ML20059D664
| ML20059D664 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 08/30/1990 |
| From: | Bird R BOSTON EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 90-105, NUDOCS 9009070139 | |
| Download: ML20059D664 (1) | |
Text
- - _ _ _ _ _ _ _ _ _ - - -
4 80570NEDf50N Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360 10CFR50.54 (q)
Ralph G. Bird Senior Vice President - Nucleat U
S. Nuclear Regulatory Commission Document Control Desk Hashington, DC 20555 BECo 90 105 License DPR-35 Docket 50-293 10CFR50, APPENDIX E.V SUBMITTAL OF REVISED fMERGENCY PLAN IMPLEMENTING PROCEDURES A complete set of PNPS Emergency Plan Implementing Procedures was sent to you by BECo Letter 88-142 on October 4, 1988. -Attached are revised Emergency Plan Implementing Procedures that we are submitting in accordance with the provisions of 10CFR50, Appendix E, Section V.
Please update your Emergency Plan Implementing Procedure Manual with these revised procedures (with Table of Contents).
?
O,
. G.
rd Attachments:
Table of Contents, dated 08/24/93 EP-IP-140, General Emergency, Rev. 3 EP-IP-229, TSC/0SC Equipment Operation, Rev. I cc: Mr. R. Eaton, Project Manager (1 copy) i Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation m
U. S. Nuclear Regulatory Commission chN Mail Stop:
1401 g8' One White Flint North o
111555 Rockville Pike o%
Rockville, MD 20852 h
U. S. Nuclear Regulatory Commission (2 copies) y oca Region 1 f
f Regional Administrator
/
o, 475 Allendale Road (5
Sh King of Prussia, PA 19406 er' 0 01/,J 1
Senior NRC Resident Inspector (1 copy)
Pilgrim Nuclear Power Station
_