REGULATORY ORI'lATION DISTRIBUTION SY l (R IDS)

ACCESSIQN NBR: 8703250427 DOC. DATE: 87/03/18 NQTARI ZED: NQ DOCKET FACIL: 5'0-251 Turkey Point Planti Unit 4i Florida Power and Light C 05000251 AUTH. NANE AUTHOR AFFILIATION WOODY'. O. Florida Power Zc Light Co. H RECIP. NANE RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

IAEA RO 87-02: on 8703f5. informed NRC of necessity of removing IAEA seals on equipment hatch h,missile shields to maintained bg three remaining seals on reactor head.

DISTRIBUTION CODE: EOOSD COPIES RECEIVED: LTR TlTLE: Part 75 IAEA Safeguards Data NOTES:

/ ENCL j perform insp 5 maint activities. Surveillance of reactor SIZE:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NANE LTTR ENCL ID CODE/MANE LTTR ENCL PWR-A PD2 LA 1 0 PWR-A PD2 PD 1 0 NcDONALDi D 1 1 INTERNAL: AEOD/PTB 1 0 IE/DI/ORPB 1 1 NllSS/SC 6 6 NRR PWR-B SSPD 1 yE 01 f 1 RQN2 1 EXTERNAL: LPDR 1 0 NRC PDR 0 TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL 11

h I

Uf Uf" '

UF lF DPI I) Pr <<,l U

$ 1 lith 09<

+txf".F Uq O'P3& <<A~

MARCH 18 1987 L7-135 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Re: Turkey Point Unit 4 Docket No. 50-25 I IAEA Re ortable Occurrence 87-02 This letter and its attachment provide written notification in accordance with NRC letter dated June 3, l 986 of IAEA Reportable Occurrence 87-02.

Should additional information be required, please contact us.

Very truly yours, C. O. ody Group Vice President Nuclear Energy COW/TCG/pm Attachment cc: Dr. J. Nelson Grace, Regional Administrator, Region ll, USNRC Mr. Gene Sparks, NRC Washington, M.S. 88I55 Senior Resident Inspector, USNRC, Turkey Point Plant 9703P504 870318 0500 PDR PDR 8

an FPL Group company TCG6/002/ I

a.

r lN

~ 0 P

i I 4

'L 0

A I

~-

~ ~

IAEA REPORTABLE OCCURRENCE 87-02 Summa of Events:

W

((

At 1750 on March 15, 1987, Mr. Gene Sparks, NRC Office of Nuclear Material Safety and Safeguards, was informed of the, necessity of removing the lAEA seals on the equipment hatch and on the missile shields. This was required in order to perform inspection and maintenance activities in the reactor head area because of a buildup of boric acid in that area resulting from a leak at an instrumentation penetration pressure boundary seal. The seals on the equipment Patch were cut at 1900 on March 15, and the seals on the missile shields were removed at approximately 1300 on March 16.

Results:

1) There are three remaining seals on the reactor head. The lAEA will be notified as soon as possible if these need to be removed.
2) All four of the lAEA seals on the equipment hatch were removed and retained by FPL.
3) Both of the lAEA seals on the missile shields were removed and retained by FPL.

Conclusion:

The continuous surveillance of the reactor is being maintained by the three remaining seals on the reactor head.

TCG6/002/2