RO 86-05:on 860817,during Repair of Control Rod in Position J-5,technician Caught Foot in IAEA Seal String.String Broke. Four Remaining Seals Intact.Seal & String Will Be Turned Over to IAEA During Insp on 860821 & 22
ML17342A668
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 08/20/1986
From: Woody C
FLORIDA POWER & LIGHT CO.
To: Mcdonald D
Office of Nuclear Reactor Regulation
References
86-05, 86-5, L-86-334, NUDOCS 8608260205
Download: ML17342A668 (6)


Text

REQULA1 iY INFQRNATIQN DISTRIBUTIQ "YSTEi'1 (BIDS)

ACCESSlON NBR: 8608260205 DQC. DATE: 86/08/20 NOTARIZED: NO DOCKET FACIL: 50-25i Turkey Point'lant> Unit 4> Florida Poeer and Light C 0500025i AUTH. NANE AUTHOR AFFILIATION WOODY> C. O. Flov ida Power h Light Co.

RECIP. NANE RECIPIENT AFFILIATION 1'1CDONALD> D. G. PWR Pv object Directov ate 2

SUBJECT:

RO 86-05:on 8608i7> during repair of control v'od in Position J-5> technician caugh foot in IAEA seal stv ing. Stv ing broke.

Four v emaining seals intact. Seal 5 string thrill be turned over to IAEA duv ing insp on 86082i a8 22.

DISTRIBUTION CODE: S006D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: lAEA Safeguards Data NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAl'1E LTTR ENCL ID CODE/NA1'1E LTTR ENCL PWR-A PD2 LA i 0 PWR-A PD2 PD 0 11cDONALD, D i6 i i INTERNAL: AEOD/PTB i 0 IE/DI /ORPB i NNSS/SYNC 02 6 6 NRR PWR-B SSPD f i Oi 2 RGN2 i2 i i EXTERNAL: LPDR i 0 NRC PDR i 0 TOTAL NUNBER OF COPIES REQUIRED: LTTR 16 ENCL

il C

FLORIDA POWER 5 LIGHT COMPANY AU6 2 0 1998 L-86-330 Office of Nuclear Reactor Regulation Attention: Mr. D. G. McDonald, Jr., Project Manager PWR Project Directorate 7/2 Division of PWR Licensing - A U. S. Nuclear Regu!atory Commission Washington, D. C. 20555

Dear Mr. McDonald:

Re: Turkey Point Unit 0 Docket No. 50-251 IAEA Re ortable occurrence 86-05 This letter and its attachment provides written notification of IAEA Reportable Occurrence 86-05 as requested by your June 3, 1986 letter.

Should you require additional information, please contact us.

Very truly yours, C. O. Woody Group Vice President Nuclear Energy COW/SA V:aa Attachment cc: Harold F. Reis, Esquire Mr. Gene Sparks, NRC Washington, M.S. 88155 PNS-LI-86-193 8b082b0205 8b0820 0500025i, PDR ADOC'K PDRj Ll:1 PEOPLE... SERVING PEOPLE

f I

t

ATTACHMENT RE: IAEA REPORTABLE OCCURRENCE 86-05 Summar of Event:

On the evening of Sunday, August 17, several Instrumentation and Control (IRC) technicians and their supervisors went on top of the reactor head to repair the control rod in position 3-5. This repair was necessary to bring the reactor critical and was performed at Hot Standby conditions. During this repair job, an IRC technician caught his foot in the string for one of the IAEA seals and caused the string to snap and break. The IRC crew retained the seal and string, and they will be given to the IAEA inspection team which will be at Tu'rkey Point on August 21 and 22, 1986.

Results:

1.Seal number N-68350 was broken and removed from the reactor head.

2. The four remaining seals are still intact and on the reactor head.
3. The seal and string were removed from the Radiation Control Area and will be turned over to the IAEA.

==

Conclusion:==

There was no breach of the IAEA monitoring program of the reactor core because four seals are still intact on the reactor head.

4 h,

~ yhl .'>El,' K 'hh Kltlf,4 C'I, 4 4 $ yt 4., ~

I

~ J t llfl I )

Jl

~ 4 K ~ AK )

>16 4 l 4

~ ~ '

4 44 4.4 4 K 4 4 4 hh K

  • 4 ',4" 4 l,t 4 4

'4' K

hl 4

J.J I K

> ~ (

-4 4 J

4'4 4 I 4 ~

h

)

Kti lh I

~ I