 Issue dateTitleTopic
CP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 131 January 2024License Renewal Application Revision 0 - Supplement 3, Revision 1
CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)29 January 2024(CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)
ML24024A21029 January 2024Summary of Regulatory Audit Regarding a License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors
IR 05000445/202300429 January 2024Integrated Inspection Report 05000445/2023004 and 05000446/2023004
ML24025A00525 January 2024Review of the Spring 2023 Steam Generator Tube Inspection Report
ML24023A02424 January 2024Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology
ML24018A10718 January 2024Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for InformationCommercial Grade Dedication
ML23319A38720 December 2023Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) MethodologyLoop seal
Anticipated operational occurrence
Hydrostatic
Coatings
Pressure and Temperature Limits Report
ML23159A20820 December 2023Request for Withholding Information from Public DisclosureAffidavit
ML23348A23919 December 2023Nonacceptance of License Amendment Request to Relocate Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements ManualFuel cladding
ML23333A08713 December 2023Transmittal of Dam Safety Inspection Report - PublicSafe Shutdown
CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 213 December 2023(Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2Safe Shutdown
High winds
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Open Phase Condition
Large early release frequency
Seismic Walkdown Report
CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation12 December 2023(Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring InstrumentationPost Accident Monitoring
ML23313A0736 December 2023Issuance of Amendment Nos. 184 and 184 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Rev. 1, Improved Roac and CAOC Fq Surveillance Technical SpecificationsAnticipated operational occurrence
Hydrostatic
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
CP-202300494, License Renewal Application Revision 0, Supplement 36 December 2023License Renewal Application Revision 0, Supplement 3Boric Acid
Finite Element Analysis
Aging Management
License Renewal
IR 05000445/202340230 November 2023NRC Security Inspection Report 05000445/2023402 and 05000446/2023402Affidavit
ML23291A43830 November 2023Notice of Availability of the Draft Plant-Specific Supplement 60, to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Comanche Peak Nuclear Power Plant, Unit Numbers 1 and 2, License Renewal ApplicaLicense Renewal
Subsequent License Renewal
ML23325A01830 November 2023Schedule Revision for the License Renewal Application ReviewAging Management
License Renewal
CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation20 November 2023License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear InstrumentationShutdown Margin
Probabilistic Risk Assessment
ML23308A00317 November 2023Letter to R. Nelson, Executive Director; Achp; Re., Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23308A00217 November 2023Letter to M. Wolfe, Executive Director; Shpo; Re., Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A30113 November 2023Letter to S. Yahola, Mekko, Kialegee Tribal Town Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23306A03013 November 2023Letter to J. Cernek, Chairman; Coushatta Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A28613 November 2023Letter to J. Bunch, Chief, United Keetoowah Band of Cherokee Indians Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A27913 November 2023Letter to B. Gonzalez, Chairman, Caddo Nation Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A28413 November 2023Letter to D. Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A28313 November 2023Letter to D. Dotson, President, Delaware Nation Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A28113 November 2023Letter to C. Hoskin, Principal Chief, Cherokee Nation; Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A28913 November 2023Letter to L. Spottedbird, Chairman, Kiowa Indian Tribe Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A29713 November 2023Letter to R. Martin, President, Tonkawa Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A28513 November 2023Letter to E. Martinez, President, Mescalero Apache Tribe Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A28713 November 2023Letter to J. Garza, Chairman, Kickapoo Traditional Tribe of Texas Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A29013 November 2023Letter to M. Pierite, Chairman, Tunica Biloxi Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A28813 November 2023Letter to L. Johnson, Chief, Seminole Nation of Oklahoma Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A30213 November 2023Letter to T. Parton, President, Wichita and Affiliated Tribes Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A29813 November 2023Letter to R. Morrow, Town King, Thlopthlocco Tribal Town Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A29613 November 2023Letter to M. Woommavovah, Chairman, Comanche Nation Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A30013 November 2023Letter to R. Sylestine, Chairman, Alabama-Coushatta Tribe of Texas Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A28213 November 2023Letter to D. Cooper, Chairman, Apache Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23317A30313 November 2023Letter to W. Yargee, Chief, Alabama-Quassarte Tribal Town Regarding Comanche Peak Draft Environmental Impact StatementLicense Renewal
ML23311A2089 November 2023Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV
ML23360A63126 October 2023FEMA, Submittal of Radiological Emergency Preparedness Final Report for the Comanche Peak Nuclear Power Plant Medical Services Drill Evaluated on August 23, 2023
CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements12 October 2023Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements
CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 44 October 2023Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4Boric Acid
Fire Barrier
Coatings
Aging Management
License Renewal
Subsequent License Renewal
Through-Wall Leak
Fire Protection Program
ML23237B42228 September 2023Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments
ML23263A02421 September 2023Revision of Schedule for the Environmental Review of the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal ApplicationLicense Renewal
CP-202300442, (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program15 September 2023(CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) ProgramIncorporated by reference
L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments12 September 2023Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments
CP-202300391, (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule24 August 2023(CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update ScheduleIncorporated by reference
Exemption Request
IR 05000445/202300523 August 2023Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2023005 and 05000446/2023005)- Mid Cycle Letter 2023
IR 05000445/202330121 August 2023NRC Examination Report 05000445/2023301 and 05000446/2023301
CP-202300411, (Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)17 August 2023(Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)
CP-202300361, (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report17 August 2023(CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day ReportNondestructive Examination
CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 01815 August 202310CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018Operator Manual Action
ML23172A1469 August 2023Aging Management Audit Report - Comanche Peak Units 1 and 2 - License Renewal ApplicationSafe Shutdown
Boric Acid
Fire Barrier
Anticipated operational occurrence
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
Aging Management
Pressure and Temperature Limits Report
Moisture barrier
License Renewal
Subsequent License Renewal
Control of Heavy Loads
Through-Wall Leak
Through Wall Leak
Fire Protection Program
Dissimilar Metal Weld
DM weld
Flow Induced Vibration
Power Uprate
Stretch Power Uprate
L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments7 August 2023Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License AmendmentsCyber Security
Safeguards Contingency Plan
Fire Protection Program
ML23213A2162 August 2023Vistra Operations Company, LLC Notification of License Renewal Inspection and Request for InformationAging Management
CP-202300358, (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 1121 August 2023(Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112
CP-202300322, Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 327 July 2023Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 3Boric Acid
Fire Barrier
Coatings
Nondestructive Examination
Aging Management
Moisture barrier
License Renewal
Subsequent License Renewal
Through-Wall Leak
Fire Protection Program
IR 05000445/202301120 July 2023Fire Protection Team Inspection Report 05000445/2023011 and 05000446/2023011Safe Shutdown
Fire Barrier
Fire impairment
Operability Determination
Fire Protection Program
CP-202300348, (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48)18 July 2023(Cpnpp), Transmittal of Revised Emergency Plan (Revision 48)Health Physics Network
Fukushima Dai-Ichi
IR 05000445/202300214 July 2023Integrated Inspection Report 05000445/2023002 and 05000446/2023002High Radiation Area
Enforcement Discretion
Temporary Modification
Functionality Assessment
Operability Determination
Through Wall Leak
Fire Protection Program
CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 112 July 2023Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Finite Element Analysis
Aging Management
License Renewal
Earthquake
Pressure Boundary Leakage
Pressure boundary leak
Dissimilar Metal Weld
Stretch Power Uprate
ML23226A23422 June 2023Post Exam Comments and Analysis with Letter
CP-202300262, Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 220 June 2023Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 2Boric Acid
Fire Barrier
Aging Management
Fire Protection Program
CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements15 June 2023Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System RequirementsSafe Shutdown
ML23164A22313 June 2023Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 1Boric Acid
Aging Management
CP-202300248, Response to Request for Additional Information Regarding License Renewal Application - Set 113 June 2023Response to Request for Additional Information Regarding License Renewal Application - Set 1
ML23156A2306 June 2023NRC Initial Operator Licensing Examination Approval 05000445/2023301 and 05000446/2023301
CP-202300209, Response to Request for Additional Information - License Renewal Application Environmental Review6 June 2023Response to Request for Additional Information - License Renewal Application Environmental Review
ML23136B29631 May 2023Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request Regarding General Design Criteria 5 and Regulatory Guide 1.81
CP-202300207, Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-0525 May 2023Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-05
ML23132A25423 May 2023Supplemental Information Needed for Acceptance of Requested Licensing Action LAR to Adopt 10 CFR 50.69,Risk-Informed Categorization & Treatment of Structures,Systems & Components for Nuclear Power Reactors EPID L-2023-LLA-0057Probabilistic Risk Assessment
