Special Rept:Fire Barriers Breached for Longer than 7 Days. Fire Protection Was Impaired.Caused by App R Alternative Shutdown Work.Plant Continues to Implement Compensatory Measures as Applicable.Breached Barriers Listed
ML17347A526
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/05/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-87-239, NUDOCS 8706100056
Download: ML17347A526 (6)


Text

tl REGULATORY I ~ RNATION DISTRIBUTION SYST N (RIDS)

T ACCESSION NBR: 8706100056 DOC. DATE: 87/06/05 NOTARIZED: NO DOCKET ¹ FACIL: 50-250 Turkey Point Planti Unit 3I Florida Power and Light C 05000250

'(A 50-251 Turkey Point Plant Unit 4 Florida Power and Light C 05000251 AUTH. NANE AUTHOR AFFILIATION WOODY> C. O. Florida Power (k Light Co.

REC IP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special rept: fire barries breached for longer than 7 dags.

Fire protection was impairedi caused bg *pp R alternative

'shutdown work. Plant continues to implement compensatori}

measures as applicable. Breached barriers listed.

DIBTRIBVTION CODE: IE22D COPIEB RECEIVED: LTR ~ ENCL Q BIZE:

TITLE: 50. 73 Licensee Event Report (LF'R) Incident Rpt. etc.

NOTES:

I REC P IENT COPIES RECIPIENT COP IEB ID CODE/MANE LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 gcDONALDi D } 1 INTERNAL: ACRS NICHELSON 1 ACRS NOELLER 2 2 AEOD/DOA 1 AEOD/DSP/ROAB 2 2

  • EOD/DSP/TPAB 1 1 DEDRO 1 NRR/DEST/ADE } 0 NRR/DEST/ADS 1 0 NRR/DEBT/CEB 1 1 NRR/DEBT/ELB 1 NRR/DEST/ICSB 1 1 NRR/DEST/NEB 1 NRR/DEBT/NTB 1 NRR/DEST/PSB 1 1 NRR/DEST/RSB } ViRR/DEST/SGB 1 NRR/DLPO/HFB 1 1 NRR/DLPQ/GAB NRR/DOE*/EAB 1 1 NRR/DREP/RAB 1 NRR/DREP/RPB 2 2 /ILRB NRR/PNAS/PTSB 1 REG FIL 02 1 RES DEPY QI 1 1 RG FILE 01 1 EXTERNAL: EQ8<Q QROHp N 5 5 H ST LOBBY WARD LPDR 1 1 NRC PDR NSIC HARRIS' 1 1 NSIC MAYST' TOTAL NUMBER OF COPIES REQUIRED: LT1R 42 ENCL 40 I

P 0 B 4000 JUNO BEACH FL 3340B FLORIDA POWER & LIGHT COMPANY JUNE O5~ J.to-L'-87-239 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I Special Report - Breached Fire Barriers and Other Fire Protecton S stem Im airments In accordance with Technical Specification 6.9.3 the attached Special Report is provided for your information.

Should there be any questions on this information, please contact us.

Very truly yours, 8 vi.P~

(C. O. Woody Group Vice President Nuclear Energy COW/SDF/gp Attachment cc: Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 870b10005b 870b05 PDR ADOCK 05000250 gyp'DF 8 PDR PEOPLE... SERVING'EOPLE I /022/ I

SPECIAL REPORT JUNE 6, 1987 PIRE PROTECTION SYSTEM IMPAIRMENTS REQUIRING NRC NOTIFICATION

~Pur eee:

Technical Specification (TS) 3.14.5.b requires the submission of a report to the NRC if a non-functional fire barrier penetration is not returned to functional status within 7 days. TS 3.14 states that certain other conditions also require NRC notification. In accordance with the above requirements, this special report is being generated in order to notify the NRC. This report will be updated on a 30 day basis until the Appendix R associated work is complete.

Event:

The plant has been and is continuing to implement numerous modifications, mainly in accordance with Appendix R Alternate Shutdown requirements.

