CP-200900848, Submittal of Unit 2 Inservice Inspection Plan for Refueling Outage No .11

From kanterella
Jump to navigation Jump to search
Submittal of Unit 2 Inservice Inspection Plan for Refueling Outage No .11
ML092180732
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 07/30/2009
From: Madden F
Luminant Power
To: Andrea Jones
Office of Nuclear Reactor Regulation, State of TX, Dept of Licensing & Regulation
References
CP-200900848, TXX-09083
Download: ML092180732 (27)


Text

Rafael Flores Luminant Power Senior Vice President P 0 Box 1002

& Chief Nuclear Officer 6322 North FM 56 rafael.tfores@Luminant.com Glen Rose, TX 76043 Luminant T 254 897 5550 C 817 559 0403 F 254 897 6652 CP-200900848 Ref. # 10 CFR 50.55a(g)

Log # TXX-09083 July 30, 2009 Mr. Anthony P. Jones Chief Inspector Texas Department of Licensing and Regulation Boiler Division E. 0. Thompson State Office Building P.O. Box 12157, Capitol Station Austin, Texas 78701

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NO. 50-446 SUBMITTAL OF UNIT 2 INSERVICE INSPECTION PLAN FOR REFUELING OUTAGE NO.11 (1998 EDITION OF ASME CODE, SECTION XI, 2000 ADDENDA UNIT 2 INTERVAL DATES: AUGUST 3,2004 - AUGUST 2,2014)

Dear Sir:

Enclosed is a copy of the Luminant Power Comanche Peak Unit 2 Inservice Inspection (ISI) Plan for the eleventh refueling outage (2RF11), which is scheduled to start in October of 2009. This plan contains the scheduled examinations to be conducted in support of the ISI requirements of the ASME Boiler and Pressure Vessel Code,Section XI. Notice that those examination areas within the Texas Department of Licensing and Regulation verification boundary, as defined in Texas Boiler Law, are annotated.

This communication contains no new licensing basis commitments regarding Comanche Peak Unit 2.

Should you have any questions, please contact Mr. Paul Passalugo at (254) 897-6250.

Sincerely, Luminant Generation Company LLC Rafael Flores By: , i Fred W. Madden Director, Oversight & Regulatory Affairs A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway Comanche Peak Diablo Canyon. Palo Verde. San Onofre South Texas Project. Wolf Creek

TXX-09083 Page 2 07/30/2009 Enclosure - Inservice Inspection Schedule for Unit 2 Eleventh Refueling Outage c- E. E. Collins, NRC Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak Brian Welch ANIL, Comanche Peak

ENCLOSURE TO TXX-09083 INSERVICE INSPECTION SCHEDULE FOR UNIT 2 ELEVENTH REFUELING OUTAGE

TU ELECTRIC COMANCHE PEAK UNIT 2 INSERVICE INSPECTION SCHEDULE SCHEDULED COMPONENTS SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

July 22, 2009 REVISION 0

DATE: 07/22/09 COMANCHE PEAK UNIT 2 PAGE: 23 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL. SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS I SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS REACTOR COOLANT TCX-RCPCRV-01 001850 TCX-3-1100-LUGS B-N-2 VT-3 TX-ISI-88 TOLR VERIFICATION BOUNDARY.

CORE SUPPORT LUGS (6) B13.60 002800 TCX-1-1200-INT B-N-I VT-3 TX-ISI-88 TDLR VERIFICATION BOUNDARY.

RV INTERNALS (ACCESS DURING B13 . 10 -033 REFUELING) R157 832RB 002805 TCX-1-I200--CSS B-N-3 VT-3 TX-ISI-88 TDLR VERIFICATION BOUNDARY.

RV CORE SUPPORT STUCT-NO BI3 . 70 ACCESS @ REFUEL 005620 TCX-1-1400-12 B-G-1 UT TX-ISI-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 -033 RI60 905RB 005680 TCX-1-1400-15 B-G-1 UT TX-ISI-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD B6 .30 .033 R160 905RB 005700 TCX-1-1400-16 B-G-1 UT TX-ISI-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD B6 .30 -033 RI60 905RB 005720 TCX-1-1400-17 8-G-1 UT TX-ISI-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD B6 . 30 -033 RI60 905RB 005740 TCX-I-1400-18 B-G-i UT TX-ISI-305 TBX -52 TDLR VERIFICATION BOUNDARY.