Large early release frequency
ML23132A15718 May 2023Summary of the License Renewal Environmental Audit (EPID Number: L-2022-LNE-004) (Docket Numbers 50-445 and 50-446)
ML23068A0569 May 2023Request for Additional Information - Comanche Peak License Renewal Application Environmental ReviewSafe Shutdown
CP-202300182, Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application8 May 2023Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal ApplicationSafe Shutdown
CP-202300201, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0)4 May 2023(CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0)Shutdown Margin
ML23121A2204 May 2023Proposed Alternative P-1 Regarding Safeguard Building Sump PumpsIncorporated by reference
CP-202300159, (Cpnpp), 2022 Annual Radiological Effluent Release Report27 April 2023(Cpnpp), 2022 Annual Radiological Effluent Release ReportAnnual Radioactive Effluent Release Report
Annual Radiological Effluent Release Report
CP-202300160, (Cpnpp), 2022 Annual Radiological Environmental Operating Report27 April 2023(Cpnpp), 2022 Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
CP-202300165, License Renewal Application Revision 0 - Supplement 224 April 2023License Renewal Application Revision 0 - Supplement 2Boric Acid
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Coatings
Finite Element Analysis
Aging Management
Moisture barrier
License Renewal
Subsequent License Renewal
Earthquake
EVT-1
Through-Wall Leak
Through Wall Leak
Fire Protection Program
Dissimilar Metal Weld
Stretch Power Uprate
CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments20 April 2023ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments
CP-202300096, License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements20 April 2023License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems RequirementsSafe Shutdown
Operator Manual Action
Surveillance Frequency Control Program
CP-202300175, Submittal of 2022 Annual Environmental Operating Report (Non-Radiological)20 April 2023Submittal of 2022 Annual Environmental Operating Report (Non-Radiological)
CP-202300140, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-00119 April 2023Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-001Safe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Large early release frequency
ML23083B97619 April 2023Initiate Section 106 Consultation, Request for Comments on Scope of the Comanche Peak Nuclear Power Plant, Units 1, 2 License Renewal Environmental ReviewLicense Renewal
ML23083B37318 April 2023Ltr to Mark Wolfe, Shpo, Re, Initiate Section 106 Consultation and Request for Comments on Scope of the Comanche Peak NPP, Units 1, 2 License Renewal Environmental ReviewLicense Renewal
ML23082A12017 April 2023Summary of the License Renewal Severe Accident Mitigation Alternatives Audit (EPID Number: L-2022-LNE-0004) (Docket Numbers: 50-445 and 50-446)
CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments14 April 2023ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License AmendmentsSafe Shutdown
Probabilistic Risk Assessment
Cyber Security
Decommissioning Funding Plan
Large early release frequency
Safeguards Contingency Plan
License Renewal
Fire Protection Program
ML23108A21913 April 2023Relief Request RV-1 - Extension Request for Thermal Relief Valves for Comanche Peak Units 1 & 2Safe Shutdown
Mission time
IR 05000445/202300113 April 2023Integrated Inspection Report 05000445/2023001 and 05000446/2023001Internal Flooding
Enforcement Discretion
VT-2
Functionality Assessment
Operability Determination
Maintenance Rule Program
Through Wall Leak
Fire Protection Program
Power change
ML23108A22113 April 2023Application for Extension Relief Request RV-1 for Thermal Relief ValvesSafe Shutdown
Mission time
ML23068A07313 April 2023Requests for Confirmation of Information for the Environmental Review of the Comanche Peak Nuclear Power Plant, Units 1 and 2, Licensed Renewal Application (EPID Number: L-2022-LNE-0004) (Docket Numbers 50-445 and 50-446)Safe Shutdown
License Renewal
ML23097A13910 April 2023Ltr. to Marshall Pierite, Chairman, Tunica-Biloxi Tribe of Louisiana, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23097A15010 April 2023Ltr. to Chuck Hoskins, Principal Chief, Cherokee Nation, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23097A14910 April 2023Ltr. to Mark Woommavovah, Chairman, Comanche Nation, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23097A14110 April 2023Ltr. to Ryan Morrow, Town King, Thlopthlocco Tribal Town, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23097A14710 April 2023Ltr. to Deborah Dotson, President, Delaware Nation, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23097A14810 April 2023Ltr. to Jonathan Cernek, Chairman, Coushatta Tribe of Louisiana, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23097A15310 April 2023Ltr. to Wilson Yargee, Chief, Alabama-Quassarte Tribal Town Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23097A14210 April 2023Ltr. to Lewis Johnson, Chief, Seminole Nation of Oklahoma, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23097A14610 April 2023Ltr. to Brian Givens, Mekko, Kialegee Tribal Town, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23097A14310 April 2023Ltr. to Eddie Martinez, President, Mescalero Apache Tribe, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23097A14410 April 2023Ltr. to Lawrence Spottedbird, Chairman, Kiowa Indian Tribe, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23097A13810 April 2023Ltr. to Joe Bunch, Chief, United Keetoowah Band of Cherokee Indians, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23097A13710 April 2023Ltr. to Terri Parton, President, Wichita and Affiliated Tribes, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23097A14010 April 2023Ltr. to Russell Martin, President, Tonkawa Tribe of Oklahoma, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23088A18510 April 2023Ltrs to Donnis Battise, Mikko Choba, and Millie Thompson William, Mikko Istimatokia, Alabama-Coushatta Tribe of Tx, Re, Request for Comments Concerning the Er of CPNPP, Units 1, 2, License RenewalLicense Renewal
