MONTHYEARCP-202300391, (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2023-08-24024 August 2023 (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule ML21119A3492021-05-17017 May 2021 Temporary Exemption from Requirements of 10 CFR Part 50, Appendix E, Sections IV.F.2.B and IV.F.2.C (EPID L-2021-LLE-0028 (COVID-19)) CP-202100241, (CPNPP) - Supplemental Information Regarding Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section VI, Subsection A.7 Regarding Annual Force-on-Force (FOF) Exercises (COVID-19) - Cover Letter2021-05-12012 May 2021 (CPNPP) - Supplemental Information Regarding Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section VI, Subsection A.7 Regarding Annual Force-on-Force (FOF) Exercises (COVID-19) - Cover Letter CP-202100202, One-Time Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, IV.F.2.b and IV.F.2.c2021-04-21021 April 2021 One-Time Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, IV.F.2.b and IV.F.2.c ML21097A0522021-04-0707 April 2021 NRC Talking Points - 4/7/2021 Meeting with Vistra Operations Company LLC Proposed COVID-19 Related Exemption Request to Defer the Annual Force-on-Force Exercise for Comanche Peak ML21040A0012021-02-11011 February 2021 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2021-LLE-0009 (COVID-19)) CP-202100092, (CPNPP) - Second Supplement to Subsequent Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs2021-02-10010 February 2021 (CPNPP) - Second Supplement to Subsequent Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs ML20350B6662020-12-22022 December 2020 Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3(I)(1) (EPID L-2020-LLE-0235 (COVID-19)) ML20349A0382020-12-16016 December 2020 Exemption from Selection from Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0236 (COVID-19)) CP-202000684, (CPNPP) - Supplement to Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs2020-12-15015 December 2020 (CPNPP) - Supplement to Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs CP-202000677, (CPNPP) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(l) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-12-10010 December 2020 (CPNPP) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(l) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic ML20136A1412020-05-29029 May 2020 Exemption Request from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Section VI 2023-08-24
[Table view] Category:Letter type:CP
MONTHYEARCP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 CP-202300442, (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program2023-09-15015 September 2023 (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program CP-202300391, (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2023-08-24024 August 2023 (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202300411, (Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)2023-08-17017 August 2023 (Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20) CP-202300361, (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report2023-08-17017 August 2023 (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 0182023-08-15015 August 2023 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 CP-202300358, (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 1122023-08-0101 August 2023 (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112 CP-202300322, Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 32023-07-27027 July 2023 Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 3 CP-202300348, (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48)2023-07-18018 July 2023 (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48) CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 12023-07-12012 July 2023 Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 CP-202300262, Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 22023-06-20020 June 2023 Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 2 CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-06-15015 June 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300248, Response to Request for Additional Information Regarding License Renewal Application - Set 12023-06-13013 June 2023 Response to Request for Additional Information Regarding License Renewal Application - Set 1 CP-202300209, Response to Request for Additional Information - License Renewal Application Environmental Review2023-06-0606 June 2023 Response to Request for Additional Information - License Renewal Application Environmental Review CP-202300207, Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-052023-05-25025 May 2023 Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-05 CP-202300182, Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application2023-05-0808 May 2023 Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application CP-202300201, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0)2023-05-0404 May 2023 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0) CP-202300160, (Cpnpp), 2022 Annual Radiological Environmental Operating Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Environmental Operating Report CP-202300159, (Cpnpp), 2022 