MONTHYEARCP-202200003, (CPNPP) - Annual Report of Changes in Peak Cladding Temperature2022-05-16016 May 2022 (CPNPP) - Annual Report of Changes in Peak Cladding Temperature CP-202100152, (CPNPP) - 2020 Annual Radioactive Effluent Release Report2021-04-28028 April 2021 (CPNPP) - 2020 Annual Radioactive Effluent Release Report CP-201800383, Amended Annual Report of Changes in Peak Cladding Temperature2018-06-20020 June 2018 Amended Annual Report of Changes in Peak Cladding Temperature CP-201700227, Transmittal of 2017 Radiological Environmental Operating Report2018-04-30030 April 2018 Transmittal of 2017 Radiological Environmental Operating Report CP-201700193, Annual Report of Changes in Peak Cladding Temperature2017-04-12012 April 2017 Annual Report of Changes in Peak Cladding Temperature CP-201600195, Annual Report of Changes in Peak Cladding Temperature2016-03-31031 March 2016 Annual Report of Changes in Peak Cladding Temperature CP-201500263, Annual Report of Changes in Peak Cladding Temperature2015-04-13013 April 2015 Annual Report of Changes in Peak Cladding Temperature ML14127A0682014-04-24024 April 2014 Transmittal of the 2013 Radiological Operating Report CP-201400445, Submittal of the Annual Non-Radiological Environmental Operating Report 20132014-04-24024 April 2014 Submittal of the Annual Non-Radiological Environmental Operating Report 2013 CP-201300391, Submittal of Annual Report of Changes in Peak Cladding Temperature2013-04-25025 April 2013 Submittal of Annual Report of Changes in Peak Cladding Temperature CP-201300553, Submittal of the Annual Non-Radiological, Environmental Operating Report for 20122013-04-25025 April 2013 Submittal of the Annual Non-Radiological, Environmental Operating Report for 2012 ML13123A2512013-04-10010 April 2013 Transmittal of Year 2012 Radiological Environmental Operating Report CP-201300040, Comanche Peak, Units 1 and 2 - Transmittal of Year 2012 Radiological Environmental Operating Report2013-04-10010 April 2013 Comanche Peak, Units 1 and 2 - Transmittal of Year 2012 Radiological Environmental Operating Report CP-201200034, Comanche Peak, Units 1 and 2, Submittal of the Annual Non-Radiological Environmental Operating Report for 20112012-04-30030 April 2012 Comanche Peak, Units 1 and 2, Submittal of the Annual Non-Radiological Environmental Operating Report for 2011 CP-201200315, Annual Report of Changes in Peak Cladding Temperature2012-04-17017 April 2012 Annual Report of Changes in Peak Cladding Temperature CP-201000646, Transmittal of Year 2009 Radiological Environmental Operating Report2010-04-29029 April 2010 Transmittal of Year 2009 Radiological Environmental Operating Report ML0912803742009-04-0909 April 2009 Radioactive Effluent Release Report, January 1, 2008 - December 31, 2008 CP-200900615, Comanche Peak, 2008 Radioactive Effluent Release Report, January 1, 2008 - December 31, 20082009-04-0909 April 2009 Comanche Peak, 2008 Radioactive Effluent Release Report, January 1, 2008 - December 31, 2008 CP-200900472, Submittal of Annual Report of Changes in Peak Cladding Temperature2009-03-31031 March 2009 Submittal of Annual Report of Changes in Peak Cladding Temperature CP-200900345, Annual Operating Report for 20082009-02-26026 February 2009 Annual Operating Report for 2008 CP-200900007, Submittal of Annual Report of Changes in Peak Cladding Temperature2009-01-0808 January 2009 Submittal of Annual Report of Changes in Peak Cladding Temperature CP-200800990, 10CFR50.59 Evaluation Summary Report 0014 (for 08/02/2006 Through 02/01/2008) and Commitment Material Change Evaluation Report 00082008-08-0404 August 2008 10CFR50.59 Evaluation Summary Report 0014 (for 08/02/2006 Through 02/01/2008) and Commitment Material Change Evaluation Report 0008 CP-200800613, Transmittal of Year 2007 Annual Radiological Environmental Operating Report2008-04-24024 April 2008 Transmittal of Year 2007 Annual Radiological Environmental Operating Report CP-200800244, Transmittal of Annual Operating Report for 20072008-02-28028 February 2008 Transmittal of Annual Operating Report for 2007 CP-200800053, Submittal of Annual Report of Changes in Peak Cladding Temperature for Comanche Peak Steam Electric Station (CPNPP) Units 1 and 22008-01-10010 January 2008 Submittal of Annual Report of Changes in Peak Cladding Temperature for Comanche Peak Steam Electric Station (CPNPP) Units 1 and 2 CPSES-200700859, Submittal of the Annual Non-Radiological Environmental Operating Report for 20062007-04-27027 April 2007 Submittal of the Annual Non-Radiological Environmental Operating Report for 2006 ML0712300732007-04-26026 April 2007 Radioactive Effluent Release Report CPSES-200700451, Annual Operating Report for 20062007-02-28028 February 2007 Annual Operating Report for 2006 CPSES-200600395, Annual Operating Report for 20052006-02-24024 February 2006 Annual Operating Report for 2005 CPSES-200500638, Correction to Annual Operating Report for 20042005-03-17017 March 2005 Correction to Annual Operating Report for 2004 CPSES-200500361, Annual Operating Report for 20042005-02-25025 February 2005 Annual Operating Report for 2004 CPSES-200500104, Annual Report of Changes in Peak Cladding Temperature2005-01-10010 January 2005 Annual Report of Changes in Peak Cladding Temperature CPSES-200401138, Environmental Protection Plan Annual Environmental Operating Report