ML23097A14510 April 2023Ltr. to Juan Garza, Jr., Chairman, Kickapoo Tribe of Oklahoma, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23097A15110 April 2023Ltr. to Bobby Gonzalez, Chairman, Caddo Nation, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23097A15210 April 2023Ltr. to Durcel Cooper, Chairman, Apache Tribe of Oklahoma, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
ML23097A15510 April 2023Ltr. to Darwin Kaskaske, Chairperson, Kickapoo Tribe of Oklahoma, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License RenewalLicense Renewal
CP-202300135, License Renewal Application Revision 0 - Supplement 16 April 2023License Renewal Application Revision 0 - Supplement 1Safe Shutdown
Boric Acid
Fire Barrier
Coatings
Aging Management
Foreign Material Exclusion
Moisture barrier
License Renewal
Subsequent License Renewal
Fire Protection Program
Flow Induced Vibration
CP-202300139, (CPNPP) - Property Damage Insurance30 March 2023(CPNPP) - Property Damage Insurance
CP-202300144, (CPNPP) - Decommissioning Report30 March 2023(CPNPP) - Decommissioning ReportDecommissioning Funding Plan
Authorized possession limits
IR 05000445/202301024 March 2023Biennial Problem Identification and Resolution Inspection Report 05000445/2023010 and 05000446/2023010Safe Shutdown
Boric Acid
Probabilistic Risk Assessment
Emergency Lighting
Condition Adverse to Quality
FLEX
Significance Determination Process
Operability Determination
Maintenance Rule Program
CP-202300098, (Cpnpp), Annual Report of Changes in Peak Cladding Temperature16 March 2023(Cpnpp), Annual Report of Changes in Peak Cladding Temperature
ML23068A3789 March 2023Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000445/2023011 and 05000446/2023011) and Request for InformationSafe Shutdown
Fitness for Duty
Commercial Grade Dedication
Hydrostatic
Probabilistic Risk Assessment
Temporary Modification
Aging Management
Job Performance Measure
Fire Protection Program
ML23068A0458 March 2023Fws to NRC, Endangered Species Act Concurrence Letter for Certain Species That Are Not Likely to Be Adversely Affected by Comanche Peak License Renewal
IR 05000445/20220061 March 2023Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022006 and 05000446/2022006)Fitness for Duty
Commercial Grade Dedication
License Renewal
Exemption Request
COVID-19
ML23044A32614 February 2023License Renewal Environmental Site Audit Plan Regarding the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal ApplicationSafe Shutdown
Zebra Mussel
License Renewal
Earthquake
Environmental Justice
Power Uprate
ML23023A0012 February 2023Request for Withholding Information from Public Disclosure
ML23019A2191 February 2023License Renewal Severe Accident Mitigation Alternatives Audit Plan Regarding the Comanche Peak Nuclear Power Plant, Unit Nos. 1 & 2, Licenses Renewal Application (EPID No. L-2022-LNE-0004) (Docket Nos 50-445 and 50-446)High winds
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Fatality
IR 05000445/202200426 January 2023Integrated Inspection Report 05000445/2022004 and 05000446/2022004Offsite Dose Calculation Manual
Fire Barrier
Commercial Grade Dedication
Temporary Modification
Functionality Assessment
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Large early release frequency
Operability Determination
Through Wall Leak
Fire Protection Program
Grace period
Substantial potential for an overexposure
Operability Assessment
Siren
Overexposure
ML23025A35326 January 2023Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power SystemOpen Phase Condition
ML23023A11324 January 2023Review of the Spring 2022 Steam Generator Tube Inspection Report (Edid L-2022-LRO-0144)
IR 05000445/202201023 January 2023TI-194 Report 05000445/2022010 and 05000446/2022010Operator Manual Action
Open Phase Condition
ML22355A0434 January 2023Aging Management Audit Plan Regarding the License Renewal Application Review - SupplementAging Management
IR 05000445/202240119 December 2022Cyber Security Inspection Report 05000445/2022401 and 05000446/2022401 (Cover Letter Only)Cyber Security
Affidavit
ML22346A08613 December 2022Acknowledgment of Response to Inspection Report 05000445/2022003 and Notice of Violation
CP-202200481, Response to Request for Additional Information - Relief Request Application P-1, Inservice Testing (IST)7 December 2022Response to Request for Additional Information - Relief Request Application P-1, Inservice Testing (IST)Probabilistic Risk Assessment
IR 05000445/20224207 December 2022Security Baseline Inspection Report Cover Letter 05000445/2022420 and 05000446/2022420Affidavit
CP-202200454, (Cpnpp), Reply to a Notice of Violation Transmitted Via NRC Letter from Gregory Werner to Ken Peters Dated 11/01/2022, Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Inspection Report 05000445/2022003 .1 December 2022(Cpnpp), Reply to a Notice of Violation Transmitted Via NRC Letter from Gregory Werner to Ken Peters Dated 11/01/2022, Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Inspection Report 05000445/2022003 .Safe Shutdown
ML22298A0161 December 2022License Renewal Application Online Reference Portal
ML22329A03329 November 2022Notification of NRC Initial Operator Licensing Examination 05000445/2023301 and 05000446/2023301
ML22297A00723 November 2022Notice of Acceptance and Opportunity for Hearing Letter
CP-202200380, (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications21 November 2022(CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical SpecificationsBoric Acid
Shutdown Margin
Anticipated operational occurrence