Annual Radiological Effluent Release Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Effluent Release Report CP-202300165, License Renewal Application Revision 0 - Supplement 22023-04-24024 April 2023 License Renewal Application Revision 0 - Supplement 2 CP-202300175, Submittal of 2022 Annual Environmental Operating Report (Non-Radiological)2023-04-20020 April 2023 Submittal of 2022 Annual Environmental Operating Report (Non-Radiological) CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300096, License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements2023-04-20020 April 2023 License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements CP-202300140, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-0012023-04-19019 April 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-001 CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300135, License Renewal Application Revision 0 - Supplement 12023-04-0606 April 2023 License Renewal Application Revision 0 - Supplement 1 CP-202300144, (CPNPP) - Decommissioning Report2023-03-30030 March 2023 (CPNPP) - Decommissioning Report CP-202300139, (CPNPP) - Property Damage Insurance2023-03-30030 March 2023 (CPNPP) - Property Damage Insurance CP-202300098, (Cpnpp), Annual Report of Changes in Peak Cladding Temperature2023-03-16016 March 2023 (Cpnpp), Annual Report of Changes in Peak Cladding Temperature CP-202200481, Response to Request for Additional Information - Relief Request Application P-1, Inservice Testing (IST)2022-12-0707 December 2022 Response to Request for Additional Information - Relief Request Application P-1, Inservice Testing (IST) CP-202200454, (Cpnpp), Reply to a Notice of Violation Transmitted Via NRC Letter from Gregory Werner to Ken Peters Dated 11/01/2022, Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Inspection Report 05000445/2022003 .2022-12-0101 December 2022 (Cpnpp), Reply to a Notice of Violation Transmitted Via NRC Letter from Gregory Werner to Ken Peters Dated 11/01/2022, Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Inspection Report 05000445/2022003 . CP-202200355, Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-0022022-11-21021 November 2022 Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002 CP-202200380, (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications2022-11-21021 November 2022 (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications CP-202200450, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters2022-11-16016 November 2022 (CPNPP) - Registration of Dry Spent Fuel Storage Canisters CP-202200435, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2022-11-0808 November 2022 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters CP-202200419, (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report2022-11-0303 November 2022 (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report CP-202200357, (CPNPP) Unit 2 - Response to Request for Additional Information, Fall 2021 (2RF19) Steam Generator Tube Inspection Report2022-09-14014 September 2022 (CPNPP) Unit 2 - Response to Request for Additional Information, Fall 2021 (2RF19) Steam Generator Tube Inspection Report CP-202200358, (CPNPP) - Transmittal of Revised Emergency Plan (Revision 46)2022-09-14014 September 2022 (CPNPP) - Transmittal of Revised Emergency Plan (Revision 46) CP-202200246, Evacuation Time Estimate Analysis2022-08-25025 August 2022 Evacuation Time Estimate Analysis CP-202200306, (CPNPP) - Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 22 (1RF22)2022-08-11011 August 2022 (CPNPP) - Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 22 (1RF22) CP-202200273, Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative2022-07-20020 July 2022 Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative CP-202200276, (CPNPP) - Relief Request Application P-1, Inservice Testing (IST)2022-07-20020 July 2022 (CPNPP) - Relief Request Application P-1, Inservice Testing (IST) CP-202200247, (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 0172022-06-30030 June 2022 (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 017 2024-01-31
[Table view] |
Text
m Luminant Jack c. Hicks Manager, Regulatory Affairs Comanche Peak Nuclear Power Plant (Vistra Operations Company LLC)
P.O. Box 1002 6322 North FM 56 Glen Rose, TX 76043 T 254.897.6725 CP-202300391 TXX-23061 August 24, 2023 ATTN: Document Control Desk Ref 10 CFR 50.12(a)
U. S. Nuclear Regulatory Commission 10 CFR 50.71(e)
Washington, DC 20555-0001
Subject:
Comanche Peak Nuclear Power Plant (CPNPP)
Docket Nos. 50-445 and 50-446 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule
Dear Sir or Madam:
In accordance with the requirements of 10 CFR 50.12(a), Vistra Operations Company, LLC. (Vistra OpCo) hereby requests an exemption from the requirements of 10 CFR 50.71(e)(4) regarding submission of revisions to the Updated Final Safety Analysis Report (UFSAR) for Comanche Peak Nuclear Plant (CPNPP), Units 1 and 2.
CPNPP Units 1 and 2 share a common UFSAR and currently submit periodic updates to the UFSAR once per fuel cycle (based on the unit with the shortest interval between scheduled refueling outages).
