Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
CP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 1 | 31 January 2024 | License Renewal Application Revision 0 - Supplement 3, Revision 1 | |
CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) | 29 January 2024 | (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) | |
ML24024A210 | 29 January 2024 | Summary of Regulatory Audit Regarding a License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | |
IR 05000445/2023004 | 29 January 2024 | Integrated Inspection Report 05000445/2023004 and 05000446/2023004 | |
ML24025A005 | 25 January 2024 | Review of the Spring 2023 Steam Generator Tube Inspection Report | |
ML24023A024 | 24 January 2024 | Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology | |
ML24018A107 | 18 January 2024 | Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information | Commercial Grade Dedication |
ML23319A387 | 20 December 2023 | Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology | Loop seal Anticipated operational occurrence Hydrostatic Coatings Pressure and Temperature Limits Report |
ML23159A208 | 20 December 2023 | Request for Withholding Information from Public Disclosure | Affidavit |
ML23348A239 | 19 December 2023 | Nonacceptance of License Amendment Request to Relocate Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual | Fuel cladding |
ML23333A087 | 13 December 2023 | Transmittal of Dam Safety Inspection Report - Public | Safe Shutdown |
CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 | 13 December 2023 | (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 | Safe Shutdown High winds Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Incorporated by reference FLEX Fukushima Dai-Ichi Open Phase Condition Large early release frequency Seismic Walkdown Report |
CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation | 12 December 2023 | (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation | Post Accident Monitoring |
ML23313A073 | 6 December 2023 | Issuance of Amendment Nos. 184 and 184 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Rev. 1, Improved Roac and CAOC Fq Surveillance Technical Specifications | Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report Surveillance Frequency Control Program |
CP-202300494, License Renewal Application Revision 0, Supplement 3 | 6 December 2023 | License Renewal Application Revision 0, Supplement 3 | Boric Acid Finite Element Analysis Aging Management License Renewal |
IR 05000445/2023402 | 30 November 2023 | NRC Security Inspection Report 05000445/2023402 and 05000446/2023402 | Affidavit |
ML23291A438 | 30 November 2023 | Notice of Availability of the Draft Plant-Specific Supplement 60, to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Comanche Peak Nuclear Power Plant, Unit Numbers 1 and 2, License Renewal Applica | License Renewal Subsequent License Renewal |
ML23325A018 | 30 November 2023 | Schedule Revision for the License Renewal Application Review | Aging Management License Renewal |
CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation | 20 November 2023 | License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation | Shutdown Margin Probabilistic Risk Assessment |
ML23308A003 | 17 November 2023 | Letter to R. Nelson, Executive Director; Achp; Re., Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23308A002 | 17 November 2023 | Letter to M. Wolfe, Executive Director; Shpo; Re., Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A301 | 13 November 2023 | Letter to S. Yahola, Mekko, Kialegee Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23306A030 | 13 November 2023 | Letter to J. Cernek, Chairman; Coushatta Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A286 | 13 November 2023 | Letter to J. Bunch, Chief, United Keetoowah Band of Cherokee Indians Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A279 | 13 November 2023 | Letter to B. Gonzalez, Chairman, Caddo Nation Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A284 | 13 November 2023 | Letter to D. Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A283 | 13 November 2023 | Letter to D. Dotson, President, Delaware Nation Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A281 | 13 November 2023 | Letter to C. Hoskin, Principal Chief, Cherokee Nation; Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A289 | 13 November 2023 | Letter to L. Spottedbird, Chairman, Kiowa Indian Tribe Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A297 | 13 November 2023 | Letter to R. Martin, President, Tonkawa Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A285 | 13 November 2023 | Letter to E. Martinez, President, Mescalero Apache Tribe Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A287 | 13 November 2023 | Letter to J. Garza, Chairman, Kickapoo Traditional Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A290 | 13 November 2023 | Letter to M. Pierite, Chairman, Tunica Biloxi Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A288 | 13 November 2023 | Letter to L. Johnson, Chief, Seminole Nation of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A302 | 13 November 2023 | Letter to T. Parton, President, Wichita and Affiliated Tribes Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A298 | 13 November 2023 | Letter to R. Morrow, Town King, Thlopthlocco Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A296 | 13 November 2023 | Letter to M. Woommavovah, Chairman, Comanche Nation Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A300 | 13 November 2023 | Letter to R. Sylestine, Chairman, Alabama-Coushatta Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A282 | 13 November 2023 | Letter to D. Cooper, Chairman, Apache Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23317A303 | 13 November 2023 | Letter to W. Yargee, Chief, Alabama-Quassarte Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement | License Renewal |
ML23311A208 | 9 November 2023 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV | |
ML23360A631 | 26 October 2023 | FEMA, Submittal of Radiological Emergency Preparedness Final Report for the Comanche Peak Nuclear Power Plant Medical Services Drill Evaluated on August 23, 2023 | |
CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements | 12 October 2023 | Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements | |
CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 | 4 October 2023 | Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 | Boric Acid Fire Barrier Coatings Aging Management License Renewal Subsequent License Renewal Through-Wall Leak Fire Protection Program |
ML23237B422 | 28 September 2023 | Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments | |
ML23263A024 | 21 September 2023 | Revision of Schedule for the Environmental Review of the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application | License Renewal |
CP-202300442, (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program | 15 September 2023 | (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program | Incorporated by reference |
L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 12 September 2023 | Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | |
CP-202300391, (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule | 24 August 2023 | (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule | Incorporated by reference Exemption Request |
IR 05000445/2023005 | 23 August 2023 | Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2023005 and 05000446/2023005)- Mid Cycle Letter 2023 | |
IR 05000445/2023301 | 21 August 2023 | NRC Examination Report 05000445/2023301 and 05000446/2023301 | |
CP-202300411, (Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20) | 17 August 2023 | (Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20) | |
CP-202300361, (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report | 17 August 2023 | (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report | Nondestructive Examination |
CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 | 15 August 2023 | 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 | Operator Manual Action |
ML23172A146 | 9 August 2023 | Aging Management Audit Report - Comanche Peak Units 1 and 2 - License Renewal Application | Safe Shutdown Boric Acid Fire Barrier Anticipated operational occurrence Weld Overlay Hydrostatic Coatings Nondestructive Examination Aging Management Pressure and Temperature Limits Report Moisture barrier License Renewal Subsequent License Renewal Control of Heavy Loads Through-Wall Leak Through Wall Leak Fire Protection Program Dissimilar Metal Weld DM weld Flow Induced Vibration Power Uprate Stretch Power Uprate |
L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 7 August 2023 | Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | Cyber Security Safeguards Contingency Plan Fire Protection Program |
ML23213A216 | 2 August 2023 | Vistra Operations Company, LLC Notification of License Renewal Inspection and Request for Information | Aging Management |
CP-202300358, (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112 | 1 August 2023 | (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112 | |
CP-202300322, Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 3 | 27 July 2023 | Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 3 | Boric Acid Fire Barrier Coatings Nondestructive Examination Aging Management Moisture barrier License Renewal Subsequent License Renewal Through-Wall Leak Fire Protection Program |