for 20032004-04-21021 April 2004 Environmental Protection Plan Annual Environmental Operating Report for 2003 CPSES-200401136, Transmittal of the Annual Radiological Environmental Operating Report for 20032004-04-21021 April 2004 Transmittal of the Annual Radiological Environmental Operating Report for 2003 CPSES-200400378, Transmittal of the Annual Operating Report for 20032004-02-27027 February 2004 Transmittal of the Annual Operating Report for 2003 CPSES-200300852, Annual Environmental Operating Report for 20022003-04-29029 April 2003 Annual Environmental Operating Report for 2002 CPSES-200300849, Annual Radiological Environmental Operating Report for 20022003-04-29029 April 2003 Annual Radiological Environmental Operating Report for 2002 CPSES-200300346, Annual Operating Report for 20022003-02-28028 February 2003 Annual Operating Report for 2002 CPSES-200201244, (CPSES) Transmittal of the Annual Radiological Environmental Operating Report for 20012002-04-18018 April 2002 (CPSES) Transmittal of the Annual Radiological Environmental Operating Report for 2001 CPSES-200200643, Clarification to Annual Operating Report for 20012002-03-15015 March 2002 Clarification to Annual Operating Report for 2001 CPSES-200200528, Annual Operating Report for 20012002-02-28028 February 2002 Annual Operating Report for 2001 2022-05-16
[Table view] Category:Letter type:CP
MONTHYEARCP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024 License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel CP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202400319, (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-13013 August 2024 (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-0505 August 2024 (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 52024-06-26026 June 2024 (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 02024-06-18018 June 2024 (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval2024-05-30030 May 2024 (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval CP-202400175, (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-05-16016 May 2024 (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters CP-202400107, (CPNPP) - 2023 Annual Radiological Environmental Operating Report2024-04-18018 April 2024 (CPNPP) - 2023 Annual Radiological Environmental Operating Report CP-202400099, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters2024-04-0909 April 2024 (CPNPP) - Registration of Dry Spent Fuel Storage Canisters CP-202400092, (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-04-0101 April 2024 (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202400089, Property Damage Insurance2024-03-25025 March 2024 Property Damage Insurance CP-202400087, (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable2024-03-21021 March 2024 (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable CP-202400085, (CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-0707 March 2024 (CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CP-202400073, (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-03-0404 March 2024 (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator CP-202400072, (Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation2024-02-29029 February 2024 (Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300470, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-02-28028 February 2024 (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown CP-202300474, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-02-28028 February 2024 (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions CP-202400063, (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23)2024-02-12012 February 2024 (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23) CP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation CP-202300533, (CPNPP) - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-14014 November 2023 (CPNPP) - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 CP-202300442, (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program2023-09-15015 September 2023 (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program CP-202300391, (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2023-08-24024 August 2023 (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202300361, (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report2023-08-17017 August 2023 (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report CP-202300411, (Cpnpp), Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)2023-08-17017 August 2023 (Cpnpp), Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20) CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 0182023-08-15015 August 2023 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 CP-202300358, (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 1122023-08-0101 August 2023 (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112 CP-202300322, Response to Requests for Additional Information Regarding Review of the License Renewal Application – Sets 2 and 32023-07-27027 July 2023 Response to Requests for Additional Information Regarding Review of the License Renewal Application – Sets 2 and 3 CP-202300348, (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48)2023-07-18018 July 2023 (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48) CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 