RV STUD 86.30 -033 RI60 905PB

DATE: 07/22/09 COMANCHE PEAK UNIT 2 PAGE: 24 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS 1 SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS REACTOR COOIANT TCX-RCPCRV-01 005760 TCX-1-1400-19 B-G-] UT TX-IST-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 -033 Ri10 9058.B 005780 TCX-I-1400-20 B-G-1 UT TX-ISI-305 TBX-52 TDLR VERIFICATION BOUNDARY RV STUD B6.30 -033 R160 905R8B 005800 TCX-1-1400-21 B-G-1 UT TX-ISI-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 -033 RI60 905RB 005820 TCX-1-1400-22 B-G-I UT TX-ISI-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD S6 30 033 R160 905RB 005840 TCX-i-1400-23 8-G-1 UT TX-ISI-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD B6 .30 -033 R160 9058.8 005860 TCX-1-1400-24 B-G-1 UT TX-ISI-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD 86.30 -033 R160 905RB 005880 TCX-1-1400-25 B-G-1 UT TX-ISI-305 TBX- 52 TDLR VERIFICATION BOUNDARY.

RV STUD 86. 30 -033 R160 9058B 005900 TCX-1-1400-26 B.G-1 UT TX-ISI-305 TBX -52 TDLR VERIFICATION BOU[NDARY RV STID B6. 30 -033 R160 905RB

DATE: 0"7/22/09 COMANCHE PEAK-UNIT 2 PAGE; 25 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS I SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NU*MER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS REACTOR -- -X-RP-V--

005920 TCX-1-1400-27 B-G-1 UT TX-ISI-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD B6 .30 -033 R160 905RB 005940 TCX-1-1400-28 UT TX-ISI-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD -033 R160 905RB 005960 TCX-1-1400-29 B-G-1 UT TX-ISI-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD N6.30 -033 R160 905RB 009980 TCX-i-1400-30 B-G-1 UT TX-IST-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD BE.30 -033 R160 905RB 006000 TCX-1-1400-31 B-G-1 UT TX-ISI-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 -033 R160 905RB 006020 TCX-1-1400 32 B-G-1 UT TX-ISI-305 TBX- 52 TDLR VERIFICATION BOUNDARY.

RV STUD B6 .30 -033 R160 905RB 006040 TCX-1-1400-33 B-G-I UT TX-ISI-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD B6 .30 -033 R160 905RE 006060 TCX-1-1400-34 B-G-1 UT TX-ISI-305 TBX- 52 TDLR VERIFICATION BOUNDARY.

RV STUD BE. 0

-033 R160 905RB

DATE: 07/22/09 COMANCHE PEAK UNIT 2 PAGE: 26 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS I SCHEDULED COMPONENTS ASME SEC. XI CAIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE -ACCESS/

NUMBER IDENTIFICATION ETEM NO METH PROCEDURE LOCATION INSTRUCTIONS REACTOR COOLANT TCX-RCPCRV-01 006080 TCX-1-1400-35 B-G-1 UT TX-ISI-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD 86.30 -033 R160 905RB 006100 TCX-]-1400-36 B-G- 1 UT TX-ISI-305 TBX-52 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 -033 RI60 905R8 006120 TCX-1-1400.-37 B-G-1 UT TX-ISI-305 SAP 102924 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 006140 TCX-1-1400-38 B-G-1 UT TX-ISI-305 SAP 102924 TDLR VERIFICATION BOUNDARY RV STUD 86.30 006160 TCX-I-1400-39 B-G-] UT TX-ISI-305 SAP 102924 TDLR VERIFICATION BOUNDARY.

RV STUD 86.30 006180 TCX-1-1400-40 B-G-1 UT TX-ISI-305 SAP 102924 TDLR VERIFICATION BOUNDARY.

RV STUD R6.30 006200 TCX-1-1400-41 B-G-1 UT TX-ISI-305 SAP 102924 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 006260 TCX-1-1400...44 8-G-1 UT1 TX-ISI-305 SAP 102924 TDLR VERIFICATION BOUNDARY.

RV STUD B6. 30

DATE: 07/22/09 COMANCHE PEAK UNIT 2 PAGE: 27 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS 1 SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NITUBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS REACTOR COOLANT TCX-RCPCPR-01 009000 TCX-1-2100-1 B-B UT TX-ISI-210 TBX-I TDLR VERIFICATION BOUNDARY.

PRESSURIZER LOWER HEAD TO 82.11 -2.75 IN-123 SHELL WELD R161A832RB 009200 TCX-1-2100-6 B-8 UT TX-.SI-210 TBX-I TDLR VERIFICATION BOUNDARY.

PRESSURIZER LONG. WELD (IFT 82.12 -4,0 IN -123 ADJ. WELD 1) R161A832RB 009400 TCX-1-2100-10 B-K MT TX-ISI-70 TDLR VERIFICATION BOUNDARY.