IR 05000445/2023011 | 20 July 2023 | Fire Protection Team Inspection Report 05000445/2023011 and 05000446/2023011 | Safe Shutdown Fire Barrier Fire impairment Operability Determination Fire Protection Program |
CP-202300348, (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48) | 18 July 2023 | (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48) | Health Physics Network Fukushima Dai-Ichi |
IR 05000445/2023002 | 14 July 2023 | Integrated Inspection Report 05000445/2023002 and 05000446/2023002 | High Radiation Area Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination Through Wall Leak Fire Protection Program |
CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 | 12 July 2023 | Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 | Safe Shutdown Earthquake Weld Overlay Hydrostatic Operating Basis Earthquake Finite Element Analysis Aging Management License Renewal Earthquake Pressure Boundary Leakage Pressure boundary leak Dissimilar Metal Weld Stretch Power Uprate |
ML23226A234 | 22 June 2023 | Post Exam Comments and Analysis with Letter | |
CP-202300262, Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 2 | 20 June 2023 | Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 2 | Boric Acid Fire Barrier Aging Management Fire Protection Program |
CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements | 15 June 2023 | Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements | Safe Shutdown |
ML23164A223 | 13 June 2023 | Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 1 | Boric Acid Aging Management |
CP-202300248, Response to Request for Additional Information Regarding License Renewal Application - Set 1 | 13 June 2023 | Response to Request for Additional Information Regarding License Renewal Application - Set 1 | |
ML23156A230 | 6 June 2023 | NRC Initial Operator Licensing Examination Approval 05000445/2023301 and 05000446/2023301 | |
CP-202300209, Response to Request for Additional Information - License Renewal Application Environmental Review | 6 June 2023 | Response to Request for Additional Information - License Renewal Application Environmental Review | |
ML23136B296 | 31 May 2023 | Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request Regarding General Design Criteria 5 and Regulatory Guide 1.81 | |
CP-202300207, Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-05 | 25 May 2023 | Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-05 | |
ML23132A254 | 23 May 2023 | Supplemental Information Needed for Acceptance of Requested Licensing Action LAR to Adopt 10 CFR 50.69,Risk-Informed Categorization & Treatment of Structures,Systems & Components for Nuclear Power Reactors EPID L-2023-LLA-0057 | Probabilistic Risk Assessment Large early release frequency |
ML23132A157 | 18 May 2023 | Summary of the License Renewal Environmental Audit (EPID Number: L-2022-LNE-004) (Docket Numbers 50-445 and 50-446) | |
ML23068A056 | 9 May 2023 | Request for Additional Information - Comanche Peak License Renewal Application Environmental Review | Safe Shutdown |
CP-202300182, Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application | 8 May 2023 | Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application | Safe Shutdown |
CP-202300201, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0) | 4 May 2023 | (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0) | Shutdown Margin |
ML23121A220 | 4 May 2023 | Proposed Alternative P-1 Regarding Safeguard Building Sump Pumps | Incorporated by reference |
CP-202300159, (Cpnpp), 2022 Annual Radiological Effluent Release Report | 27 April 2023 | (Cpnpp), 2022 Annual Radiological Effluent Release Report | Annual Radioactive Effluent Release Report Annual Radiological Effluent Release Report |
CP-202300160, (Cpnpp), 2022 Annual Radiological Environmental Operating Report | 27 April 2023 | (Cpnpp), 2022 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
CP-202300165, License Renewal Application Revision 0 - Supplement 2 | 24 April 2023 | License Renewal Application Revision 0 - Supplement 2 | Boric Acid Fire Barrier Safe Shutdown Earthquake Hydrostatic Coatings Finite Element Analysis Aging Management Moisture barrier License Renewal Subsequent License Renewal Earthquake EVT-1 Through-Wall Leak Through Wall Leak Fire Protection Program Dissimilar Metal Weld Stretch Power Uprate |
CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 20 April 2023 | ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | |
CP-202300096, License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements | 20 April 2023 | License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements | Safe Shutdown Operator Manual Action Surveillance Frequency Control Program |
