Monthly Operating Rept for Jul 1994 for Jm Farley Nuclear Plant
ML20072E036
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/31/1994
From: Hill R, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9408220083
Download: ML20072E036 (9)


Text

,

I Southern Nuclear Operat;ng Company l Post O*fice Box 1295 j Birmingham, Alabama 35201 i Teleonone (205) 868 5131 L

o.v. uo,.y Southern Nudear Operating Company -

vice Pres. cent ran te Pro;ect the southern e'ectnc system August 12, 1994 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Joseph M. Farley Nuclear Plant Monthly Ooerating Data Renort Gentlemen:

Attached are the July 1994 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, gf) 7A Dave Morey RWC:jgp(mor)

Attachments

! cc: Mr. S. D. Ebneter l Mr. B. L. Siegel Mr. T. M. Ross i

l

  • (1 * \ f +*

[p

.10 V L C(' D 940G22OO93 940731 I /:

l PDR ADOCK 05000348 l

l R PDR I\

Joseph M. Farley Nuclear Plant

- Unit 1 Narrative Summary of Operations r July 1994 At 0138 on 07/02/94, the unit was ramped down to 15 percent power to modify the IC reactor coolant pump motor so that future oil additions can be made to the lower oil reservoir without reducing power.

The unit was returned to 100 percent p er at 2250 on 7/2/94.

There was no major safety related maintenance perfonned during the month.

1 I

l

. .. - - - - - _ _ --- -_ - - - - _ - _ - - - _ -- -_ - _ - - - - - - - - - -_ a

-. .. . - . . . - . - - . - . . = .. _ - - . . - -

i

-.;  ; 1 OPERATING DATA REPORT DOCKET NO. 50-348 DATE August 5,1994 COMPLETED BY R. D. Hill TELEPHONE (205) 899-5156

)

i l

OfERATINGSTATUS I i

1

1. Unit Name: Joseph M. Farley - Unit 1 Notes i

- 2. Reporting Period: July 1994 I) Cumuletive data since 12-01-77, date

3. Licensed Thermal Power (MWt): 2,652 of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): _

855.7

7. Maximum Dependable Capacity (Net MWe): 812
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason N/A
9. Power Level To Which Restricted, If Any (Net MWe N/A
10. Reasons For Restrictions,If Any: N/A This Month Yr.to Date Cumulative i i1. Ilours in Reporting Period 744.0 5,087.0 146,087.0
12. Number OfIlours Reactor Was Critical 744.0 3,919.9 115,583.8
13. Reactor Reserve Shutdown liours 0.0 0.0 3,650.0
14. Ilours Generator On-line 744.0 3,874.3 113,780.9
15. Unit Reserve Shutdown Ilours 0.0 0.0 0.0 '

16, Gross Thermal Energy Generated (MWil) 1,946,859.7 9,911,808.2 292,404,213.4

. 17. Gross Electrical Energy Generated (MWil) 630,509.0 3,216,086.0 94,231,132.0

18. Net Electrical Energy Generated (MWII) 598,421.0 3,034,960.0 88,975,114.0
19. Unit Service Factor 100.0 76.2 77.9
20. ' Unit Availabilty Factor 100.0 - 76.2 77.9 l'

~ 21, Unit Capacity Factor (Using MDC Net) 99.1 73.5_ 74.8

22. Unit Capacity Factor (Using DER Net) . 97.0 72.0 73.5
23. Unit Forcer Outage Rate - 0.0 0.0 6.2 24, Shutdowns Geheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. ' If Shut Down at Eol Of Report Period, Estimated Date of Startupi N/A l i ?26. --Units In Test Status (Prior To Commercial Operation): Forecast Achieved 1-

, Initial Criticality 08/0607 - 08/09/77 inittal Electricity 03GD01 03!1302' Commercial Operation 12/0191 12/Oln7

{

m , . - - , - , . . . -

DOCKET No. 50-348 UNIT I DATE August 5,1994 COMPLETED BY R. D. Hill TELEPilONE (205) 899-5156 _

MONTH July DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 820 17 814 2 442 18 814 3 812 19 814 4 813 20 817 5 815 21 815 6 821 22 814 7 820 23 817 I 8 816 24 816 l

9 817 25 816 ,

10 816 26 817 11 817 27 818 12 816 28 818 13 817 29 821 14 _

817 30 819 15 816 31 819 16 __

814 INSIRUCIIOMi On thu format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SIIUTDOWNS AND POWER REDUCTIONS ,,

DOCKET NO. 50-348 UNIT NAME L M, Farley - Unit 1 -

DATE_ August 5.1994 COMPLETED BY R. D. Ilill REPORT MONTH July TELEPilONE (205)S99-5156 i 8

!i

!' f MEllioD of LICENSEE CAUSE AND CORRECTIVE li i 4 j DURATloN SHUTTING lt EVENT SYSTEM COMPONENT ' ACI'loN To  !