PRESSURIZER SUPPORT SKIRT WELD 810.10 -1.5 IN -123 RI6LA832RB REACTOR COOLANT 29-RC-2-001-WEST-1 012200 TCX-1-4100-1 R-A UT TX-ISI-254 TBX-57,RV-6 TDLR VERIFICATION BOUNDARY RPV NOZZLE TO SAFE END RI . 15 29 -2.33 IN-133 B-F WELD.

R157 827Rfl 012300 TCX-1-4100-2 R-A UT TX-ISI-254 TBX-57,RV-6 TDLR VERIFICATION BOUNDARY SAFE END TO PIPE RI. 20 29 -2.33 IN-133 B-J WELD.

R157 827RPB REACTOR COOLANT 27.5-RC-2-003-WEST-1 013400 TCX-1-4100-13 R-A UT TX- ISI-254 TBX-57,RV-6 TDLR VERIFICATION BOUNDARY.

ELBOW TO SAFE END RI.20 27.5 -2.21 IN- B-J WELD.

R157 827RB 013500 TCX-.-4100-14 R-A UT TX-ISI-254 TBX-57,RV-6 TD1R VERIFICATlON BOUNDARY.

SAFE END TO RV NOZZLE RI. 15 27.5 -2.21 IN- B-F WELD.

R1541B27RB

DATE: 07/22/09 COMANCHE PEAK UNIT 2 PAGE: 28 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS I SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK!

SUMMARY

EXAMINATION AREA CATGY NDO SIZE-.SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS REACTOR COOLANT 29-RC-2-023-WEST-1 027600 TCX-1-4200-1 R-A UT TX-ISI-254 TBX-57,RV-6 TDLR VERIFICATION BOUNDARY.

RPV NOZZLE TO SAFE END R1. 15 29 -2.33MW -133 B-F WELD.

R157 827PB 027700 TCX-1-4200-2 R-A UT TX-ISI-254 TBX-57.RV-6 TDLR VERIFICATION BOUNDARY.

SAFE END TO PIPE R1. 20 29 -2.33MW -133 8-J WELD.

R157 827RB REACTOR COOLANT 27.5-RC-2-025--WEST--

028800 TCX-1-4200-13 R-A UT TX-ISI-254 TBX-57,RV-6 TDLR VERIFICATION BOUNDARY, ELBOW TO SAFE END RI .20 27.5 -2.21MW - RB-J WELD.

R157 827RB 028900 TCX-1-4200-14 R-A UT TX-ISI-254 TBX-57,RV-6 TDLR VERIFICATION BOUNDARY.

SAFE END TO RV NOZZLE Ri.15 27.5 -2.21MW - B-F WELD.

R154J827RB REACTOR COOLANT 29-RC-2-040-WEST-1 040900 TCX-1-4300-1 R-A UT TX-ISI-254 TBX-57,RV-6 TDLR VERIFICATION BOUNDARY.

RPV NOZZLE TO SAFE END RI. 15 29 -2.33MW -133 B-F WELD.

R157 827RB 041000 TCX-1-4300-2 R-A UT TX-ISI-254 TBX-57,RV-6 TDLR VERIFICATION BOUNDARY.

SAFE END TO PIPE RI. 20 29 -2.33MW -133 B-J WELD-R157 827RB REACTOR COOLANT 31-RC-2-041-WEST-I 041600 TCX-1-4300-8 R-A UT TX-ISI-214 TDLR VERIFICATION. BOUNDARY TBX-57 ELBOW TO PIPE Rl .20 31 -2.48MW - 1-J WELD.

R154K817RB

DATE; 07/22/09 COMANCHE PEAK UNIT 2 PAGE: 29 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS 1 SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS REACTOR COOLANT 27.5-RC-2-.042-WEST-1 041900 TCX-1-4300-11 R-A UT TX-ISI-214 TBX- 57 TDLR VERTFICATION BOUNDARY.

RC PUMP DISCHARGE NOZZLE TO RI.20 27.5 -2.21MW - B-J WELD PIPE R154K827RB REACTOR COOLANT 2.75-RC-2-042-WEST-1 012100 TCX-1-4300-13 R-A UT TX-ISI-254 TBX-57,RV-6 TDLR VERIFICATION BOUNDARY.

ELBOW TO SAFE END RI.20 27.5 -2.21MW B-J WELD.

R157 827RB 042200 TCX-I-4300-14 R-A UT TX-ISI-254 TBX-57,RV-6 TDLR VERIFICATION BOUNDARY.

SAFE END TO RV NOZZLE RI.15 27.5 -2.21MW - B-F WELD.

R157 827RB SAFETY INJECTION 10-SI-2-181-2501R-1 043600 TCX-1-4301-9 R-A UT TX-ISI-302 TBX-9 , B-J WELD.