12023-07-12012 July 2023 Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 CP-202300262, Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 22023-06-20020 June 2023 Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 2 CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-06-15015 June 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300248, Response to Request for Additional Information Regarding License Renewal Application - Set 12023-06-13013 June 2023 Response to Request for Additional Information Regarding License Renewal Application - Set 1 CP-202300209, Response to Request for Additional Information - License Renewal Application Environmental Review2023-06-0606 June 2023 Response to Request for Additional Information - License Renewal Application Environmental Review CP-202300207, Revision to Comanche Peak Nuclear Power Plants Response to Notice of Violation (NOV) 05000445/2021011-052023-05-25025 May 2023 Revision to Comanche Peak Nuclear Power Plants Response to Notice of Violation (NOV) 05000445/2021011-05 CP-202300182, Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application2023-05-0808 May 2023 Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application CP-202300201, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0)2023-05-0404 May 2023 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0) CP-202300160, (Cpnpp), 2022 Annual Radiological Environmental Operating Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Environmental Operating Report CP-202300159, (Cpnpp), 2022 Annual Radiological Effluent Release Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Effluent Release Report CP-202300165, License Renewal Application Revision 0 - Supplement 22023-04-24024 April 2023 License Renewal Application Revision 0 - Supplement 2 CP-202300175, Submittal of 2022 Annual Environmental Operating Report (Non-Radiological)2023-04-20020 April 2023 Submittal of 2022 Annual Environmental Operating Report (Non-Radiological) 2024-09-12
[Table view] |
Text
Rafael Flores Luminant Power Senior Vice President P 0 Box 1002 MIN & Chief Nuclear Officer 6322 North FM 56 rafael.flores@Luminant.com Glen Rose, TX 76043 Lum inant T254 897 5550 C 817 559 0403 F 254 897 6652 CP-201200315 Ref. # 10CFR50.46 Log # TXX-12053 April 17, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)
DOCKET NOS. 50-445 AND 50-446 ANNUAL REPORT OF CHANGES IN PEAK CLADDING TEMPERATURE
Dear Sir or Madam:
Pursuant to 10CFR50.46(a)(3)(ii), Luminant Generation Company LLC (Luminant Power) hereby submits the attached peak cladding temperatures (PCT) for Comanche Peak Nuclear Power Plant (CPNPP), Units 1 and 2. The Large-Break Loss-of-Coolant-Accident and Small-Break Loss-of-Coolant Accident analysis for Units I and 2 were performed for Luminant Power with the approved Westinghouse methodologies listed in Technical Specification 5.6.5.
Luminant Power has reviewed the notification of 10CFR50.46 reporting information pertaining to the ECCS Evaluation Model changes that were implemented by Westinghouse for 2011. The review concludes that the effect of changes to, or errors in, the Evaluation Models on the limiting transient PCT is not significant for 2011.
Therefore, the report of the ECCS Evaluation Model changes is provided on an annual basis.
Attachment I provides an assessment of the specific changes and enhancements to the Westinghouse Evaluation Models for 2011. These model changes and enhancements do not have impacts on the PCT.
Attachment 2 provides the calculated Large-Break Loss-of-Coolant Accident (LOCA) and Small Break LOCA PCT margin allocations in effect for the 2011 Comanche Peak Units 1 and 2 Evaluation Models.
There were no changes, error corrections, or enhancements to the 1985 Westinghouse Small Break LOCA Evaluation Model with NOTRUMP. The PCT values determined in the Large Break LOCA analysis of record, combined with all of the PCT allocations, remain well below the 10CFR50.46 regulatory limit of 2200 degrees Fahrenheit. Therefore, CPNPP Units 1 and 2 are in compliance with 10CFR50.46 requirements and no reanalysis or other action is required.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance CO0 Callaway - Comanche Peak - Diablo Canyon
U. S. Nuclear Regulatory Commission TXX-12053 Page 2 April 17, 2012 This communication contains no new licensing basis commitments regarding CPNPP Units 1 and 2.
Should you have any questions, please contact Mr. J. D. Seawright at (254) 897-0140.
Sincerely, Luminant Generation Company LLC Rafael Flores By:
. Fred W.YMadden Director, Oversight & Regulatory Affairs Attachments - 1. Assessment of specific changes and enhancements to the Westinghouse Evaluation Models for 2011
- 2. CPNPP Units 1 and 2 Peak Cladding Temperatures c- E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak of TXX-12053 Page 1 of6 GENERAL CODE MAINTENANCE
Background
Various changes have been made to enhance the usability of codes and to streamline future analyses. Examples of these changes include modifying input variable definitions, units and defaults; improving the input diagnostic checks; enhancing the code output; optimizing active coding; and eliminating inactive coding. These changes represent Discretionary Changes that will be implemented on a forward-fit basis in accordance with Section 4.1.1 of WCAP-13451.
