Submits Rept Re Results of Leakage Exams Conducted During Fall 1988 Refueling Outage,Per TMI Item III.D.1.1 Re Leakage Outside Containment.None of Identified Leakage Considered to Be Excessive
ML20246F586
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/24/1989
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TASK-3.D.1.1, TASK-TM ELV-00812, ELV-812, NUDOCS 8908310064
Download: ML20246F586 (2)


Text

. - _ _ _ - _ _ _ = . __ _ _ . _ . . _ . .

e, --

n Georgd P6*e/Ctspary 0' #._

L333 Pedmont AveNe.

  • Atlanta. Georg;a 30308 '

W' T,7 Telennone 404 526-3 95 Ma+ng Address-401nverness Center PatFway

. Post Offce Box C05

+Brmingham. Alatema35201

Tele $one 205 fiEB 5561 rWmme ' Orcix-t 7 ELY-00812 W. G. Hairston,11' Sernor %ce President ' 1603n roc,ar operatens-August 24 1989

-U. S. Nuclear Regulai.ory Commission ATTN:- Document Control Desk-Washington,l D. C. 20S55 V0GTLE ELECTRIC GENERATING PLANT NRC DOCKET 50-424 OPERATING LICENSE NPF TMI ITEM III.D.l.1: ' LEAKAGE'0UTSIDE' CONTAINMENT L

Ref: ' Letter from J.' A. Bailey to the Director of NRR Log: . GN-1029, dated 8/5/86

' Gentlemen: -

Per'th3 commitment advanced in the referenced letter, Georgia Power Company hereby submits a report regarding the results of leakage examinations conducted during the Fall 1988 refueling outage. Certain systems were examined for leakage outside containment pursuant to item III.D.1.1 of NUREG 0737. For the liquid systems, the leakage survey was performed at or as near as prectical to operating temperatures and pressures. Leakage paths were identified visually. Gaseous system leakage was measured'using a leak rate monitor while a soap bubble solution was used to identify leakage paths.

.The following ~ systeins were leak tested:

Residual Heat Removal System Containment Spray System (Excluding the NaOH portion)

Safety' Injection System (Excluding the Accumulators)

Cher.ical and Volume Control System (Letdown, Charging and Boron Recycle)

Post Accident Sampling System Nuclear Sampling System (Pressurizer Steam and Liquid Sample Lines, Reactor Coolant Sample Lines, RHR Sample Lines, CYCS Demineralized, and Letdown Heat Exchanger Sample Lines only)

Gaseous Waste Processing System 0

ga$n WOF Y P

s

Georgia PowerQ n

U S. Nuclear Regulatory Commission ELV-00812 L

-Page 2- ,

None of the identified leakage was considered to be excessive. Therefore, since~ the leakage from liquid systems is contained via floor drains and

. gaseous system leakage. is. contained via ventilation filters, the identified leakage was judged to be acceptable. However, work orders were issued in an effort to reduce leakage to a level as low as practical.

'Should you have questions regarding this submittal, please contact this office..

Sicperely, lA;A Y W. G. Hairston, III xc: Georgia Power Company Mr. C. K. McCoy .

Mr. G. Bockhold, Jr.

Mr. R. M. Odom Mr. . P. D. Rushton NORMS Southern Company -Services Mr. J. L. Leamon U. S. Nuclear Regulatory Commission Mr. -5. D. Ebneter, Regional Administrator Mr. J. B. Hopkins, Licensing Project Manager, NRR Mr. J. F. Rogge, Senior Resident Inspector, Vogtle s