!  ; I; j NO DATE iTYPE (1)! IloURS REASON (2) DoWN REACTOR (3Q REPORT # ,_ CODE (4) COD.E (5) _

PRI; VENT RECURRENCE _ _ _ j!

j 004 07/02/94 S I 21_2 B N/A N/A l N/A NIA At 0138 on 7/2/94, the unit was ramped down to ll 15 percent power to modify the IC reactor ji l

i coolant pump motor so that future oil additions }!

can be made without reducing power. i The unit was returned to 100 percent power at

! 2250 on 7/2/94. 1 li  !

l s a _

)0 1: 2: 3: 4: 5:

F. rorced Reason Method Exhibit G- Instructions for Exhibit ! - Same Source S: Scheduled A - Equipment Fadure (Explain) 1 - Manual Preparanons of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refuelmg 3 - Automatic Scram Repon (LER) File (NUREG_0161)

D - Regulatory Restriction 4 - Other (Explain)

E - operator Training & License Exammation F- Administratise G - operational Error (Explam) 1I - other(Explain)

Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations July 1994 There were no unit shutdowns or major power reductions during the month.

There was no major safety related maintenance perfonned during the month.

l l

l 1

i

{

1

}

. l

  • . j OPERATING DATA REPORT \

- DOCKET NO. 50-364 DATE Auget 5, !994 COMPLETED IW .R. D. Hill TELEPIIONE (205) 899-S i S6- i 1

OPERATINGJiTATMS

l. Unit Name: Joseph M. Farley - Unit 2 Notes
2. Reporting Period: July 1994 I) Cumulative data since 07-30-81, date
3. Licensed Thermal Power (MWt): 2,652 of commercial operation.
4. . Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 863.6

' 7. Maximum Dependable Capacity (Net MWe): 822

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason N/A ,,

-9. Power Level To Which Restricted,if Any (Net MWe N/A

10. Reasons For Restrictions, If Any
N/A I

I This Month Yr.to Date Cumulative l

! 1. Hours in Reporting Period 744.0 5,087 0 114,000.0 )

12. Number Of Ilours Reactor Was Critical 744.0 5,087.0 98,040.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 _ 138.0
14. Ilours Generator On-line 744.0 5,087.0 96,648.8
15. Unit Reserve Shutdown llours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWil) 1,973,016.9 13,422,349.4 246,957,702.2
17. _ Gross Electrical Energy Generated (MWil) 643,528.0 4,421,273.0 80,970,734.0
18. Net Electrical Energy Generated (MWil) 613,152.0 4,212,505.0 76,787,594.0
19. Unit Service Factor 100.0 100.0 84.8
20. Unit Availabilty Factor 100.0 100.0 84.8
21. Unit Capacity Factor (Using MDC . Net) 100.3 100.7 82.1
22. Unit Capacity Factor (Using DER Net) 99.4 - 99.9 81.3
23. Unit Forced Outage Rate 0.0 0.0 4.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)

N/A

, 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A

- 26. Units in Test Status (Prior To Commercial Operation)! Forecast Achieved Initial Criticality 05!0bl81. 05/0381 Initial Electricity 021481 05!2281 Commercial Operation 01/0u11. 01/30lEl.

J n.- n

DOCKET NO. 50-364

- UNIT 2 DATE August 5,1994 CO%IPLETED BY R. D. Hill rELEPilONE (205)899-5156 MONTli July DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 827 17 _ 822 2 823 18 822 3 854 19 823 4 821 _

20 826 5 822 21 823

~

6 827 22 824 7 828 23 826 8 823 24 824 9 824 25 824 l l

10 824 26 865 l

11- 825 27 866 12 824 28 826 ,

13 823 29 826 14 824 30 826 15 824 31 827 16 821 INSIRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 -

UNIT NAME J. M. Farley - Unit 2 .

DATE August 5,1994 COMPLETED BY R. D. Hill REPORT MONTH Jtily TELEPHONE (205) 899-5156 7 - = - - . - --. - - - - , _ _ = = - - - - - - - - ---=====q l l METHOD OF LICENSEE CAUSE AND CORRECTIVE f'

DURATION SilUTTING EVENT SYSTEM COMPONENT ACTION TO ,

NO DATE TYPE 11) . IlOURSJREASON Q,L DOWH REACTOR (3g REPORT # CODEJ CODE (5) PREVENT RFCURRENCE C~

~~

lThere were no shutdowns or power reductions during the month. [~

I

[L__a ___ _

1 - w 1: 2: 3: 4: 5:

F: Forced Reason Method Exhibit G- Instructions for Exhibit I - Same Source S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refuelmg 3 - Automatic Scram Report (1 ER) File (NUREG-0161)

D - Regulatory Restriction 4 - Other (Explain)

E - Operator Trainmg & License Examination F- Admmistrative G - Operational Error (Explain) 11 - Other (Explain) ppsen?WWW m intmnWWvnmQpMm&T*W"""NW7M.nm~mMYWWWWnece??%w:vymn::WmmnvWmwnymmW.'m*'~&7.w n,wm ne ws ki2CO L u n e M u?22.LkuE~ > - sw L Rhadhlu:W. N ah2DeM2aDh.::e 0:dk5%:O - EM D L