CP-201200331, Clarification to Relief Request No. A-2 for the Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Geometric Limitations (Second Interval Start Date: August 03, 2004)

From kanterella
Jump to navigation Jump to search

Clarification to Relief Request No. A-2 for the Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Geometric Limitations (Second Interval Start Date: August 03, 2004)
ML12124A269
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 04/16/2012
From: Flores R, Madden F
Luminant Power, Luminant Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-201200331, TXX-12056
Download: ML12124A269 (2)


Text

Luminant Rafael Flores Senior Vice President

& Chief Nuclear Officer rafael.flores@Luminant.com Luminant Power P 0 Box 1002 6322 North FM 56 Glen Rose. TX 76043 T 254 897 5550 C 817 559 0403 F 254 897 6652 CP-201200331 Ref. # 10 CFR 50.55a(g)(6)(ii)

Log # TXX-12056 April 16, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT DOCKET NO. 50-446 CLARIFICATION TO RELIEF REQUEST NO. A-2 FOR THE UNIT 2 SECOND 10 YEAR ISI INTERVAL FROM 10 CFR 50.55a INSPECTION REQUIREMENTS DUE TO GEOMETRIC LIMITATIONS (SECOND INTERVAL START DATE: AUGUST 03, 2004)

REFERENCE:

Letter logged TXX-12002 dated January 5, 2012 from Rafael Flores to the NRC submitting Relief Request No. A-2 for the Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements due to Geometric Limitations

Dear Sir or Madam:

Pursuant to 10 CFR 50.55a(g)(6)(ii), Luminant Generation Company, LLC (Luminant Power) submitted Relief Request A-2 (see reference) for Comanche Peak Unit 2 for the second ten year inservice inspection interval. Luminant Power had determined that certain inspection requirements of ASME Code Case N-729-1, "Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds,Section XI, Division 1," are impractical due to geometric limitations.

This letter is being submitted to clarify the following statement in TXX-12002:

"This letter supersedes TXX-11106 dated December 14, 2011."

TXX-11106 had originally been issued on December 14, 2011, submitting Relief Request A-2. However, the enclosure to that letter had a Westinghouse cover letter attached which was stamped "Westinghouse Proprietary Class 3" even though all the information contained in the letter was non-proprietary.

TXX-11106 was rejected by the NRC Document Control due to this proprietary issue. After discussion with the NRR Project Manager, Luminant Power resubmitted Relief Request A-2 in its entirety. Therefore TXX-11106 is not needed for review and approval of Relief Request A-2 by the NRC.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance A b4-7~

Callaway

  • Comanche Peak - Diablo Canyon
  • Palo Verde
  • San Onofre South Texas Project
  • Wolf Creek

U. S. Nuclear Regulatory Commission TXX-12056 Page 2 04/16/2012 No undue risk to the public health and safety is presented by this request.

This communication contains no new licensing basis commitments regarding Comanche Peak Unit 2.

Should you have any questions, please contact Mr. Jack Hicks at (254)897-6725.

Sincerely, Luminant Generation Company LLC Rafael Flores By: & 2 W- aA.ýL

./iredW. Madden /

Director, Oversight & Regulatory Affairs c- E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak Jack Ballard, ANII, Comanche Peak Luis Ponce, TDLR