The schedular exemptions for the Safe Shutdown modifications, which outlined the alternative compensatory measures to be taken when a barrier is breached, expired on September 30, 1986, and on October 1, 1986. Upon the expiration of the exemptions, the compensatory measures as described in Attachment 1 of our letter L-.85-386 (dated October 11, 1985), are continuing to be in place until the 'Safe Shutdown modifications are complete. Breaches incurred during Alternate Shutdown modifications are governed by the Technical Specifications or the exemptions, as applicable. Impairments are also incurred as part of plant maintenance and during the implementation of plant modifications.

Cause and Corrective Actions:

The major cause of the impairments is the Appendix R Alternate Shutdown work which remains to be completed. Due to the large volume of work being performed, the plant is reporting the impairments in this one report, rather than on a case-by-case basis. The impairments reported this month are either open or closed at the present time, .but were open in excess of the time period permitted without requiring NRC notification (see attached lists of impairments).

The plant continues to implement the compensatory measures as applicable.

ATTACHMENT FIRE PROTECTION SYSTEM IMPAIRMENTS CLOSED IN MAY BUT WERE OPEN FOR LONGER THAN TECH SPEC LIMIT Breach or Impairment Open Closing Number Descri tion Date Date I068 Fire Doors 070-3 03/23/87 05/I I /87 I072 Fire Doors 058-3 o4/os/s7 05/07/87 I075 Fire Doors 46-2 04/20/87 05/20/87 87-02I4 Penetration Seals No. I06F-E I 96 04/09/87 05/02/87 87-02IS Penetration Seals No. I06F-E205 04/I 0/87 05/02/87 87-02I9 Penetration Seals No. 106F-E203 04/I I /87 05/02/87 87-0220 Penetration Seals No. I 06F-E22 I 04/I I /87 05/02/87 87-0221 Penetration Seals No. I 06F-E222 04/I I /87 05/02/87 87-0222 Penetration Seals No. I 06F-E I 92 O4/I I/S7 , 05/02/87 87-0223 Penetration Seals No. I 06F-E204 04/I I /87 05/02/87 87-0237 Penetration Seals No. I 06F-E I 25 04/22/87 05/02/87 87-0238 Penetration Seals NO. I 06F-E223 04/22/87 05/02/87 FIRE PROTECTION SYSTEM IMPAIRMENTS OPENED SINCE APRIL REPORT WHICH HAVE BEEN OPEN FOR LONGER THAN TECH SPEC LIMITS Breach or Impairment Open Number Descri tion Date I079 Water Suppression Systems 04/24/87 I080 Water Suppression Systems 04/24/87 I086 Conduit Seals l6 os/o7/s7 I089 Fire Doors I 06. I 05/08/87 I093 Fire Door 096-I 05/I2/87 87-250 Radiant Energy Shield 05/02/87 87-251 Penetration 70C-E007 o5/o5/s7 87-252 Raceway Protection (Wireway. 3WW 4 I 5) 05/13/87 87-260 Fire Barriers I I 0-5-E003 05/25/87 87-26I Fire Barriers I 08A-Nl-E009 05/25/87 87-262 Fire Barriers I 08B-5-E006 05/25/87 87-263 Fire Barriers I 03S-E006 05/25/87 87-264 Fire Barriers I OI M-EOI3 05/25/87 87-265 Fire Barriers I 04S-E006 05/25/87 SDF I /022/3

~ ~ ~

g The following impairments were incurred prior to May, 1987, however they are being included in this report as they were not reported previously.

Imp// Description Open Closed 87-0207 Fire Door 55.2 4/04/87 4/27/87 87"0209 Fire detection systems 4/06/87 4/27/87 87-0211 Fire barrier 070E-3010 4/07/87 4/22/87 87-0228 Fire Door D019-1 4/14/87 4/27/87 87-0229 Fire Door D020-1 4/14/87 4/27/87 87-0235 Fire Door D058-3 4/16/87 4/27/87