PIPE TO ELBOW Rl . 16 10 -140 R154K832RB 043700 TCX-1-4301-10 R-A UT TX-ISI-302 TBX-9 , B-J WELD.

ELBOW TO PIPE R1.16 10 --140 R154KB31PB REACTOR COOLANT 6-RC-2-046-2501R-i 047600 TCX-1-4303-11 R-A UT TX-ISI-302 TBX- 5 B-J WELD.

PIPE TO ELBOW RI. 20 6 -160 RI54K831RB CHEMICAL AND VOLUME CONTROL 3-RC-2-052-2501R-,

050800 TCX---4304-24 R-A UT. TX-ISI-302 B-J WELD.

PIPE TO VALVE R2:11 3 -160.

RE54K826RB

DATE: 07/22/09 COMANCHE PEAK UNIT 2 PAGE: 30 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS I SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS REACTOR COOLANT 29-RC-2-058-WEST- 1 059200 TCX-1-44C0-1 R-A UT TX-ISI-254 TBX-57,RV-6 TDLR VERIFICATION BOUNDARY.

RPV NOZZLE TO SAFE END RI.15 29 -2.33MW -133 B-F WELD.

R157 827RB 059300 TCX-1-4400-2 R-A UT TX-ISI-254 TBX-57,RV-6 TDLR VERIFICATION BOUNDARY.

SAFE END TO PIPE R1. 20 29 -2.33MW -133 B-J WELD R157 827RB REACTOR COOLANT 27.5-RC-2-060-WEST-1 060400 TCX-1-4400-13 R-A UT TX-ISI-254 TBX-57,RV-6 TDLR VERIFICATION BOUNDARY.

ELBOW TO SAFE END RI.20 27.5 -2.21MW - B-J WELD.

8157 827RB 060500 TCX-1-4400-14 R-A UT TX-ISI-254 TBX-57,RV-6 TDLR VERIFICATION BOUNDARY.

SAFE END TO RPV NOZZLE RI. 15 27.5 -2.21MW - B-F WELD.

R157 827RB RESIDUAL HEAT REMOVAL 12-RH-2-001-2501R-1 094261 TCX-1-4101-8701A-INT B-M-2 VT-3 TX-ISI-8 DWG. 8372D46. EXAM TO BE VALVE INTERNAL SURFACES B12.50 12 - -105 CONDUCTED WHEN VALVE-IS RI54AS17PS. DISASSEMBLED.

SAFETY INJECTION 10-SI-2-182-2501R-1 094279 TCX-1-4402-8956D-INT B-M-2 VT-3 TX-ISI-B DWG. 8372DI4 VALVE INTERNAL SURFACES B12.50 10

DATE: 07/22/09 COMANCHE PEAK UNIT 2 PACE: 31 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS 2 SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS CONTAINMENT SPRAY CP2-CTAHCS-01 097410 TCX-2-1180-1-1 C-A UT TBX-31 CT HXI HEAD TO SHELL WELD C1.20 097420 TCX-2-1180-1-2 C-A UT TBX-31 CT HXI SHELL TO FLANGE WELD Cl. 10 097430 TCX-2-1180-1-3 C-B UT TBX-15,SSCB-1 CT HXI INLET NOZZLE TO SHELL C2.21 PT WELD 097444 TCX-2-1180-1-4 C-B UT TBX-15,SSCB-I CT HXI OUTLET NOZZLE TO SHELL C2.21 PT WELD CONTAINMENT SPRAY TCX-CTAACS-01 097450 TCX-2-1180.1.1WS C-C PT CT HRX WELD SUPPORT C3 . 10 097460 TCX-2-1180-1-2WS C-C PT CT HX1 WELDED SUPPORT C3 . 10 FEEDWATER 6-FW-2-096-1303-2 124200 TCX-2-2204-24 R-A UT TX-ISI-301 TBX-35, PDI-02 C-F-2 WELD.

PIPE TO ELBOW R1 .20 6 -80 RI00D864SB

DATE: 07/22/09 COMANCHE PEAK UNIT 2 PAGE: t32 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD. SECOND OUTAGE (09RF)

CLASS 2 SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS FEEDWATER 6-FW-2-096-1303-2 124300 TCX-2-2204-25 R-A UT TX-ISI-301 TBX-35, PDI-02 C-F-2 WELD.

ELBOW TO PIPE RI . 20 6 -80 RI00D864SB 124400 TCX-2-2204-26 R-A UT TX-ISI-301 TBX-35, PDI-02 C-F-2 WELD, PIPE TO PIPE R- .20 6 -80 RI0OD864SB FEEDWATER 6- FW-2-097-1303-2 141000 TCX-2-2303-25 R-A UT TX-ISI-301 TBX-35, PDI-02 TDLR VERIFICATION BOUNDARY.