With the current fuel cycles, FSAR updates are submitted every 18 months. The requested exemption provided in the enclosure to this letter would allow periodic updates of the CPNPP UFSAR on a specified schedule that does not exceed 24 months between successive updates. Details supporting the 10 CFR 50.12(a) exemption request are provided in the enclosure to this letter.
Vistra OpCo requests approval of this exemption by September 30, 2024.
This communication contains no new commitments regarding CPNPP Units 1 and 2.
Should you have any questions, please contact Nie Boehmisch at (254) 897-5064 or nic.boehmisch@luminant.com.
Sincerely, Jack C. Hicks
Enclosure:
Exemption Request c (email) - John Monninger, Region IV [John.Monninger@nrc.gov]
Dennis Galvin, NRR [Dennis.Galvin@nrc.gov]
John Ellegood, Senior Resident Inspector, CPNPP [John.Ellegood@nrc.gov]
Dominic Antonangeli, Resident Inspector, CPNPP [ dominic.antonangeli@nrc.gov]
TXX-23061 Enclosure Page 1 of 3 1.0 SPECIFIC EXEMPTION REQUEST In accordance with 10 CFR 50.12(a)(1), Vistra Operations Company LLC, (Vistra OpCo) is requesting approval of a permanent exemption from the requirements of 10 CFR 50.71(e)(4) for submission of revisions to the Updated Final Safety Analysis Report (UFSAR) for Comanche Peak Nuclear Power Plant (CPNPP), Units 1 and 2.
Vistra OpCo requests that the submittal of CPNPP Unit 1 and Unit 2 combined UFSAR be due by July 31 of every odd-numbered year. This change will result in a submittal that does not exceed 24 months between successive updates, as required by 10 CFR 50.71(e)(4). For practical or business reasons, the submittal would occur any time in the month of July on an odd-numbered year.
Vistra OpCo is requesting this exemption be approved by September 30, 2024.
2.0 BASIS FOR EXEMPTION REQUEST CPNPP is a two-unit site with staggered 18 month refueling cycles. The units share a combined UFSAR. On September 25, 1995, CPNPP was granted an exemption to submit periodic updates to the UFSAR once per fuel cycle (based on the unit with the shortest interval between scheduled refueling outages), (Reference 1). The exemption reduced the original reporting requirement that often resulted in updating the UFSAR more frequently than every 12 months. The proposed schedule change in this exemption request, to submit the updated UFSAR by July 31 of every odd-numbered year, would allow more efficient scheduling and allocation of resources to prepare and submit UFSAR updates while remaining within the maximum allowed 24 months between successive updates. The most recent UFSAR submittal was made on August 1, 2023 (Reference 2), and the next submittal is planned to occur in July 2025.
10 CFR 50.12 Specific exemptions states, in part:
(a) The Commission may, upon application by any interested person or upon its own initiative, grant exemptions from the requirements of the regulations of this part, which are --
(1) Authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security.
(2) The Commission will not consider granting an exemption unless special circumstances are present. Special circumstances are present whenever --
(ii) Application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule.
The proposed exemption can be authorized by law as no other prohibition of law exists that would preclude the activities which would be authorized by the exemption. The CPNPP UFSAR updates will continue to reflect changes to the UFSAR up to a maximum of six months prior to the date of filing, as required by 10 CFR 50.71(e)(4). The schedules proposed will remain within the maximum 24 months between successive updates as required by 10 CFR 50.71(e)(4). Therefore, this exemption can be authorized by law.
The UFSAR submittal may be reviewed by the NRC staff but is not formally approved. The material may be used in subsequent reviews of NRC staff activities concerning that facility. Licensees use the UFSAR when evaluating changes to the facility and procedures under 10 CFR 50.59, Changes, tests and experiments. The proposed exemption will not alter the manner in which changes to the UFSAR are evaluated in that changes to the UFSAR will continue to be reviewed through the existing applicable administrative and programmatic control processes to ensure that UFSAR changes are properly evaluated and implemented. 10 CFR 50.71(e)(4) requires licensees to periodically submit their UFSAR
TXX-23061 Enclosure Page 2 of 3 to assure that the NRC has the latest material developed. In that regulation, the NRC has determined that an update frequency not exceeding 24 months between successive revisions is acceptable for periodic submissions of the UFSAR. The proposed exemption will provide an equivalent level of protection to the existing requirements. Therefore, this exemption request will not present an undue risk to the public health and safety.