CP-202300175, Submittal of 2022 Annual Environmental Operating Report (Non-Radiological) | 20 April 2023 | Submittal of 2022 Annual Environmental Operating Report (Non-Radiological) | |
CP-202300140, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-001 | 19 April 2023 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-001 | Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment Fukushima Dai-Ichi Large early release frequency |
ML23083B976 | 19 April 2023 | Initiate Section 106 Consultation, Request for Comments on Scope of the Comanche Peak Nuclear Power Plant, Units 1, 2 License Renewal Environmental Review | License Renewal |
ML23083B373 | 18 April 2023 | Ltr to Mark Wolfe, Shpo, Re, Initiate Section 106 Consultation and Request for Comments on Scope of the Comanche Peak NPP, Units 1, 2 License Renewal Environmental Review | License Renewal |
ML23082A120 | 17 April 2023 | Summary of the License Renewal Severe Accident Mitigation Alternatives Audit (EPID Number: L-2022-LNE-0004) (Docket Numbers: 50-445 and 50-446) | |
CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 14 April 2023 | ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | Safe Shutdown Probabilistic Risk Assessment Cyber Security Decommissioning Funding Plan Large early release frequency Safeguards Contingency Plan License Renewal Fire Protection Program |
ML23108A219 | 13 April 2023 | Relief Request RV-1 - Extension Request for Thermal Relief Valves for Comanche Peak Units 1 & 2 | Safe Shutdown Mission time |
IR 05000445/2023001 | 13 April 2023 | Integrated Inspection Report 05000445/2023001 and 05000446/2023001 | Internal Flooding Enforcement Discretion VT-2 Functionality Assessment Operability Determination Maintenance Rule Program Through Wall Leak Fire Protection Program Power change |
ML23108A221 | 13 April 2023 | Application for Extension Relief Request RV-1 for Thermal Relief Valves | Safe Shutdown Mission time |
ML23068A073 | 13 April 2023 | Requests for Confirmation of Information for the Environmental Review of the Comanche Peak Nuclear Power Plant, Units 1 and 2, Licensed Renewal Application (EPID Number: L-2022-LNE-0004) (Docket Numbers 50-445 and 50-446) | Safe Shutdown License Renewal |
ML23097A139 | 10 April 2023 | Ltr. to Marshall Pierite, Chairman, Tunica-Biloxi Tribe of Louisiana, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23097A150 | 10 April 2023 | Ltr. to Chuck Hoskins, Principal Chief, Cherokee Nation, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23097A149 | 10 April 2023 | Ltr. to Mark Woommavovah, Chairman, Comanche Nation, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23097A141 | 10 April 2023 | Ltr. to Ryan Morrow, Town King, Thlopthlocco Tribal Town, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23097A147 | 10 April 2023 | Ltr. to Deborah Dotson, President, Delaware Nation, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23097A148 | 10 April 2023 | Ltr. to Jonathan Cernek, Chairman, Coushatta Tribe of Louisiana, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23097A153 | 10 April 2023 | Ltr. to Wilson Yargee, Chief, Alabama-Quassarte Tribal Town Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23097A142 | 10 April 2023 | Ltr. to Lewis Johnson, Chief, Seminole Nation of Oklahoma, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23097A146 | 10 April 2023 | Ltr. to Brian Givens, Mekko, Kialegee Tribal Town, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23097A143 | 10 April 2023 | Ltr. to Eddie Martinez, President, Mescalero Apache Tribe, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23097A144 | 10 April 2023 | Ltr. to Lawrence Spottedbird, Chairman, Kiowa Indian Tribe, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23097A138 | 10 April 2023 | Ltr. to Joe Bunch, Chief, United Keetoowah Band of Cherokee Indians, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23097A137 | 10 April 2023 | Ltr. to Terri Parton, President, Wichita and Affiliated Tribes, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23097A140 | 10 April 2023 | Ltr. to Russell Martin, President, Tonkawa Tribe of Oklahoma, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23088A185 | 10 April 2023 | Ltrs to Donnis Battise, Mikko Choba, and Millie Thompson William, Mikko Istimatokia, Alabama-Coushatta Tribe of Tx, Re, Request for Comments Concerning the Er of CPNPP, Units 1, 2, License Renewal | License Renewal |
ML23097A145 | 10 April 2023 | Ltr. to Juan Garza, Jr., Chairman, Kickapoo Tribe of Oklahoma, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23097A151 | 10 April 2023 | Ltr. to Bobby Gonzalez, Chairman, Caddo Nation, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23097A152 | 10 April 2023 | Ltr. to Durcel Cooper, Chairman, Apache Tribe of Oklahoma, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
