Special Rept:Nonfunctional Fire Barrier Pentration Not Returned to Functional Status within 7 Days.Caused by Incomplete App R Alternate Shutdown Work.Compensatory Measurements Continuing.List of Breached Barriers Encl
ML17347A346
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/06/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-87-110, NUDOCS 8703160201
Download: ML17347A346 (9)


Text

REQULATORY -ORMATION DISTRIBUTION 'SY M (RIDS)

ACCESSION NBR: 8703160201 DOC. DATE: 87/03/06 NOTAR I ZED: NO DOCKET FACIL: 50-250 Turkey Point Planti Unit 3I Florida Power and Ligh+ C 05000250 50-251 Turkey Point Plant> Unit 4I Florida Power and Ligh+ C 05000251 AUTH. NAME AUTHOR AFFILIATION NOODYi C. O. Florida Power h Light Co.

RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special rept: nonfunctional fire barrier pentration not returned to functional sta+us within 7 days. C'avsed bg incomplete App R alternate shutdown work. Compensatorg measurements continuing. List of breached barriers encl.

DISTRIBUTION CODE: ADDED TITLE: OR/Licensing Submittal:

COPIEB RECEIVED: LTR Fire Protection 2 ENCL I BI ZE:

NOTES:

REC IP IENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PNR-A PD2 LA 0 PWR-A PD2 PD 04. 5 5 l /cDONALDp D 1 1 PWR-A PSB 1 1 INTERNAL: ADM/LFMB 1 0 IE WHITNEY' 1 1 NRR STANQ J 07 2 2 NRR MERME ILi J06 1 0 OQC/HDS2 1 0 R FIL 01 1 EXTERNAL: LPDR 03 1 1 NRC PDR 02' 1 NSlC 05 1 1 TOTAL NUMBER OF COPIES REQUIRED: LT1R 18 ENCL 14

N U

~

~

P. O. Bo 00, JUNO BEACH, FL 33408.0420

.ht,"I "Xr',

~>i"p! uuuu i

set'H L-87-I I 0 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I S ecial Re ort - Breached Fire Barriers In accordance with Technical Specification 6.9.3 the attached Special Report is provided for your information.

Should there be any questions on this information, please contact us.

Very truly yours,

. O. Woody Group Vice President Nuclear Energy COW/RG/gp Attachment cc: Dr. J. Nelson Grace, Regional Administrator, Region ll, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 8703160201 870306 PDR ADOCK 05000250 8 PDR an FPL Group company RG3/0 I 4/ I

~

~

h 'I n

~ ~

II

SPECIAL REPORT MARCH 6, 1987 FIRE BARRIERS BREACHED FOR LONGER THAN SEVEN DAYS

~Pur ose:

Technical Specification 3.14.5.b requires the submission of a report to the NRC if a non-functional fire barrier penetration is not returned to functional status within 7 days. In accordance with the above requirement, this special report on the breached barriers is being generated in order to notify the NRC. This report will be updated on a 30 day basis until the Appendix R associated work is complete.

Event:

The plant has been and is continuing to implement numerous modifications, mainly in accordance with Appendix R Alternate Shutdown requirements.

The schedular exemptions for the Safe Shutdown modifications, which outlined the alternative compensatory measures to be taken when a barrier is breached, expired on September 30, 1986, and on October 1, 1986. Upon the expiration of the exemptions, the compensatory measures as described in Attachment 1 of our letter L-85-386 (dated October 11, 1985), are continuing to be in place until the Safe Shutdown modifications are complete. Breaches incurred during Alternate Shutdown modifications are governed by the Technical Specifications or the exemptions, as applicable.

Cause and Corrective Actions:

The ma)or cause of the breached barriers is the Appendix R Alternate Shutdown work which remains to be completed. Due to the large volume of work being performed, the plant is reporting the breaches in this one report, rather than on a case-by-case basis. The breaches reported this month are breaches which are, either open or closed, but were open for longer than 7 days (see attached list of breached barriers).

The plant continues to implement the compensatory measures as applicable.

~ I

<<T

~ <<

4

'>'f 4

4 4 If <<

PAGE1

(

TURKEY POINT PLAHT

- NUCLEAR IHPAIRHEHT COHTROL SYSTEH

- 1986 FILE: ICS86. MK1 REV DATE: 03/0$ /87 IHPAIRHEHTs REQUEST HUHBER s HO.

s86"0280 s

s DESCRIPTIOH sRACEMAY PROTECTION HO:8 ZJ1712 4's ssOPEH DATE s CLOSIHG DATE ssl2/18/86 s02/04/87 s s ss ss NOTE: BREACHES TO FIRE BARRIERS CLOSED IN FEBRUARYs BUT HERE OPEHED FOR NORE THAH 7 DAYS.

PAGE1 TURKEY POINT PLANT

- NUCLEAR IMPAIRNENT CONTROL SYSTElf - 1987 FILE: ICS87. MK1 REV DATE: 03/03/87 s INPAIRHEHTs REQUEST s CLOSIHG ss a HUNBER a HO. DESCRIPTIOH saOPEH DATEa DATE sa s

s

'87 s87-0028 0065 s87-0066 sSTRUCTURAL STEEL FIREPROOFING NENBER:M14X30saOI/08/87 sFIRE BARRIERS HO:070H ED'FIRE BARRIERS HO:070H-E055 s02/05/87 aa01/19/87 s02/06/87 sa01/19/87 s02/06/87 as ss sa s87-0067 aFIRE BARRIERS NO:098H-E043 as01/19/87 a02/06/87 a87-0069 s FIRE BARRIERS HO:070E-E009 s a01/19/87 s02/10/87 s s s87 0071 'FIRE BARRIERS HO:098E-E034 as01/19/87 s02/10/87 4

)87-0073 aFIRE BARRIERS HO:041E EOOD a'01/19/87 <02/D/87 si HOTE: BREACHES TO FIRE BARRIERS CLOSED IH FEBRUARY, BUT MERE OPENED FOR NORE THAH 7 DAYS.

PAGE1 TURKEY POINT PLANT

- HUCLEAR INPAIRMENT COHTROL SYSTEN

- 1987 FILE: ICS87. HK1 REV DATE: 03/0$ /87 as a INPAIRHENTa REQUEST as CLOSIHG as

'O.

NUHSER a a DESCRIPTIOH aaOPEH DATEa DATE sa as al038 a aPEHETRATIOH DISCREPAHCY PER NCR 87-0022 ss02/05/87 a aa aa aai059 aPEHETRATIOH DISCREPAHCY PER HCR 87-0022 aa02/05/87 a as as

<1041 s aPENETRATIOH DISCREPAHCY PER NCR 87-0022 ss02/05/87 a as as a 1051 l034 a aFIRE DOORS NO:101.1 F<C6 PA&PE'R. l ~ aa02/10/87 oc(a,e/am a aa a .I