BECO-89-174, Forwards Pilgrim Nuclear Plant Station Final Assessment Rept, Summarizing Results of self-assessments & Evaluations Conducted Throughout Implementation of Plant Restart Plan & Power Ascension Program
| ML20011D163 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 12/14/1989 |
| From: | Bird R BOSTON EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20011D164 | List: |
| References | |
| BECO-89-174, NUDOCS 8912210167 | |
| Download: ML20011D163 (2) | |
Text
_
t
(
_f
.os===s.
Pilgrim Nuclear Fower Station
'G.
Rocky Hill Road Plymouth, Massachusetts 02360 l
Italph G. Bird -
. Senior Vice President - Nuclear December 14, 1989 BECo Ltr. f89-174 U.S.
Nuclear Regulatory Commission
' Attn:
Document Control Desk j
Washington, DC 20555 License No. DPR-35 Docket No. 50-293
Subject:
PILGRIM NUCLEAR POWER STATION l
FINAL ASSESSMENT REPORT
Dear Sir:
This letter transmits the Pilgrim Nuclear Power Station (PNPS)
Final Assessment Report.
The report summarizes the results of the
-self-assessments and evaluations which Boston Edison has conducted j
throughout' implementation of the PNPS Restart Plan and Power
-Ascension-Program.
l The Final Assessment Report provides the bases for closure of l-the Power Ascension Program and demonstrates satisfaction of the conditions of CAL 86-10 and its Supplements.
The conclusions of-the Report are based upon observations and results obtained during restart and during the Power Ascension Program; including testing at full power, conduct of the October-November 1989 surveillance /
. maintenance outage, and post-outage operations under the Power
' Ascension Program.
On this basis, Boston Edison requests closure 3
of CAL 86-10 and its Supplements.
One material problem identified during the Power Ascension Program remains unresolved: tripping of the
'A' recirculation pump motor-generator while in Manual-Remote mode at high flow conditions.-
Resolution of this problem will be reported separately.
l l
1 1
0 M: amre n "%h l
$$A22;g;gpgg;ggg gg cggga P
PDC I
I'
[}
i s
U.S. Nuclear Regulatory Commission License No. DPR-35 Page 2 Docket NO. 50-293 t
Please feel free to contact me or R.
A.
Ledgett of _ my staff
. if you have any questions or need additional information regarding the PNPS Final Assessment Report or our request for closure of CAL 86-10 and its Supplements.
sincerely, i
cc:
Mr. William T. Russell' Regional Administrator, Region I U.S. Nuclear Regulatory' Commission 475 Allendale Road-King of Prussia, PA 19406 U.S._ Nuclear Regulatory Commission Region.I' 475 Allendale Road King of Prussia, PA 19406 Mr. Daniel Mcdonald Licensing Project Manager Office of Nuclear Reactor Regulation U.S.
Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 02852 Mr. William F. Kane, Director Division of Reactor Projects Pilgrim Restart Panel Chairman Division of Reactor Projects U;S. Nuclear Regulatory Commission i
475 Allendale Road 1
King of Prussia, PA 19406 ll Mr. Jon R. Johnson
. Projects Branch #3 L
' Division of Reactor Projects L
U.S.
Nuclear Regulatory Commission l-475 Allendale Road King of Prussia, PA 19406 I
l
. Senior NRC Resident Inspector l
Pilgrim N'1 clear Power Station L
_