ML23097A155 | 10 April 2023 | Ltr. to Darwin Kaskaske, Chairperson, Kickapoo Tribe of Oklahoma, Re., Request for Comments Concerning the Environmental Review of Comanche Peak, Units 1 and 2, License Renewal | License Renewal |
CP-202300135, License Renewal Application Revision 0 - Supplement 1 | 6 April 2023 | License Renewal Application Revision 0 - Supplement 1 | Safe Shutdown Boric Acid Fire Barrier Coatings Aging Management Foreign Material Exclusion Moisture barrier License Renewal Subsequent License Renewal Fire Protection Program Flow Induced Vibration |
CP-202300139, (CPNPP) - Property Damage Insurance | 30 March 2023 | (CPNPP) - Property Damage Insurance | |
CP-202300144, (CPNPP) - Decommissioning Report | 30 March 2023 | (CPNPP) - Decommissioning Report | Decommissioning Funding Plan Authorized possession limits |
IR 05000445/2023010 | 24 March 2023 | Biennial Problem Identification and Resolution Inspection Report 05000445/2023010 and 05000446/2023010 | Safe Shutdown Boric Acid Probabilistic Risk Assessment Emergency Lighting Condition Adverse to Quality FLEX Significance Determination Process Operability Determination Maintenance Rule Program |
CP-202300098, (Cpnpp), Annual Report of Changes in Peak Cladding Temperature | 16 March 2023 | (Cpnpp), Annual Report of Changes in Peak Cladding Temperature | |
ML23068A378 | 9 March 2023 | Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000445/2023011 and 05000446/2023011) and Request for Information | Safe Shutdown Fitness for Duty Commercial Grade Dedication Hydrostatic Probabilistic Risk Assessment Temporary Modification Aging Management Job Performance Measure Fire Protection Program |
ML23068A045 | 8 March 2023 | Fws to NRC, Endangered Species Act Concurrence Letter for Certain Species That Are Not Likely to Be Adversely Affected by Comanche Peak License Renewal | |
IR 05000445/2022006 | 1 March 2023 | Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022006 and 05000446/2022006) | Fitness for Duty Commercial Grade Dedication License Renewal Exemption Request COVID-19 |
ML23044A326 | 14 February 2023 | License Renewal Environmental Site Audit Plan Regarding the Comanche Peak Nuclear Power Plant, Units 1 and 2, License Renewal Application | Safe Shutdown Zebra Mussel License Renewal Earthquake Environmental Justice Power Uprate |
ML23023A001 | 2 February 2023 | Request for Withholding Information from Public Disclosure | |
ML23019A219 | 1 February 2023 | License Renewal Severe Accident Mitigation Alternatives Audit Plan Regarding the Comanche Peak Nuclear Power Plant, Unit Nos. 1 & 2, Licenses Renewal Application (EPID No. L-2022-LNE-0004) (Docket Nos 50-445 and 50-446) | High winds Internal Flooding Probabilistic Risk Assessment Large early release frequency Fatality |
IR 05000445/2022004 | 26 January 2023 | Integrated Inspection Report 05000445/2022004 and 05000446/2022004 | Offsite Dose Calculation Manual Fire Barrier Commercial Grade Dedication Temporary Modification Functionality Assessment Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Large early release frequency Operability Determination Through Wall Leak Fire Protection Program Grace period Substantial potential for an overexposure Operability Assessment Siren Overexposure |
ML23025A353 | 26 January 2023 | Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System | Open Phase Condition |
ML23023A113 | 24 January 2023 | Review of the Spring 2022 Steam Generator Tube Inspection Report (Edid L-2022-LRO-0144) | |
IR 05000445/2022010 | 23 January 2023 | TI-194 Report 05000445/2022010 and 05000446/2022010 | Operator Manual Action Open Phase Condition |
ML22355A043 | 4 January 2023 | Aging Management Audit Plan Regarding the License Renewal Application Review - Supplement | Aging Management |
IR 05000445/2022401 | 19 December 2022 | Cyber Security Inspection Report 05000445/2022401 and 05000446/2022401 (Cover Letter Only) | Cyber Security Affidavit |
ML22346A086 | 13 December 2022 | Acknowledgment of Response to Inspection Report 05000445/2022003 and Notice of Violation | |
CP-202200481, Response to Request for Additional Information - Relief Request Application P-1, Inservice Testing (IST) | 7 December 2022 | Response to Request for Additional Information - Relief Request Application P-1, Inservice Testing (IST) | Probabilistic Risk Assessment |
IR 05000445/2022420 | 7 December 2022 | Security Baseline Inspection Report Cover Letter 05000445/2022420 and 05000446/2022420 | Affidavit |