PIPE TO EBLOW RI.20 TX-ISI-70 6 -80 -220 C-F-2 WELD.

R100C864SB 141100 TCX-2-2303-26 R-A UT TX-ISI-301 TBX-35, PDI-02 C-F-2 WELD.

ELBOW TO PIPE RI.20 6 -80 RI00C864SB 141200 TCX-2-2303-27 R-A UT TX-ISI-301 TBX-35, PDI-02 C-F-2 WELD.

PIPE TO PIPE RI.20 6 -80 R100C864SB RESIDUAL HEAT REMOVAL 10-RH-2-025-601R-2 1870.00 TCX-2-2532-5 R-A UT TX-ISI-302 C- F- I WELD.

ELBOW TO PIPE Ri .20 10 -40S R62F 789SB SAFETY INJECTION 10-SI-2-078-601R-2 188300 TCX-2-2532-18 R-A UT TX.-ISI-302 TBX- 10 C- F-I1 WELD.

PIPE TO ELBOW RI.20 30. -40S R77B 820SB

DATE: 07/22/09 COMANCHE PEAK UNIT 2 PAGE: 33 INSERVICE INSPECTTON SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF),

CLASS 2 SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS SAFETY INJECTION 10-SI-2-078-601R-2 188400 TCX-2-2532-19 R-A UT TX-ISI-302 TBX-10 C-F-I WELD.

ELBOW TO PIPE RI. 20 10 -40S R77B 820SS RESIDUAL HEAT REMOVAL B-RH-2-027-601R-2 190100 TCX-2-2532-36 R-A UT TX-ISI-302 C-F-i WELD.

PIPE TO ELBOW RI. 20 8 -4US R62F 797SB 190200 TCX-2-2532-37 R-A UT TX-ISI 302 C-F-] WELD.

ELBOW TO PIPE R . 20 8 -40S R62F 797SB 190300 TCX-2-2532-38 R-A UT TX-ISI-302 C-F-i WELD.

PIPE TO ELBOW R1. 20 8 -40S R62F 797SB MAIN STEAM 8-MS-2-223-1303-2 501200 TCX-2-2300-MS099 C-G MT TDLR VERIFICATION BOUNDARY VALVE BODY WELD 2MS-0098 C6 .20 .8 DWG. 75730-1. REFER TO R.G.1.147 (N-617)

DATE: 0"7/22/09 COMANCHE PFAK UNIT 2 PAGE: 34 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS I SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS REACTOR COOLANT 6-RC-2-147-250IR-1 615000 TCX-1-4506-H2 F-A VT-3 TX-ISI-8 SPRING RC- 2-147-406--C81S F1.10 6 - -124 R161A913PS 615050 TCX-1-4506-H2 B-K PT TX-ISI-11 WELDED ATTACHMENT RC-2-147-406-C81S B10.20 6 - -124 RI61A913RB REACTOR COOLANT 4-RC-2-164-2501R-1 616200 TCX-1-4505-H28 F-A VT-3 TX-ISI-8 STRUT RC-2-164-402-CSIR FI.10 4 -

R160B908 RB REACTOR COOLANT 4-RC-2-162-2501R-1 616300 TCX-1-4505-H27 F-A VT-3 TX-ISI-8 STRUT RC-2-164-403-C81R Fl . 10 4 -

-R16OB908RB 1, RESIDUAL HEAT REMOVAL 12-RH-2-002-2501R-1 619400 TCX-1--4401-H9 F-A VT-3 TX-ISI-8 STRUT RH-2-002-401-C41R Fl. 10 12 817RB 620000 TCX-1-4401-H4 F-A VT-3 TX-ISI 8 STRUT REl-2-002-408-C41R FI. 10 817RB SAFETY INJECTION 8-SI-2-091-2D01R.-1 621200 TCX-1-4302-H3 F-A VT- 3 STRUT SI-2-091-401-C41R F1 . 10 816RB

DATE: 07I/22/09 COMANCHIE PEAK UNIT 2 PAGE: 35 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS I SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCFDURE LOCATION INSTRUCTIONS SAFETY INJECTION 6-SI-2-102-2501R-1 622400 TCX-I-4303-HI F-A VT-3 SPRING SI-2-102-403-C41S F1. 10 6 828R.B 622450 TCX-I-4303-HI B-K PT WELDED ATTACHMENT SI-2-102-403-C41S BI0.20 6 828R.13 SAFETY INJECTION 2-SI-2-067-2501R-1 627800 TCX-1-4302-Hl F-A VT-3 SNUBBER SI-2-RB-01OA-705-1 F1.10 2 815RRB