Hydrostatic
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Fuel cladding
Power change
CP-202200355, Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-00221 November 2022Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002Reactor Vessel Water Level
Loop seal
Stroke time
Anticipated operational occurrence
Hydrostatic
Coatings
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Fuel cladding
CP-202200450, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters16 November 2022(CPNPP) - Registration of Dry Spent Fuel Storage Canisters
ML22319A07315 November 2022Review of the Fall 2021 Steam Generator Tube Inspection Report
CP-202200435, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters8 November 2022(Cpnpp), Registration of Dry Spent Fuel Storage Canisters
CP-202200419, (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report3 November 2022(CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day ReportNondestructive Examination
ML22299A0561 November 2022Integrated Inspection Report 05000445/2022003 and 05000446/2022003 and Notice of ViolationSafe Shutdown
Time of Discovery
High winds
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Severe Accident Management Guideline
Earthquake
Maintenance Rule Program
Control of Heavy Loads
Fire Protection Program
IR 05000445/20220031 November 2022Integrated Inspection Report 05000445/2022003 and 05000446/2022003 and Notice of ViolationSafe Shutdown
Time of Discovery
High winds
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Operating Basis Earthquake
Functionality Assessment
Significance Determination Process
Operability Determination
Severe Accident Management Guideline
Maintenance Rule Program
Control of Heavy Loads
Fire Protection Program
Siren
ML22285A07524 October 2022LRA - Receipt and Availability LetterLicense Renewal
CP-202200358, (CPNPP) - Transmittal of Revised Emergency Plan (Revision 46)14 September 2022(CPNPP) - Transmittal of Revised Emergency Plan (Revision 46)Health Physics Network
Fukushima Dai-Ichi
CP-202200357, (CPNPP) Unit 2 - Response to Request for Additional Information, Fall 2021 (2RF19) Steam Generator Tube Inspection Report14 September 2022(CPNPP) Unit 2 - Response to Request for Additional Information, Fall 2021 (2RF19) Steam Generator Tube Inspection Report
CP-202200246, Evacuation Time Estimate Analysis25 August 2022Evacuation Time Estimate AnalysisPandemic
Coronavirus
COVID19
ML22192A00722 August 2022Issuance of Amendment Nos. 183 and 183 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2Safe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Large early release frequency
Flooding Focused Evaluation
Maintenance Rule Program
Offsite Circuit
IR 05000445/202200522 August 2022Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022005 and 05000446/2022005)Fitness for Duty
Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
COVID-19
ML22228A09417 August 2022Notification of Inspection (NRC Inspection Report 05000445/2022004 and 05000446/2022004) and Request for Information
CP-202200306, (CPNPP) - Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 22 (1RF22)11 August 2022(CPNPP) - Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 22 (1RF22)
IR 05000445/20224039 August 2022NRC Security Inspection Report 05000445/2022403 and 05000446/2022403 (Full Report)
IR 05000445/20220025 August 20222nd Quarter 2022 Integrated Inspection Report 05000445/2022002 and 05000446/2022002Safe Shutdown
Boric Acid
High Radiation Area
Non-Destructive Examination
Fire Barrier
Stroke time
Internal Flooding
Enforcement Discretion
Nondestructive Examination
Temporary Modification
VT-2
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Nonconservative Technical Specifications
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
ML22208A15829 July 2022Correction to Issuance of Amendment Nos. 156 and 156 Relocation of Surveillance Frequencies from the Technical Specifications to a Licensee-Controlled DocumentSurveillance Frequency Control Program
CP-202200273, Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative20 July 2022Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF InitiativeSurveillance Frequency Control Program
CP-202200276, (CPNPP) - Relief Request Application P-1, Inservice Testing (IST)20 July 2022(CPNPP) - Relief Request Application P-1, Inservice Testing (IST)Safe Shutdown
Probabilistic Risk Assessment
ML22194A05914 July 2022Correction to Amendment Nos. 182 and 182 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections
CP-202200247, (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 01730 June 2022(CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 017
ML22151A18422 June 2022License Renewal Application May 26, 2022 Pre-submittal Public Meeting SummaryAging Management
License Renewal
Subsequent License Renewal
CP-202200244, (CPNPP) - Transmittal of Revised Emergency Plan (Revision 45)20 June 2022(CPNPP) - Transmittal of Revised Emergency Plan (Revision 45)Health Physics Network
Fukushima Dai-Ichi
ML22152A04110 June 2022Summary of Regulatory Audit License Amendment Request to Revise TS to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4bHigh winds
Internal Flooding
Probabilistic Risk Assessment
Open Phase Condition
CP-202200219, (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 202618 May 2022(Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 2026
CP-202200003, (CPNPP) - Annual Report of Changes in Peak Cladding Temperature16 May 2022(CPNPP) - Annual Report of Changes in Peak Cladding Temperature
ML22129A07216 May 2022Review of Quality Assurance Program ChangesOffsite Dose Calculation Manual
Process Control Program
Grace period
CP-202200205, (CPNPP) - License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Rtstf.12 May 2022(CPNPP) - License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Rtstf.
