05000293/LER-1983-020, Telecopy LER 83-020/01X-0:on 830502,daily Surveillance Testing Per Tech Spec Section 4.11.D Not Performed.Caused by Failure to Revise Procedures & Inadvertent Removal of Sections from Tech Specs.Procedures Revised

From kanterella
Jump to navigation Jump to search
Telecopy LER 83-020/01X-0:on 830502,daily Surveillance Testing Per Tech Spec Section 4.11.D Not Performed.Caused by Failure to Revise Procedures & Inadvertent Removal of Sections from Tech Specs.Procedures Revised
ML20074A859
Person / Time
Site: Pilgrim
Issue date: 05/02/1983
From: Graham E
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
LER-83-020-01X, LER-83-20-1X, NUDOCS 8305160145
Download: ML20074A859 (1)


LER-2083-020, Telecopy LER 83-020/01X-0:on 830502,daily Surveillance Testing Per Tech Spec Section 4.11.D Not Performed.Caused by Failure to Revise Procedures & Inadvertent Removal of Sections from Tech Specs.Procedures Revised
Event date:
Report date:
2932083020R00 - NRC Website

text

.

BOS10N Eat 'N COMPANY PROMI'r REPORU =E OCCt!RRENCE TELEC01' . IESSAGE TO: (215) 3 3 7-S T.! 'i DATE/ TIME: May 2,1983 / 1400 Telephone Nuntaer TO: FROM: Pilgrim Nuclear Power Station CRegiond11Admid!hratorCRegioriil5 RFD#1, Rocky 11111 Road U. S. Nuclear Regulatory Commissien Plymouth, MA 02360 631 Park Avenue King of Prussia, PA 19406

. Dacket Number 50-293 -

l License DPR-35

( Assigned LER Number '83-020/0lX-0 Reported per T.S. Section 6.9.3.1.f.

Event

Description:

Failure to perform daily surveillance testing per the require-ments of Section 4.ll.D of the Tech. Specs. which is required to assure con,iiance with Section 3.11.D of the Tech. Specs.

CauseandCorrectiveAction-ThecauseofthiseventisbelievedtobeafaIEre to revise l'NPS Procedures when Sections 3.11.D and 4.ll.D were incorporated into the PNPS Tech. Specs. (1/8/80) compounded by an inadvertent removal of these ~

~

sections from the Tech. Specs. (5/10/80).

, We have initiated an SRO change to PNPS Procedure 8.A.23 reflecting the re<hi ement2 t o f Sections 3.11.D and 4.11.D. We have also initiated an investigation to determine if, since 1/8/80, we have operated in compliance with Section 3.ll.D. At this time we believe that since 1/8/80, we have operated within the requirements of our power flow map and therefore have operated in compliance with Section 3.ll.D.

Facility Status: ,

99  % Thermal MW c; Routine Startup g) Shutdown a

d) Routine Shutdown h) Refueling e) Stead: State X 1) Other

, f) Load Changing j) Not Applicable l

A written followup report will be sent within two vecks.

NRC Person Notified Prepared by e

e N

- cc: Document Control Desk I 0.S. Nuclear Regt.latory Commission Washington, D.C. 20555 St.andard BECo. LER Distribution ROO5160145 930502

'S PDR ADOCK 05000293 PDR

(

i a r +-_ r m _______ d r_-~~.~2_-~_=___ - ~ ~ - ' -

- * = ' ' ~~*'"' ~**!** * '