CP-202200454, (Cpnpp), Reply to a Notice of Violation Transmitted Via NRC Letter from Gregory Werner to Ken Peters Dated 11/01/2022, Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Inspection Report 05000445/2022003 . | 1 December 2022 | (Cpnpp), Reply to a Notice of Violation Transmitted Via NRC Letter from Gregory Werner to Ken Peters Dated 11/01/2022, Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Inspection Report 05000445/2022003 . | Safe Shutdown |
ML22298A016 | 1 December 2022 | License Renewal Application Online Reference Portal | |
ML22329A033 | 29 November 2022 | Notification of NRC Initial Operator Licensing Examination 05000445/2023301 and 05000446/2023301 | |
ML22297A007 | 23 November 2022 | Notice of Acceptance and Opportunity for Hearing Letter | |
CP-202200380, (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications | 21 November 2022 | (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications | Boric Acid Shutdown Margin Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report Surveillance Frequency Control Program Fuel cladding Power change |
CP-202200355, Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002 | 21 November 2022 | Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002 | Reactor Vessel Water Level Loop seal Stroke time Anticipated operational occurrence Hydrostatic Coatings Pressure and Temperature Limits Report Surveillance Frequency Control Program Fuel cladding |
CP-202200450, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters | 16 November 2022 | (CPNPP) - Registration of Dry Spent Fuel Storage Canisters | |
ML22319A073 | 15 November 2022 | Review of the Fall 2021 Steam Generator Tube Inspection Report | |
CP-202200435, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters | 8 November 2022 | (Cpnpp), Registration of Dry Spent Fuel Storage Canisters | |
CP-202200419, (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report | 3 November 2022 | (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report | Nondestructive Examination |
ML22299A056 | 1 November 2022 | Integrated Inspection Report 05000445/2022003 and 05000446/2022003 and Notice of Violation | Safe Shutdown Time of Discovery High winds Ultimate heat sink Internal Flooding Enforcement Discretion Functionality Assessment Significance Determination Process Severe Accident Management Guideline Earthquake Maintenance Rule Program Control of Heavy Loads Fire Protection Program |
IR 05000445/2022003 | 1 November 2022 | Integrated Inspection Report 05000445/2022003 and 05000446/2022003 and Notice of Violation | Safe Shutdown Time of Discovery High winds Ultimate heat sink Internal Flooding Enforcement Discretion Operating Basis Earthquake Functionality Assessment Significance Determination Process Operability Determination Severe Accident Management Guideline Maintenance Rule Program Control of Heavy Loads Fire Protection Program Siren |
ML22285A075 | 24 October 2022 | LRA - Receipt and Availability Letter | License Renewal |
CP-202200358, (CPNPP) - Transmittal of Revised Emergency Plan (Revision 46) | 14 September 2022 | (CPNPP) - Transmittal of Revised Emergency Plan (Revision 46) | Health Physics Network Fukushima Dai-Ichi |
CP-202200357, (CPNPP) Unit 2 - Response to Request for Additional Information, Fall 2021 (2RF19) Steam Generator Tube Inspection Report | 14 September 2022 | (CPNPP) Unit 2 - Response to Request for Additional Information, Fall 2021 (2RF19) Steam Generator Tube Inspection Report | |
CP-202200246, Evacuation Time Estimate Analysis | 25 August 2022 | Evacuation Time Estimate Analysis | Pandemic Coronavirus COVID19 |
ML22192A007 | 22 August 2022 | Issuance of Amendment Nos. 183 and 183 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 | Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Flooding Focused Evaluation Maintenance Rule Program Offsite Circuit |
IR 05000445/2022005 | 22 August 2022 | Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022005 and 05000446/2022005) | Fitness for Duty Commercial Grade Dedication Cyber Security License Renewal Exemption Request COVID-19 |
ML22228A094 | 17 August 2022 | Notification of Inspection (NRC Inspection Report 05000445/2022004 and 05000446/2022004) and Request for Information | |
CP-202200306, (CPNPP) - Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 22 (1RF22) | 11 August 2022 | (CPNPP) - Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 22 (1RF22) | |
IR 05000445/2022403 | 9 August 2022 | NRC Security Inspection Report 05000445/2022403 and 05000446/2022403 (Full Report) | |