DATE: 07/22/09 COMANCHE PEAK UNIT 2 PAGE: 36 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS 2 SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS FEEDWATER 6-FW-2-097-1303-2 676600 TCX-2-2303-H9 F-A VT-3 TX-ISI-8 STRUT. TDLR VERIFICATION FW-2-097-401-S62R F1.20 6 BOUNDARY 863SB 67G900 TCX-2-2302-H4 F-A VT-3 STRUT. TDLR VERIFICATION FW-2-097-405-C62R F1,20 BOUNDARY ,

867RB 677000 TCX-2-2302-H6 F-A %r- 3 STRUT. TDLR VERIFICATION FW-2-097-408-C62R Fl . 20 BOUNDARY 677050 TCX-2-2302-H7 F-A VT-3 STRUT. TDLR VERIFICATION FW-2-097-412-C62R Fl . 20 6 - BOUNDARY 677100 TCX-2-2302-HB F1.A VT-3 STRUT. TDLR VERIFICATION FW-2-097-413-C62R Fl. 20 6 BOUNDARY 877PB3 677200 TCX-2-2302-H9 F-A VT-3 STRUT. TDLR VERIFICATION FW-2-097-416-C62R F1.20 6 BOUNDARY 88ORB 677300 TCX-2-2302-H10 F-A VT- 3 STRUT. TDLR VERIFICATION FW-2-097-417-C62R Fl. 20 6 BOUNDARY 8 8 ORB 677400 TCX-2-2302-H12 F-A VT-3 STRUT TDLR VERIFICATION FW-2-097-424-C62R F1.20 6 BOUNDARY 880ORB

DATE: 0"7/22/09 COMANCHE PEAK UNIT .2 PAGE: 37 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RP)

CLASS 2 SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS PEEDWATER 6-FW-2-097-1303-2 677500 TCX-2-2302-H13 F-A VT- 3 STRUT. TDLR VERIFICATION FW-2-097-425-C62R Fl .20 6 BOUNDARY 880RN 677600 TCX-2-2302-Hl6 F-A VT-3 STRUT. TDUR VERIFICATION FW-2-097-428-C62R F1.20 BOUNDARY 876RB 677700 TCX-2-2302-H19 F-A VT- 3 STRUT. TDlR VERIFICATION FW-2-097-430-C62R F1. 20 BOUNDARY 868RB 677800 TCX-2-2302-H18 F-A VT- 3 STRUT. TDLR VERIFICATION FW-2-097-431-C62R F1.20 BOUNDARY 868RB 677900 TCX-2-2302-H20 F-A VT- 3 STRUT. TDLR VERIFICATION FW-2-097-433-C62R Fl. 20 BOUNDARY 868RB i

678000 TCX-2-2302-HI5 F-A VT-3 STRUT. TDLR VERIFICATION FW-2-097-434-C62R Fl. 20 BOUNDARY 868RB 678100 TCX-2-2302-H21 F-A VT- 3 SPRING. TDLR VERIFICATION FW-2-097-435-C62S Fl. 20 BOUNDARY 868RB 678500 TCX-2-2303-1113 F-A VT-3 SNUBBER. TDLR VERIFICATION PM-2-097-448-C62K F1,20 BOUNDARY 865RB

DATE: 07/22/09 COMANCHE PEAK UNIT 2 PAGE: 38 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS 2 SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS FEEDWATER 6-FW-2-097-1303-2 678600 TCX-2-2303-H14 F-A VI'- 3 STRUT. TDLR VERIFICATION FW-2-097-449-C62R F1.20 6 - BOUN'DARY 865RB 678700 TCX-2-2302-H5 F- A VT- 3 STRUT. TDLR VERIFICATION FW-2-097-702-C62R Fl. 20 BOUNDARY 866RB 678800 TCX-2-2302-lil F-A VT- 3 STRUT. TDLR VERIFICATION FW-2-097-703-C62R FI.20 BOUNDARY 866 RB 678840 TCX-2-2302-H2 C-C MT BOX. TDLR VERIFICATION FW-2-097-418-C62R C3 .20 BOUNDARY 880RB 678845 TCX-2-2302-H2 F-A VT- 3 WELDED ATTACHMENT. TDLR FW-2-097-418-C62R Fl. 20 VERIFICATION BOUNDARY.

88OR-9 678850 TCX-2-2302-Hl C-C MT WELDED ATTACHMENT. TDLR FW-2-097-703-C62R C3.20 6 - VERIFICATION BOUNDARY.