Affected Evaluation Model(s) 1996 Westinghouse Best Estimate Large Break LOCA Evaluation Model 1999 Westinghouse Best Estimate Large Break LOCA Evaluation Model, Application to PWRs with Upper Plenum Injection 2004 Westinghouse Realistic Large Break LOCA Evaluation Model Using ASTRUM Estimated Effect The nature of these changes leads to an estimated PCT impact of 00 F.
of TXX-12053 Page 2 of 6 RADIATION HEAT TRANSFER LOGIC
Background
Two errors were discovered in the calculation of the radiation heat transfer coefficient in the SBLOCTA computer code. First, existing diagnostics did not preclude non-physical negative or large (negative or positive) radiation heat transfer coefficients from being calculated. These calculations occurred when the vapor temperature exceeded the cladding surface temperature or when the predicted temperature difference was less than I degree. Second, a temperature term incorrectly used degrees Fahrenheit instead of Rankine. These errors have been corrected in the SBLOCTA code and represent a closely related group of Non-Discretionary Changes in accordance with Section 4.1.2 of WCAP-13451.
Affected Evaluation Model(s) 1985 Westinghouse Small Break LOCA Evaluation Model with NOTRUMP Estimated Effect A combination of SBLOCTA sensitivity calculations and engineering judgment led to an estimated PCT effect of 0°F for existing Small Break LOCA analysis results.
of TXX-12053 Page 3 of 6 MAXIMUM FUEL ROD TIME STEP LOGIC
Background
An error was discovered in the SBLOCTA code that allowed the fuel rod time step to exceed the specified maximum allowable time step. The time step logic has been corrected in the SBLOCTA code. This change represents a Non-Discretionary Change in accordance with Section 4.1.2 of WCAP-13451.
Affected Evaluation Model(s) 1985 Westinghouse Small Break LOCA Evaluation Model with NOTRUMP Estimated Effect A combination of SBLOCTA sensitivity calculations and engineering judgment led to an estimated PCT effect of 0°F for existing Small Break LOCA analysis results.
of TXX-12053 Page 4 of 6 GENERAL CODE MAINTENANCE
Background
Various changes have been made to enhance the usability of the codes and to help preclude errors in analyses. This includes items such as modifying input variable definitions, units, and defaults; improving the input diagnostic checks; enhancing the code output; optimizing active coding; and, eliminating inactive coding. These changes represent Discretionary Changes that will be implemented on a forward fit basis in accordance with Section 4.1.1 of WCAP-13451.
Affected Evaluation Model(s) 1985 Westinghouse Small Break LOCA Evaluation Model with NOTRUMP Estimated Effect The nature of these changes leads to an estimated PCT impact of 0°F.
of TXX-12053 Page 5 of 6 COMANCHE PEAK UNIT 2 CYCLE 13 PBOT/PMID VIOLATION
Background
The Comanche Peak Unit 2 Cycle 13 reload core design resulted in several violations of the PBOT/PMID box used in the Large Break LOCA Analysis. These violations were evaluated for Comanche Peak Unit 2 Cycle 13 operation. This change represents a Discretionary Change in accordance with Section 4.1.1 of WCAP-13451.
Affected Evaluation Model(s) 2004 Westinghouse Realistic Large Break LOCA Evaluation Model Using ASTRUM Estimated Effect The impact of the PBOT/PMID violation for Comanche Peak Unit 2 Cycle 13 was determined via a plant specific evaluation to be O°F.
of TXX-12053 Page 6 of 6 COMANCHE PEAK UNIT 1 CYCLE 16 PBOT/PMID VIOLATION
Background
The Comanche Peak Unit I Cycle 16 reload core design resulted in several violations of the PBOT/PMID box used in the Large Break LOCA Analysis. These violations were evaluated for Comanche Peak Unit 1 Cycle 16 operation. This change represents a Discretionary Change in accordance with Section 4.1.1 of WCAP-13451.
