Decommissioning Report
ML090980302
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/31/2009
From: Flores R, Madden F
Luminant Generation Co, Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-200900473, TXX-09052
Download: ML090980302 (3)


Text

-, S---j 7

Rafael Flores Senior Vice President

&.Chief Nuclear Officer ra fael.flores@ Luminant.com Luminant Power P 0 Box 1002 6322 North FM 56 Glen Rose, TX 76043 T 254 897 5550 C 817 559 0403 F 254 897 6652 CP-200900473 Log # TXX-09052 Ref: # 10CFR50.75(f)

March 31, 2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 DECOMMISSIONING REPORT

Dear Sir or Madam:

Attached is the biennial decommissioning report for Comanche Peak Units 1 and 2, prepared and submitted. pursuant to 10CFR50.75(f). Luminant Generation Company LLC (Luminant Power) is an unregulated utility and therefore does not meet the definition of an electric utility as defined by 10CFR50.2. The recovery of decommissioning funds for the eventual decommissioning of Comanche Peak Units 1 and 2 is assured through the collection of a non-bypassable charge which is subsequently contributed to an external trust.

The amounts to be collected for Comanche Peak decommissioning are based on a site specific decommissioning study that includes contracting vendors for recycling and compacting waste.

Differences between the study as compared to the 10CFR50.75 estimate are that buildings/equipment common to both units (e.g., the fuel building and the auxiliary building) are decommissioned with Unit 2, decreasing the cost of Unit 1 and increasing the cost of Unit 2.

When projected to the license expiration date for each unit using the 2 percent annual real rate of return as allowed per 10CFR50.75(e)(ii), the projected Nuclear Decommissioning Trust balance is greater than the escalated NRC minimum cost of decommissioning for Units I and 2.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway Comanche Peak - Diablo Canyon

  • Palo Verde
  • San Onofre - South Texas Project Wolf Creek 74oJ

U. S. Nuclear Regutatory Commission TXX-09052 Page 2 March 31, 2009 Should you have any questions, please contact Mr. J. D. Seawright at (254) 897-0140.

Sincerely, Luminant Generation Company LLC Rafael Flores By:

Yr:d W. Madden Director, Oversight & Regulatory Affairs Attachment c -

E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak

Attachment to TXX-09052 Luminant Generation Company LLC Comanche Peak Steam Electric Station Information is submitted to provide Financial Assurance

1. The minimum amount of decommissioning funds estimated to be required pursuant to 10 CFR 50.75 (b) and (c)..

Unit # 1 Unit # 2 At December 31, 2008 Using 10 CFR 50.75(c) formulas Site-specific study

$ 412.1million

$ 546.2 million

$ 412.1 million

$ 667.3 million

2. The amount accumulated at the end of the calendar year preceding the date of the report for items included in 10 CFR 50.75 (b) and (c).

Market Value at December 31, 2008

3. A schedule of the annual amounts remaining to be collected for items in 10 CFR 50.75 (b) and (c).

Years 2009 through 2029 (21 years)

Year 2030 Year 2031 Year 2032 Year 2033 Total

4. The assumptions used regarding escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections.

Estimated Escalation rate for decommissioning costs Estimated Earnings rates on decommissioning funds 2009 through 2029 2030 through 2033 Rates of other factors used in funding projections

5. Any power sale contracts upon which licensee is relying to certifying financial assurance.
6. Modifications to licensee's method of providing financial assurance since previous report.
7. Material changes to trust agreement.

$ 179.7 million Unit # 1

$ 7.1 million 1.2 million

$ 149.7 million

$ 205.7 million Unit # 2

$ 8.1 million 8.1 million 8.1 million 8.1 million 1.3 million

$195.6 million 4.02%

6.6%

6.3%

None None None None 4.11%

6.6%

6.3%

None None None None NOTES:

I.

Labor (South), Energy, and Burial inflation factors are based on NUREG 1307, "Report on Waste Burial Charges," Revision 13 (Lx=2.148, E,=2.746, and B,=9.872)

2.

All forecast data are based on the decommissioning cost study filed with the Public Utility Commission on June 17, 2005, and approved by.the Commission's Policy Development Division on July 29, 2005.