IR 05000445/2022002 | 5 August 2022 | 2nd Quarter 2022 Integrated Inspection Report 05000445/2022002 and 05000446/2022002 | Safe Shutdown Boric Acid High Radiation Area Non-Destructive Examination Fire Barrier Stroke time Internal Flooding Enforcement Discretion Nondestructive Examination Temporary Modification VT-2 Functionality Assessment Condition Adverse to Quality Significance Determination Process Operability Determination Nonconservative Technical Specifications Liquid penetrant Fire Protection Program Dissimilar Metal Weld |
ML22208A158 | 29 July 2022 | Correction to Issuance of Amendment Nos. 156 and 156 Relocation of Surveillance Frequencies from the Technical Specifications to a Licensee-Controlled Document | Surveillance Frequency Control Program |
CP-202200273, Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative | 20 July 2022 | Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative | Surveillance Frequency Control Program |
CP-202200276, (CPNPP) - Relief Request Application P-1, Inservice Testing (IST) | 20 July 2022 | (CPNPP) - Relief Request Application P-1, Inservice Testing (IST) | Safe Shutdown Probabilistic Risk Assessment |
ML22194A059 | 14 July 2022 | Correction to Amendment Nos. 182 and 182 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections | |
CP-202200247, (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 017 | 30 June 2022 | (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 017 | |
ML22151A184 | 22 June 2022 | License Renewal Application May 26, 2022 Pre-submittal Public Meeting Summary | Aging Management License Renewal Subsequent License Renewal |
CP-202200244, (CPNPP) - Transmittal of Revised Emergency Plan (Revision 45) | 20 June 2022 | (CPNPP) - Transmittal of Revised Emergency Plan (Revision 45) | Health Physics Network Fukushima Dai-Ichi |
ML22152A041 | 10 June 2022 | Summary of Regulatory Audit License Amendment Request to Revise TS to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b | High winds Internal Flooding Probabilistic Risk Assessment Open Phase Condition |
CP-202200219, (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 2026 | 18 May 2022 | (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 2026 | |
CP-202200003, (CPNPP) - Annual Report of Changes in Peak Cladding Temperature | 16 May 2022 | (CPNPP) - Annual Report of Changes in Peak Cladding Temperature | |
ML22129A072 | 16 May 2022 | Review of Quality Assurance Program Changes | Offsite Dose Calculation Manual Process Control Program Grace period |
CP-202200205, (CPNPP) - License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Rtstf. | 12 May 2022 | (CPNPP) - License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Rtstf. | |
CP-202200200, (CPNPP) Unit 2 Refueling Outage 19 (2RF19) Steam Generator 180 Day Report | 5 May 2022 | (CPNPP) Unit 2 Refueling Outage 19 (2RF19) Steam Generator 180 Day Report | Nondestructive Examination |
ML22124A304 | 5 May 2022 | Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000445/2022003 and 05000446/2022003) and Request for Information | Ultimate heat sink Coatings Nondestructive Examination Aging Management Frazil ice |
CP-202200196, Report of Changes to the Physical Security Plan (Revision 14) | 4 May 2022 | Report of Changes to the Physical Security Plan (Revision 14) | |
CP-202200183, (CPNPP) - 2021 Annual Radiological Environmental Operating Report | 28 April 2022 | (CPNPP) - 2021 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Commercial Grade Dedication Annual Radiological Environmental Operating Report |
CP-202200181, (CPNPP) - 2021 Annual Environmental Operating Report (Non-Radiological) | 27 April 2022 | (CPNPP) - 2021 Annual Environmental Operating Report (Non-Radiological) | |
IR 05000445/2022001 | 26 April 2022 | Integrated Inspection Report 05000445/2022001 and 05000446/2022001 | Ultimate heat sink Past operability Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Fire Protection Program Power change |
CP-202200144, (CPNPP) - Core Operating Limits Report (Colr), Unit 1 Cycle 23, (ERX-22-001, Revision 0) | 25 April 2022 | (CPNPP) - Core Operating Limits Report (Colr), Unit 1 Cycle 23, (ERX-22-001, Revision 0) | Shutdown Margin |
IR 05000445/2022402 | 25 April 2022 | Security Baseline Inspection Report 05000445/2022402 and 05000446/2022402 | |
CP-202200145, (CPNPP) - 2021 Annual Radioactive Effluent Release Report | 18 April 2022 | (CPNPP) - 2021 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
CP-202200122, (CPNPP) - Property Damage Insurance | 31 March 2022 | (CPNPP) - Property Damage Insurance | |
CP-202200123, (CPNPP) - License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times. | 29 March 2022 | (CPNPP) - License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times. | High winds Large early release frequency |
CP-202200128, Core Operating Limits Report Unit 2 Cycle 20, (ERX-21-001, Revision 1) | 28 March 2022 | Core Operating Limits Report Unit 2 Cycle 20, (ERX-21-001, Revision 1) | Shutdown Margin |