CP-202200200, (CPNPP) Unit 2 Refueling Outage 19 (2RF19) Steam Generator 180 Day Report5 May 2022(CPNPP) Unit 2 Refueling Outage 19 (2RF19) Steam Generator 180 Day ReportNondestructive Examination
ML22124A3045 May 2022Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000445/2022003 and 05000446/2022003) and Request for InformationUltimate heat sink
Coatings
Nondestructive Examination
Aging Management
Frazil ice
CP-202200196, Report of Changes to the Physical Security Plan (Revision 14)4 May 2022Report of Changes to the Physical Security Plan (Revision 14)
CP-202200183, (CPNPP) - 2021 Annual Radiological Environmental Operating Report28 April 2022(CPNPP) - 2021 Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Commercial Grade Dedication
Annual Radiological Environmental Operating Report
CP-202200181, (CPNPP) - 2021 Annual Environmental Operating Report (Non-Radiological)27 April 2022(CPNPP) - 2021 Annual Environmental Operating Report (Non-Radiological)
IR 05000445/202200126 April 2022Integrated Inspection Report 05000445/2022001 and 05000446/2022001Ultimate heat sink
Past operability
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Fire Protection Program
Power change
CP-202200144, (CPNPP) - Core Operating Limits Report (Colr), Unit 1 Cycle 23, (ERX-22-001, Revision 0)25 April 2022(CPNPP) - Core Operating Limits Report (Colr), Unit 1 Cycle 23, (ERX-22-001, Revision 0)Shutdown Margin
IR 05000445/202240225 April 2022Security Baseline Inspection Report 05000445/2022402 and 05000446/2022402
CP-202200145, (CPNPP) - 2021 Annual Radioactive Effluent Release Report18 April 2022(CPNPP) - 2021 Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
CP-202200122, (CPNPP) - Property Damage Insurance31 March 2022(CPNPP) - Property Damage Insurance
CP-202200123, (CPNPP) - License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times.29 March 2022(CPNPP) - License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times.High winds
Large early release frequency
CP-202200128, Core Operating Limits Report Unit 2 Cycle 20, (ERX-21-001, Revision 1)28 March 2022Core Operating Limits Report Unit 2 Cycle 20, (ERX-21-001, Revision 1)Shutdown Margin
ML22077A84124 March 2022Proposed Alternative SNB-3 for the Snubber Inservice Program Third Interval ExtensionIncorporated by reference
IR 05000445/20210062 March 2022Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021006 and 05000446/2021006)Fitness for Duty
Commercial Grade Dedication
Cyber Security
Exemption Request
Coronavirus
ML21321A34924 February 2022Issuance of Amendment Nos. 182 and 182 to Revise Technical Specifications to Adopt TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube InspectionsPost Accident Monitoring
Nondestructive Examination
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
CP-202200006, (CPNPP) - Second Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended.17 February 2022(CPNPP) - Second Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended.Safe Shutdown
High winds
High Radiation Area
Ultimate heat sink
Fire Barrier
Slow transfer
Anticipated operational occurrence
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Fire impairment
FLEX
Fukushima Dai-Ichi
Thermoset
Surveillance Frequency Control Program
Open Phase Condition
Large early release frequency
Frazil ice
Earthquake
Maintenance Rule Program
Power Operated Valves
Turbine Missile
Fuel cladding
Offsite Circuit
Fire Protection Program
Power change
CP-202200075, Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections15 February 2022Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections
ML22041A00511 February 2022Transmittal of Dam Inspection Report (EPID L-2017-LNS-0015) (Public)Safe Shutdown
CP-202200068, (CPNPP) - Guarantees of Payment of Deferred Premiums10 February 2022(CPNPP) - Guarantees of Payment of Deferred Premiums
IR 05000445/20200117 February 2022Amended - Comanche Peak Nuclear Power Plant - Triennial Fire Protection Inspection Report 05000445/2020011 and 05000446/2020011 and Notice of ViolationSafe Shutdown
Probabilistic Risk Assessment
Fire impairment
Temporary Modification
Arc flash
COVID19
Fire Protection Program
ML22038A1661 February 2022(CPNPP) - Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 111
CP-202200041, (CPNPP) - Supplement to ASME OM Inservice Test Program Relief Request SNB-3, Snubber Inservice Program Third Interval Extension27 January 2022(CPNPP) - Supplement to ASME OM Inservice Test Program Relief Request SNB-3, Snubber Inservice Program Third Interval Extension
CP-202200035, Second Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections25 January 2022Second Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube InspectionsPost Accident Monitoring
Nondestructive Examination
Pressure and Temperature Limits Report
IR 05000445/202100425 January 2022Integrated Inspection Report 05000445/2021004 and 05000446/2021004Safe Shutdown
Boric Acid
High Radiation Area
Commercial Grade Dedication
Weld Overlay
Post Accident Monitoring
Internal Flooding
Nondestructive Examination
Temporary Modification
Cyber Security
Functionality Assessment
Locked High Radiation Area
FLEX
Operability Determination
Time Critical Operator Action
Liquid penetrant
Fire Protection Program