866RB 678900 TCX-2-2302-H3 F-A VT-3 STRUT. TDLR VERIFICATION FW-2-097.-704-C62R F1.20 BOUNDARY 866RB 679000 TCX-2-2302-HI7 F-A VT- 3 STRUT. TDLR VERIFICATION FW-2-097-706-C62R BOUNDARY Fl . 20 868RB

DATE: 07/22/09 COMANCHE PEAK UNIT 2 PAGE: 39 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS 2 SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS FEEDWATER 6-FW-2-l01-1303-2 682100 TCX-2-2303-H6 F-A VT-3 STRUT. TDLR VERIFICATION FW-2-101-401-C62R Fl. 20 BOUNDARY 863PB 682200 TCX-2-2303-H3 F-A VT- 3 STRUT. TDLR VERIFICATION FW-2-101-403-C62R Fl. 20 6 BOUNDARY 863RB 682250 TCX.2-2303-H3 C-C MT WELDED ATTACHMENT. TDLR FW-2-101-403-C62R C3 . 20 VERIFICATION BOUNDARY.

863RB 682300 TCX-2-2303-H2 F-A VT -3 STRUT. TDLR VERIFICATION FW-2-101-404-C52R Fl. 20 BOUNDARY 856RB 682350 TCX-2-2303-H2 C-C Kr WELDED ATTACHMENT. TDLR FW-2-101-404-C52R C3.20 6 VERIFICATION BOUNDARY.

856RB 682400 TCX-2-2303-H5 F-A VT- 3 STRUT. TDLR VERIFICATION FW-2-101-405-C52R Fl. 20 6 - BOUNDARY 8S 7kB 682500 TCX-2-2303 H4 F-A VT- 3 STRUT. TDLR VERIFICATION FW-2-101-406-C52R F1. 20 6 BOUNDARY 855RB 682650 TCX-2-2303-HI C-C MT WELDED ATTACHMENT. TDLR FW-2-101-700-C52R C3 .20 6 - VERIFICATION BOUNDARY.

85 5RB

DATE: 07/22/09 COMANCHE PEAK UNIT 2 PAGE: 40 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS 3 SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NOE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS COMPONENT COOLING 872000 CC-2-AB-018-113 F-A VT-3 TX-ISI-8-R5 BOX CC-2-040-403-A33R F1.30 6 - -200 R180 800A03 872050 CC 2-AB-01.8-H3 D-A VT-I TX-ISI-8-R5 WELDED ATTACHMENT CC-2-040-403-A33R D1.20 6 - -200 R180 800AS 872100 CC-2-AB-018-H4 F-A VT-3 TX-ISI-8-R5 STRUT CC-2-040-404-A33R F1.30 6 - -200 RI80 800AB 872150 CC-2-AB-018-H4 D-A VT-I TX-ISI-8-R5 WEI,DED ATTACHMENT CC-2-040-404-A33R Dl . 20 6 - -200 R180 800AB 872200 CC-2-AB-018-H5 F-A VT-3 TX-ISI-8-R5 STRUT CC-2-048-402-A33R Fl .30 8 - -200 R170 8OCAB 882900 CC-2-AR-039-H9 F-A VT-3 STRUT CC-2-156-710-A563R Fl. 30 10 X- 194 882950 CC-2-AB-039-H9 D-A VT- I WELDED ATTACHMENT CC-2-156-710-A53R D1.20 10 X-194 883000 CC-2-AR-049-Hi F-A VT-3 SNUBBER CC-2-007-001-A73K Fl .3 0 6 X-245

DATE: 07/22/09 COMANCHE PEAK UNIT 2 PAGE - 41 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS 3 SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS COMPONENT COOLING 883050 CC-2-AB-049-H1. D-A VT- WELDED ATTACHMENT CC-2-007-001-A73K DI .20 X-245 883400 CC-2-AR-050-HI F-A VT, 3 STRUT CC-2-011 001-A63R FI.30 6 X-241 883450 CC-2-AB-050-Hl D-A VTI-1 WELDED ATTACHMENT CC-2-011-001-A63R Dl. 20 6 X-241 883600 CC-2-AB-050-H3 F-A VT-3 STRUT CC-2-011-003-A73R Fl. 30 X-245 883650 CC-2-.AB-05O-H3 D-A VT-I WELDED ATTACHMENT CC:2-013-003-A73R Dl. 20 6 X-245 886300 CC-2-EC-003A-HI F- A VT- 3 STRUT CC-2-107-70C-E23R Fl . 30 6 X- II5B 891200 CC-2-RB-046-H2 F-A VT- 3 BOX CC-2-204-407-CS3A Fl .30 6

