeting (meeting summary issued December 6,1983.)
(4) Pump and valve operability assurance - Provide the information we requested during discussions on November 8, 1983.
(6) Seismic and dynamic qualification of equipment - Provide the information we requested during discussions on November 8, 1983.
(7) Environmental qualification of electrical equipment - Provide the remaining information not included in your December 6, 1983 letter.
(9) TMI action item II.F.2: Inadequate Core Cooling Instrumentation. Expand
, your August 13, 1982 response, Item (4), to explain how your system conforms to NUREG-0737 Item II.F.2.
(10) Steam Generator flow-induced vibrations - Provide the plant-specific information discussed on page B-85 of NUREG-1014 " Safety Evaluation Report related to the D4/05/E Steam Generator Design Mcdificaten."
(13) Fire protection program - Provide responses to the concerns disce , sed in our August 3,1983 letter and again discussed in the October 28, 1983 meeting (meeting summary issued November 1, 1983).
(17) Control iaom human factors review - Provide the responses discussed during the October 26, 1983 meeting (meeting summary issued November 7, 1983).
Confirmatory Issues (1) Confirmatory analysis to verify river screenhouse seismic response analysis - confirm the soil properties used the analysis reauested on page 2-32 of the original SER. Your June 15, 1983 letter and the the additional information you provided in December 1983 is not
-sufficient.
(16) Charging pump deadheading - Your September 16, 1983 letter proposes an interim plan of operation until the changes are completed. Provide a discussion of the worst single failure for this interim plan, as we reouested during a November 30, 1983 telephone conversation.
2-(28) TMI Item II.K.3.1 - Provide justification that your valves are enveloped by the generic response.
TMI Item III.D.1.1 - Provide the information discussed on page 9-23 of the original SER.
THI Item II.D.1 - Provide results of the analysis discussed on page 10 of your October 26, 1982 letter.
(34) RCP rotor seizure and shaft - Provide discussion of the effects of a stuck open secondary valve.
(35) Anticipated transients without scram - Provide the portions of the i Procedures Generation Package that we requested during the November 10, 1983 telephone consersation.
4
,e - , , --. --- n---- - . - - - -- - = , - r -m ,, , , -- ----. - - - - - - ,- . - , - --
Mr. Dennis L. Farrar Director of Nuclear Licensing Commonwealth Edison Company Post Office Box 767 Chicago. Illinois 60690 cc: Mr.. William Kortier Ms. Diane Chavez Atomic Power Distribution 326 N. Avon Street i Westinghouse Electric Corporation Rockford, Illinois 61103 Post Office Box 355 Pittsburgh, Pennsylvania 15230 Mr. James G. Keppler U. S. Nuclear Regulatory Commission Michael Miller Region III Isham, Lincoln & Beale 799 Roosevelt Road One First National Plaza Glen Ellyn, Illinois 60137 42nd Floor Chicago, Illinois 60603 Joseph Gallo, Esq.
Isham, Lincoln & Beale Mrs. Phillip B. Johnson Suite 840 1907 Stratford Lane 1120 Connecticut Avenue, N. W.
Rockford, Illinois 61107 Washington, D. C. 20036 Dr. Bruce von Zellen Doug Cassel, Esq.
Department of Biological Sciences Jane Whicker, Esq.
, Northern Illinois University 109 N. Dearborn Street DeKalb, Illinois 61107 i Ch~cago, Ill'inois 60602 Mr. Edward R. Crass Ms. Pat Morrison Nuclear Safeguards & Licensing 5568 Thunderidge Drive Sargent & Lundy Engineers Rockford, Illinois 61107 55 East Monroe Street Chicago, Illinois 60603 David C. Thomas, Esq.
77 S. Wacker Drive Mr. Julian Hinds Chicago, Illinois 60601 U. S. Nuclear Regulatory Commission
! Syron/ Resident Inspectors Offices
! 4448 German Church Road Byron, Illinois 61010 l
l
00tMETEr, UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
'83 DEC 27 Pl2:58 In the Matter of OfflCE OF SELRtiA' COMMONWEALTH EDISON COMPANY ) Docket No.50-45Y $$NC
) 50-455 i (Byron Station, Units 1 and 2) )
. )
CERTIFICATE OF SERVICE l I hereby certify this 22nd day of December, 1983, that copies of " MOTION-TO REOPEN RECORD AND FOR ORDER IMPOSING COMMITMENTS" in the above-captioned proceeding were served on the following by deposit in the United States mail.
Ivan W. Smith, Chairman Richard J. Rawson Administrative Judge Office of Executive Legal Atonic Safety and Licensing Director Board U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, D.C. 20555 Washington, D.C. 20555 Office of the Secretary of Dr. Dixon A. Callihan the Comm1ssion Administrative Judge Attn: Docketing & Service Union Carbide Corporation Section P.O. Box Y U.S. Nuclear Regulatory Oak Ridge, Tennessee 37830 Commission Washington, D.C. 20555 Dr. Richard F. Cole Administrative Judge David Thomas , Esq.
Atomic Safety and Licensing 77 South Wacker Drive Board Chicago, IL 60621 U.S. Nuclear Regulatory Commission Joseph Gallo, Esq.
Washington, D.C. 20555 Isham, Lincoln & Beale 1120 Connecticut Ave., N.W.
Alan P. Bielawski, Esq. Room 325 Bruce Becker, Esq. Washington, D.C. 20036
, Isham, Lincoln & Beale Three First National Plaza Chicago,s IL 60603 ,
~
O i ~
JANEM.WHICHEy
_ ----------