Substantial potential for an overexposure
Overexposure
IR 05000445/202101213 January 2022TI-194 Report 05000445/2021012 and 05000446/2021012Probabilistic Risk Assessment
Operator Manual Action
Open Phase Condition
CP-202100751, (CPNPP) - ASME OM Inservice Test Program Relief Request SNB-3, Snubber Inservice Program Third Internal Extension4 January 2022(CPNPP) - ASME OM Inservice Test Program Relief Request SNB-3, Snubber Inservice Program Third Internal Extension
IR 05000445/202140515 December 2021Security Baseline Inspection Report 05000445/2021405 and 05000446/2021405
IR 05000445/20214039 December 2021Powerplant, Units 1 and 2 - Security Baseline Inspection Report 05000445/2021403 and 05000446/2021403Coronavirus
COVID-19
ML21322A1037 December 2021Proposed Alternative for the Continued Use of a Risk-Informed Process for the Selection of Class 1 and 2 Piping Welds for Inservice InspectionInternal Flooding
Probabilistic Risk Assessment
Large early release frequency
Exemption Request
DM weld
IR 05000445/20210033 November 2021Integrated Inspection Report 05000445/2021003 and 05000446/2021003Internal Flooding
Temporary Modification
Functionality Assessment
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
CP-202100715, Report of Changes to the Physical Security Plan (Revision 13)2 November 2021Report of Changes to the Physical Security Plan (Revision 13)
CP-202100694, (CPNPP) - NRC Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections25 October 2021(CPNPP) - NRC Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube InspectionsPost Accident Monitoring
Nondestructive Examination
Pressure and Temperature Limits Report
IR 05000445/202130119 October 2021NRC Examination Report 05000445/2021301 and 05000446/2021301Pandemic
COVID-19
CP-202100682, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 20, (ERX-21-001, Revision 0)19 October 2021(CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 20, (ERX-21-001, Revision 0)Shutdown Margin
IR 05000445/20210107 October 2021Biennial Problem Identification and Resolution Inspection Report 05000445/2021010 and 05000446/2021010Condition Adverse to Quality
Pandemic
Coronavirus
ML21285A03923 September 2021CP-2021-08-Post Exam Comments
ML21264A02921 September 2021NRC Initial Operator Licensing Examination Approval 05000445/2021301 and 05000446/2021301
IR 05000445/20214019 September 2021Security Baseline Inspection Report 05000445/2021401 and 05000446/2021401Fitness for Duty
Coronavirus
COVID-19
IR 05000445/20210051 September 2021Mid-Cycle Inspection Plan Transmittal Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021005 and 05000446/2021005)Fitness for Duty
Operator Manual Action
Cyber Security
Open Phase Condition
Exemption Request
Power-Operated Valves
COVID-19
CP-202100575, (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections31 August 2021(CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube InspectionsPost Accident Monitoring
Nondestructive Examination
Pressure and Temperature Limits Report
ML21236A33325 August 2021CP2021301-Revised Exam Approval Ltr
CP-202100570, (CPNPP) - Initial Operator Licensing Examination24 August 2021(CPNPP) - Initial Operator Licensing Examination
CP-202100550, Quality Assurance Program Internal Audit Frequency24 August 2021Quality Assurance Program Internal Audit FrequencyOffsite Dose Calculation Manual
Process Control Program
Grace period
IR 05000445/202140219 August 2021Security Baseline Inspection Report 05000445/2021402 and 05000446/2021402Fitness for Duty
Coronavirus
COVID-19
CP-202100559, (CPNPP) - Initial Operator Licensing Examination17 August 2021(CPNPP) - Initial Operator Licensing Examination
IR 05000445/202100210 August 2021Integrated Inspection Report 05000445/2021002 and 05000446/2021002Enforcement Discretion
Functionality Assessment
Significance Determination Process
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
ML21215A5794 August 2021NRC Initial Operator Licensing Examination Approval 05000445/2021301 and 05000446/2021301
CP-202100251, (CPNPP) - Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections27 July 2021(CPNPP) - Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube InspectionsPost Accident Monitoring
Nondestructive Examination
Pressure and Temperature Limits Report
CP-202100394, Supplement to License Amendment Request (LAR) 20-00613 July 2021Supplement to License Amendment Request (LAR) 20-006High winds
Anticipated operational occurrence
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Fuel cladding
Offsite Circuit
IR 05000445/202100123 June 2021Revised Report - Comanche Peak Nuclear Plant, Units 1 and 2 - Integrated Inspection Report 05000445/2021001; 05000446/2021001 and Independent Spent Fuel Storage Inspection 07200074/2021001High winds
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Power change
ML21166A33822 June 2021Supplemental Information Needed for Acceptance of Requested Licensing Action LAR to Adopt TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bProbabilistic Risk Assessment
Offsite Circuit
IR 05000445/202140417 June 2021Material Control and Accounting Program (Public) Inspection Report 05000445/2021404 05000446/2021404Affidavit
