05000293/LER-1983-010, Forwards LER 83-010/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 83-010/03L-0
ML20073A226
Person / Time
Site: Pilgrim
Issue date: 03/24/1983
From: Mathis C
BOSTON EDISON CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20073A229 List:
References
83-78, NUDOCS 8304110696
Download: ML20073A226 (1)


LER-2083-010, Forwards LER 83-010/03L-0
Event date:
Report date:
2932083010R00 - NRC Website

text

i s:

sonen k' Edison ce-m PILGRIM NUCLEAR POWER STATION RFD No 1 Rocky HILL RoAo PLyuouTH. MASSACHUSETTS O2360 C. J M AT HIS STATION M ANAGER mea'= Station March 24, 1983 BECo Ltr. #83-78 Mr. Ronald C. Haynes

'i s Regional Administrator, Region 1

', \ U.S. Nuclear Regulatory Commission 5 631 Park Avenue

, _ 0- ' King of Prussia, PA 19406 Docket Number 50-293 License DPR-35

Dear Sir:

The attached Licensee Event Report 83-010/03L-0 "MOV 1400-4A, Core Spray Test Valve", is hereby submitted in accordance with the requirements of Pilgrim Nuclear Power Station Technical Specification 6.9.B.2. b.

If there are any questions on this subject, please contact us.

Respectfully submitted, kl C.J. Ma his Station Manager Pilgrim Station GGW/ep.

Enclosure:

LER 83-010/03L-0 cc: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Standard BECo LER Distribution 9304110696 830324 PDR ADDCK 05000293 S PDR M*