2. 15SE 891250 CC-2-R*B-046-H2 D-A VT-I1 WELDED ATTACHMENT CC-2-204-407 C53A D1. 20 6 2-15SE

DATE: 07/22/09 COMANCHE PEAK UNIT 2 PAGE: 42 INSERVICE INSPECTION SCHEDULE SECOND INTERVAl., SECOND PERIOD, SECOND OUTAGE (09RF)

CIASS 3 SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS COMPONENT COOLING 891600 CC-2-RB-046-H6 F-A VT-3 STRUT CC-2-204-421-C53R Fl. 30 6 2-15SE 891650 CC-2-RB-046-H6 D-A VT- I WELDED ATTACHMENT CC!2-204-421-C53R DI.20 6 2-15SE 894000 CC-2-RB-097-HI F-A VT-3 STRUT CC-2-201-402-C53R Fl. 30 8 2-155G 894050 CC-.2-RB-097-HI D-A VT-I WELDED ATTACHMENT CC-2-201-402-C53R D1. 20 8 2-15SG 894100 CC-2-RB-097-H2 F-A VT-3 STRUT CC-2-201-404-C53R F1.30 8 2- 1550 894150 CC-2-RB-097-H2 D-A VT- I WELDED ATTACHMENT CC-2-201-404-C53R D1.20 8 2- 1550 896600 CC-2-SB-036-H3 F-A VT- 3 STRUT CC-2-028-417-$33R Fl. 30 24 2'071 896650 CC-2-SB-036-H3 D-A VT- 1 WELDED ATTACHMENT CC-2-028-417-$33R DI20 24 2-071

DATE: 071/22/09 COMANCHE PEAK UNIT 2 PAGE: 43 INSERVICE INSPECTION SCHEDULE SECOND INTERVAL, SECOND PERIOD, SECOND OUTAGE (09RP)

CLASS 3 SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NDE SIZE.SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS COMPONENT COOLING 896700 CC-2-SB-036-H4 F-A VT-3 STRUT CC-2-028-422-$33R Fl.. 30 24 2-071 89675i0 CC-2-SB-036-H4 D-A VTr- 1 WELDED ATTACHMENT CC- 2-028-422-S33R Dl. 20 24 2-071 896900 CC-2-SB-037-H2 F-A VT-3 SPRING CC-2-077-403-S43S Fl.30 18 2.069 896950 CC-2-SB-037-112 D-A VT-I WELDED ATTACHMENT CC-2-077-403-S43S Dl. 20 18 2-069 897200 CC-2-SB-037-115 F-A VT- 3 SPRING CC-2-077-406-S43S FI .30 18 2-069 897250 CC-2-SB-037-H5 D-A VT -1 WELDED ATTACHMENT CC-2-077-406-S43S D] .20 18 2-069 902500 CC-2-SB-047-H2 F-A VT-3 TX-ISI-8-R5 STRUT CC-2-008-402-S33R F1. 30 24 200 R063 800AB 902550 CC-2"SB-047-H2 D-A VT-I TX-ISI-8-R5 WELDED ATTACHMENT CC-2-.008-402-$33R DI.20 24 200 R063 800SB

DATE: 07/22/09 COMANCHE PEAK UNIT 2 PAGE: 44 INSERVICE INSPECTION SCHEDULE SECOND !NTERVAL, SECOND PERIOD, SECOND OUTAGE (09RF)

CLASS 3 SCHEDULED COMPONENTS ASME SEC. XI CALIBRATION BLOCK/

SUMMARY

EXAMINATION AREA CATGY NOE SIZE-SCHEDULE-ACCESS/

NUMBER IDENTIFICATION ITEM NO METH PROCEDURE LOCATION INSTRUCTIONS COMPONENT COOLING 907750 CC-2-SB-063-H4 D-A VT -1 WELDED ATTACHMENT CC-2-146-405-$43R D1.20 6 2-086 908100 CC-2-SB-063-H8 F-A VT- 3 STRUT CC-2-167-402-S43R Fl .30 6 2-086 908150 CC-2-SB-063-H8 0-A V¶P-1 WELDED ATTACHMENT CC-2-167-402--43R D1.20 6 2-086

STEAM GENERATOR ISI SCOPE (Category B-Q) for 2RF1l PRIMARY

  • 20% Tube end + Point in HL in all SGs
  • 20% MRPC HL TTS in all SGs 2RF1l
  • 20% Tube end + Point CL in all SGs

.October 3, 2009

  • 20% MRPC of HL BLG/OXP in all SGs
  • 5% Bobbin in all SGs (Prior indications, tubes with potentiall elevated residual stress)
  • Numbers of Robots - Four (ROSA)