ML21132A0899 June 2021Issuance of Amendment Nos. 181 and 181 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-567, Rev. 1, Add Containment Sump TS to Address GSI - 191 IssuesSurveillance Frequency Control Program
CP-202100256, Reply to a Notice of Violation3 June 2021Reply to a Notice of Violation
ML21195A19827 May 2021Radiological Emergency Preparedness Program (Repp) Final Report for the Virtual Medical Services DrillCoronavirus
ML21133A00319 May 2021Temporary Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection A.7 (EPID L-2021-LLE-0024 (Covid 19))Exemption Request
Pandemic
Coronavirus
COVID-19
ML21061A21719 May 2021Issuance of Amendment Nos. 180 and 180 to Authorize Revision of Certain Emergency Action Levels of the Emergency PlanSafe Shutdown
Ultimate heat sink
Operating Basis Earthquake
Earthquake
ML21119A34917 May 2021Temporary Exemption from Requirements of 10 CFR Part 50, Appendix E, Sections IV.F.2.B and IV.F.2.C (EPID L-2021-LLE-0028 (COVID-19))Pandemic
Coronavirus
COVID-19
CP-202100241, (CPNPP) - Supplemental Information Regarding Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section VI, Subsection A.7 Regarding Annual Force-on-Force (FOF) Exercises (COVID-19) - Cover Letter12 May 2021(CPNPP) - Supplemental Information Regarding Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section VI, Subsection A.7 Regarding Annual Force-on-Force (FOF) Exercises (COVID-19) - Cover LetterExemption Request
Coronavirus
ML21131A09511 May 2021CP2021001-RP-JE, Comanche Peak Nuclear Power Plant, Units 1 and 2 - Integrated Inspection Report 05000445/2021001 and 05000446/2021001High winds
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Coronavirus
Fire Protection Program
Power change
CP-202100065, Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b11 May 2021Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High winds
High Radiation Area
Ultimate heat sink
Fire Barrier
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Large early release frequency
Frazil ice
Earthquake
Power Operated Valves
Turbine Missile
Offsite Circuit
Fire Protection Program
Power change
IR 05000445/20210116 May 2021Design Basis Assurance Inspection (Teams) Inspection Report 05000445/2021011 and 05000446/2021011 and Notice of Violation
ML21125A4336 May 2021Supplemental Information Needed for Acceptance of Requested Licensing Action Temporary Exemption from Annual FOF Exercise Requirement of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection A.7 (Public)Exemption Request
CP-202100224, (Cpnpp), 2020 Annual Environmental Operating Report (Non-Radiological)29 April 2021(Cpnpp), 2020 Annual Environmental Operating Report (Non-Radiological)
CP-202100225, Plari.T (CPNPP) - 2020 Annual Radiological Environmental Operating Report29 April 2021Plari.T (CPNPP) - 2020 Annual Radiological Environmental Operating ReportAnnual Radiological Environmental Operating Report
CP-202100152, (CPNPP) - 2020 Annual Radioactive Effluent Release Report28 April 2021(CPNPP) - 2020 Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
CP-202100216, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters26 April 2021(CPNPP) - Registration of Dry Spent Fuel Storage Canisters
ML21103A03923 April 2021Issuance of Amendment Nos. 179 and 179 the Adoption of Technical Specifications Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition (EPID L-2020-0147)Shutdown Margin
Anticipated operational occurrence
ML21111A01122 April 2021Correction to Amendment Nos. 168 and 168 Adoption of TSTF-545, Rev. 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing
CP-202100202, One-Time Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, IV.F.2.b and IV.F.2.c21 April 2021One-Time Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, IV.F.2.b and IV.F.2.cExemption Request
Pandemic
Coronavirus
COVID-19
CP-202100201, Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section VI, Subsection A.7 and Subsection C.3.(L)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID-19 PHE16 April 2021Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section VI, Subsection A.7 and Subsection C.3.(L)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID-19 PHEExemption Request
Pandemic
Coronavirus
CP-202100204, Response to RIS 2000-11, NRC Emergency Telecommunications System15 April 2021Response to RIS 2000-11, NRC Emergency Telecommunications SystemHealth Physics Network
ML21103A39813 April 2021CP Security Inspection Information Request 2021403
CP-202100156, Registration of Dry Spent Fuel Storage Canisters7 April 2021Registration of Dry Spent Fuel Storage Canisters
CP-202100154, (CPNPP) - Property Damage Insurance31 March 2021(CPNPP) - Property Damage Insurance
CP-202100155, (CPNPP) - Decommissioning Report31 March 2021(CPNPP) - Decommissioning ReportDecommissioning Funding Plan
Authorized possession limits
Fuel cladding
Fire Watch
CP-202100143, (CPNPP) - Relief Request 1A4-3 for Continued Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and 2 Piping Welds for Unit 1 Inservice Inspection30 March 2021(CPNPP) - Relief Request 1A4-3 for Continued Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and 2 Piping Welds for Unit 1 Inservice InspectionInternal Flooding
Probabilistic Risk Assessment
Large early release frequency