The proposed exemption has no impact on the CPNPP physical security plan or the ability to protect special nuclear material at CPNPP. Therefore, the exemption is consistent with the common defense and security.
The underlying purpose of 10 CFR 50.71(e)(4) is to ensure that the licensee periodically updates their UFSAR to assure that the UFSAR remains up-to-date and accurately reflects the plant design and operation. 10 CFR 50.71(e)(4) currently specifies a maximum time of 24 months between successive updates and the requirement to reflect changes to the UFSAR up to a maximum of six months prior to the date of filing. The processing and submittal of more frequent revisions to the UFSAR, including all documents incorporated by reference, is not necessary to achieve the underlying purpose of the rule.
The routine UFSAR submittals will not exceed the maximum 24 months between submission and the submittals will continue to contain timely updates as required by 10 CFR 50.71(e)(4). Therefore, special circumstances exist as application of the regulation in this circumstance is not necessary to achieve the underlying purpose of the rule.
3.0 ENVIRONMENTAL ASSESSMENT Vistra OpCo has determined that the requested exemption meets the categorical exclusion provision in 10 CFR 51.22(c)(25), which allows the exemption to be granted provided that the requirements of 10 CFR 51.22(c)(25)(i) through (vi) are met. Vistra OpCo has determined that all the criteria for this categorical exclusion are met. Therefore, in accordance with 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with this exemption request.
4.0 PRECEDENT The NRC has previously granted similar exemptions. By letter dated August 4, 2021 (Reference 3), the NRC approved an exemption from specific requirements of 10 CFR 50.71(e)(4) for the Joseph M.
Farley Nuclear Plant (Farley), Units 1 and 2; and Vogtle Electric Generating Plant (Vogtle), Units 1 and 2. The exemption allowed periodic updates of the Updated Final Safety Analysis Report (UFSAR) by October 31 of every odd-numbered and even-numbered year respectively, and not to exceed 24-months between successive updates.
5.0 CONCLUSION
Vistra OpCo considers the requested schedule changes for routine submittals of the CPNPP UFSAR an acceptable alternative for meeting the intent of 10 CFR 50.71(e)(4). As demonstrated in this submittal, the requested exemption complies with the criteria in 10 CFR 50.12. Specifically, the requested exemption is allowed by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security. Special circumstances exist in that the application of the requirements is not necessary to achieve the underlying purpose of the rule. The proposed exemption meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(25),
therefore, no environmental impact statement or environmental assessment was prepared in connection with this exemption request.
TXX-23061 Enclosure Page 3 of 3
6.0 REFERENCES
- 1. Letter from U.S. Nuclear Regulatory Commission to C.L. Terry, TU Electric, Exemption to 10 CFR 50.71(E)(4), Comanche Peak Steam Electric Station Units 1 and 2 (TAC NOS. M91140 AND M91141)), dated September 25, 1995 (ADAMS Accession No. ML021790732)
- 2. Letter from Jay Lloyd, Vistra Operations Company LLC, to U.S. Nuclear Regulatory Commission, Comanche Peak Nuclear Power Plant Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112, dated August 1, 2023
- 3. Letter from U.S. Nuclear Regulatory Commission to C.A. Gayheart, Southern Nuclear Operating Company, Joseph M. Farley Nuclear Plant, Units 1 and 2; and Vogtle Electric Generating Plant, Units 1 and 2 - Exemptions from the Requirements of 10 CFR Part 50, Section 50.71(E)(4), Final Safety Analysis Report Update Schedule (EPID L-2021-LLE-0031), dated August 4, 2021 (ADAMS Accession No. ML21179A204)
- 4. Federal Register (45 FR 30615), FSAR Update Rule, Addition of Paragraph (e) to 10 CFR 50.71 (reference pages 45 FR 30614 - 30616), dated May 9, 1980