Affected Evaluation Model(s) 2004 Westinghouse Realistic Large Break LOCA Evaluation Model Using ASTRUM Estimated Effect The impact of the PBOT/PMID violation for Comanche Peak Unit 1 Cycle 16 was determined via a plant specific evaluation to be 00 F.
to TXX-12053 Page 1 of 4 Westinghouse LOCA Peak Clad Temperature Summary for ASTRUM Best Estimate Large Break Plant Name: Comanche Peak Unit I Utility Name: Luminant Revision Date: 2/22/2012 Analysis Information EM: ASTRUM (2004) Analysis Date: 7/27/2007 Limiting Break Size: Guillotine FQ: 2.5 FdH: 1.6 Fuel: OFA SGTP(%): 10 Notes:
Clad Temp(°F) Ref. Notes LICENSIS BASIS Analysis-Of-Record PCT 1492 I PCT Assessments (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS
- 1. None 0 B. PLANNED PLANT MODIFICATION EVALUATIONS
- 2. None 0 C. 2011 ECCS MODEL ASSESSMENTS
- 1. None 0 D. OTHER
- 1. None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT = 1492
References:
I. WCAP-16762-P, Revision 1, "Best-Estimate Analysis of the Large-Break Loss-of-Coolant Accident for Comanche Peak Nuclear Power Plant Unit 1Using the ASTRUM Methodology," March 2009.
Notes:
None to TXX-12053 Page 2 of 4 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Small Break Plant Name: Comanche Peak Unit I Utility Name: Luminant Revision Date: 2/22/2012 Analysis Information EM: NOTRUMP Analysis Date: 6/8/2007 Limiting Break Size: 4 inch FQ: 2.5 FdH: 1.6 Fuel: OFA SGTP(%): 10 Notes:
Clad Temp( 0°) Ref. Notes LICENSIS BASIS Analysis-Of-Record PCT 1013 I PCT Assessments (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS
- 1. None 0 B. PLANNED PLANT MODIFICATION EVALUATIONS
- 1. None 0 C. 2011 ECCS MODEL ASSESSMENTS
- 1. None 0 D. OTHER
- 1. None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT = 1013
References:
- 1. WCAP-16840-P, "Comanche Peak Nuclear Power Plant Stretch Power Uprate Licensing Report," August 2007. (Results are included in TXX-07107, "Comanche Peak Steam Electric Station (CPSES), Docket Nos. 50-445 and 50-446, Submittal of the CPSES Units I and 2 Large and Small Break LOCA Analyses," July 31, 2007.)
Notes:
None to TXX-12053 Page 3 of 4 Westinghouse LOCA Peak Clad Temperature Summary for ASTRUM Best Estimate Large Break Plant Name: Comanche Peak Unit 2 Utility Name: Luminant Revision Date: 2/22/2012 Analysis Information EM: ASTRUM (2004) Analysis Date: 7/27/2007 Limiting Break Size: Guillotine FQ: 2.5 FdH: 1.6 Fuel: OFA SGTP(%): 10 Notes:
Clad Temp(°F) Ref Notes LICENSIS BASIS Analysis-Of-Record PCT 1632 1 PCT Assessments (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS
- 1. None 0 B. PLANNED PLANT MODIFICATION EVALUATIONS
- 1. PBOT & PMID Evaluation for Cycle 12 0 2 C. 2011 ECCS MODEL ASSESSMENTS
- 1. None 0 D. OTHER
- 1. None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT = 1632
References:
- 1. WCAP-16763-P, "Best-Estimate Analysis of the Large-Break Loss-of-Coolant Accident for Comanche Peak Unit 2 Nuclear Plant Using the ASTRUM Methodology," March 2009.
- 2. LTR-LIS-09-562, "Transmittal of Updated Comanche Peak PCT Summary Sheets," September 2009.
Notes:
None to TXX-1 2053 Page 4 of 4 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Small Break Plant Name: Comanche Peak Unit 2 Utility Name: Luminant Revision Date: 2/22/2012 Analysis Information EM: NOTRUMP Analysis Date: 6/8/2007 Limiting Break Size: 4 inch FQ: 2.5 FdH: 1.6 Fuel: OFA SGTP(%): 10 Notes:
Clad Temp(°F) Ref. Notes LICENSIS BASIS Analysis-Of-Record PCT 1210 1 PCT Assessments (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS
- 1. None 0 B. PLANNED PLANT MODIFICATION EVALUATIONS
- 1. None 0 C. 2011 ECCS MODEL ASSESSMENTS
- 1. None 0 D. OTHER
- 1. None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT = 1210
References:
- 1. WCAP-16840-P, "Comanche Peak Nuclear Power Plant Stretch Power Uprate Licensing Report," August 2007. (Results are included in TXX-07107, "Comanche Peak Steam Electric Station (CPSES), Docket Nos. 50-445 and 50-446, Submittal of the CPSES Units I and 2 Large and Small Break LOCA Analyses," July 31, 2007.)
Notes:
None