Special Rept:On 860930 & 1001,schedular Exemptions for Safe Shutdown Mods Expired Due to Large Number of Mods Being Performed.Plant Continues to Implement Compensatory Measures as Applicable.Rept Will Be Updated on 30-day Basis
ML17342A893
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/08/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-87-372, NUDOCS 8709110279
Download: ML17342A893 (5)


Text

REGULATORY IFORMATION DISTRIBUTION SY M (RIDS)

ACCESSION NBR 870110279 DOC. DATE: 87/09/08 NOTARIZED: NO DOCKET FAC IL: 50-250 Turkey Point Planti Unit 3i Florida Poeer and Light C 05000250 50-251 Turkey Point Plant. Unit 4i Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION WOODY> C. O. Florida Power h- Light Co.

RECIP. NAME RECIP I ENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special rept: on 860930 h 1001I schedular exemptions for safe shutdoen mods expired due to large number of mods being performed. Plant continues to implement compensatorg measures as applicable. Rept mill be updated on 30-day basis.

DISTRIBUTION CODE: IE22D. COPIES RECEIVED: LTR I ENCL TITLE: 50. 73 Licensee Event Report (LER)i Incident

+

Rpt.

SIZE:

etc.

NOTES:

REC IP IENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 McDONALDi D 1 INTERNAL: ACRS MICHELSON '1 ACRS MOELLER 2 2 AEOD/DOA 1 1 AEOD/DSP/NAS 1 AEOD/DSP/ROAB 2 2 AEOD/DSP/TP*B 1 1 DEDRO 1 1 NRR/DEST/ADS 0 NRR/DEST/CEB 1 NRR/DEST/ELB 1 1 NRR/DEST/ I CSB 1 1 NRR/DEST/MEB 1 1 NRR/DEST/MTB 1 1 NRR/DEST/PSB 1 NRR/DEST/RSB 1 1 NRR/DEST/SQB 1 1 NRR/DLPG/HFB 1 1 NRR/DLPG/GAB 1 1 NRR/DOEA/EAB 1 NRR/DREP/RAB 1 1 NR E PB 2 2 NRR/PMAS/ILRB 1 1

~LEORD) J 02 1 1

1 1

RES DEPY QI RES/DE/EIB 1

1 1

1 RQN2 FILE 01 1 1 EXTERNAL: EGS<G GROH> M 5 5 H ST LOBBY WARD LPDR 1 NRC PDR 1 1 NSIC HARRISI J 1 1 NSIC MAYSI Q 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 43 ENCL 42

P. O. B 000, JUNO BEACH, f.L 33408 0420 SEPTEMBER 0 8 IS87 L-87-372 U. S. Nuclear Regulatory Commission A t tn: Documen t Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I Special Report - Breached Fire Barriers and Other Fire Protection S stem lm airments In accordance with Technical Specification 6.9.3 the attached Special Report is provided for your information.

Should there be any questions on this information, please contact us.

Very truly yours, C. O. Woody Group Vice resident Nuclear Energy COW/SDF/gp Attachrnent cc: Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant gZ+

8709fi0279'70908 PDR ADOCK 05000250 8 PDR an FPL Group company SDF I/004/I

SPECIAL REPORT SEPTEMBER 8, 1987 FIRE PROTECTION SYSTEM IMPAIRMENTS REQUIRING NRC NOTIFICATION

~Pur eee:

Technical Specification (TS) 3.14.5.b requires the submission of a report to the NRC if a non-functional fire barrier penetration is not returned to functional status within 7 days. TS 3.14 states that certain other conditions also require NRC notification. In accordance with the above requirements, this special report is being generated in order to notify the NRC. This report will be updated on a 30 day basis.

Event:

The plant has been and is continuing to implement modifications in accordance with Appendix R Alternate Shutdown requirements and other unrelated requirements. The schedular exemptions for the Safe Shutdown modifications, which outlined the alternative compensatory measures to be taken when a barrier is breached, expired on September 30, 1986, and on October 1, 1986. Upon the expiration of the exemptions, the compensatory measures as described in Attachment 1 of our letter L-85-386 (dated October ll, 1985), are continuing to be in place until the Safe Shutdown modific'ations are complete. Impairments incurred during Alternate Shutdown modifications are governed by the Technical Specifications or the exemptions, as applicable. Other impairments are governed strictly by the Technical Specifications.

Cause and Corrective Actions:

The ma)or cause of the impairments is the large number of modifications being performed. Due to the large volume of work being performed, the plant is reporting the impairments in this one report, rather than on a case-by-case basis. The impairments reported this month are either open or closed at the present time, but were open in excess of the time period permitted without requiring NRC notification (see lists on page 3).

This report includes impairments which were:

1) opened prior to September and
2) stayed open for longer than the time permitted by the Technical Specifications, and
3) are either still open or were closed prior to September.

The plant continues to implement the compensatory measures as applicable.

FIRE PROTECTION SYSTEM IMPAl NTS OPENED SINCE JULY REPORT CH HAVE BEEN OPEN FOR LONGER THAN TECH SPEC LIMITS Imp// Description Open Closed 1150 Water Suppression System 08/06/87 1168 PTS 41 & 42 08/18/87 1046 Fire Door 106.2 07/24/87 . 08/11/87 1160 Conduit Seal 08/14/87 08/26/87 1161 Conduit Seal 08/14/87 08/26/87 87-0326 Fire Detection System 07/30/87 08/14/87 87-0323 Penetration Seal 097F"E014 07/30/87 87-0324 Penetration Seal 106F-E368 07/30/87 87-0325 R. P. A384-30-0181-3271 07/30/87 FIRE PROTECTION SYSTEM IMPAIRMENTS CLOSED SINCE JULY REPORT BUT WERE OPEN FOR LONGER THAN TECH SPEC LIMITS Impt Description Open Closed 1034 Fire Damper 72A 01/28/87 08/11/87 1071 Fire Barrier Thermal Lagging 04/02/87 08/25/87 87-0251 Penetration Seal 70C-E007 05/05/87 08/14/87 87-0314 Raceway Protection 07/07/87 08/17/87 87-0156 Conduit Seal 106E-E015 03/14/87 07/10/87 87-0290 Penetration Seal 30F-M003 06/12/87 07/10/87 87-0291 Penetration Seal 30F-M046 06/12/87 07/10/87 87-0293 Fire Door Elec. Penet. 019.1 06/15/87 07/31/87

. 87-0300 Penetration Seal 28E-H001 06/09/87 07/10/87 1089 Fire Door 106.1 05/08/87 07/13/87 1115 Fire Barrier 06/21/87 07/09/87 87-0154 Conduit Seal 70E-E008 03/14/87 07/24/87 87-0155 Conduit Seal 71E-E007 03/14/87 07/24/87 87-0156 Conduit Seal 106E-E015 03/14/87 07/10/87 87-0157 Conduit Seal 1084E-E003 03/14/87 07/10/87

A;4 4i ~ A.

The following impairments were incurred prior to August 1987, owever they are being included in this report as they were not reported previously.

Imp8 Description Open Closed 87-0316 Penetration Seal 067N-E003 07/16/87 07/24/87 87-0317 Penetration Seal 068E-E002 07/16/87 07/24/87 3,