ML22077A841 | 24 March 2022 | Proposed Alternative SNB-3 for the Snubber Inservice Program Third Interval Extension | Incorporated by reference |
IR 05000445/2021006 | 2 March 2022 | Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021006 and 05000446/2021006) | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
ML21321A349 | 24 February 2022 | Issuance of Amendment Nos. 182 and 182 to Revise Technical Specifications to Adopt TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspections | Post Accident Monitoring Nondestructive Examination Pressure and Temperature Limits Report Surveillance Frequency Control Program |
CP-202200006, (CPNPP) - Second Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended. | 17 February 2022 | (CPNPP) - Second Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended. | Safe Shutdown High winds High Radiation Area Ultimate heat sink Fire Barrier Slow transfer Anticipated operational occurrence Tornado Missile Internal Flooding Probabilistic Risk Assessment Fire impairment FLEX Fukushima Dai-Ichi Thermoset Surveillance Frequency Control Program Open Phase Condition Large early release frequency Frazil ice Earthquake Maintenance Rule Program Power Operated Valves Turbine Missile Fuel cladding Offsite Circuit Fire Protection Program Power change |
CP-202200075, Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | 15 February 2022 | Third Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | |
ML22041A005 | 11 February 2022 | Transmittal of Dam Inspection Report (EPID L-2017-LNS-0015) (Public) | Safe Shutdown |
CP-202200068, (CPNPP) - Guarantees of Payment of Deferred Premiums | 10 February 2022 | (CPNPP) - Guarantees of Payment of Deferred Premiums | |
IR 05000445/2020011 | 7 February 2022 | Amended - Comanche Peak Nuclear Power Plant - Triennial Fire Protection Inspection Report 05000445/2020011 and 05000446/2020011 and Notice of Violation | Safe Shutdown Probabilistic Risk Assessment Fire impairment Temporary Modification Arc flash COVID19 Fire Protection Program |
ML22038A166 | 1 February 2022 | (CPNPP) - Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 111 | |
CP-202200041, (CPNPP) - Supplement to ASME OM Inservice Test Program Relief Request SNB-3, Snubber Inservice Program Third Interval Extension | 27 January 2022 | (CPNPP) - Supplement to ASME OM Inservice Test Program Relief Request SNB-3, Snubber Inservice Program Third Interval Extension | |
CP-202200035, Second Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | 25 January 2022 | Second Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | Post Accident Monitoring Nondestructive Examination Pressure and Temperature Limits Report |
IR 05000445/2021004 | 25 January 2022 | Integrated Inspection Report 05000445/2021004 and 05000446/2021004 | Safe Shutdown Boric Acid High Radiation Area Commercial Grade Dedication Weld Overlay Post Accident Monitoring Internal Flooding Nondestructive Examination Temporary Modification Cyber Security Functionality Assessment Locked High Radiation Area FLEX Operability Determination Time Critical Operator Action Liquid penetrant Fire Protection Program Substantial potential for an overexposure Overexposure |
IR 05000445/2021012 | 13 January 2022 | TI-194 Report 05000445/2021012 and 05000446/2021012 | Probabilistic Risk Assessment Operator Manual Action Open Phase Condition |
CP-202100751, (CPNPP) - ASME OM Inservice Test Program Relief Request SNB-3, Snubber Inservice Program Third Internal Extension | 4 January 2022 | (CPNPP) - ASME OM Inservice Test Program Relief Request SNB-3, Snubber Inservice Program Third Internal Extension | |
IR 05000445/2021405 | 15 December 2021 | Security Baseline Inspection Report 05000445/2021405 and 05000446/2021405 | |
IR 05000445/2021403 | 9 December 2021 | Powerplant, Units 1 and 2 - Security Baseline Inspection Report 05000445/2021403 and 05000446/2021403 | Coronavirus COVID-19 |
ML21322A103 | 7 December 2021 | Proposed Alternative for the Continued Use of a Risk-Informed Process for the Selection of Class 1 and 2 Piping Welds for Inservice Inspection | Internal Flooding Probabilistic Risk Assessment Large early release frequency Exemption Request DM weld |
IR 05000445/2021003 | 3 November 2021 | Integrated Inspection Report 05000445/2021003 and 05000446/2021003 | Internal Flooding Temporary Modification Functionality Assessment Operability Determination Coronavirus COVID-19 Fire Protection Program |
CP-202100715, Report of Changes to the Physical Security Plan (Revision 13) | 2 November 2021 | Report of Changes to the Physical Security Plan (Revision 13) | |
CP-202100694, (CPNPP) - NRC Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | 25 October 2021 | (CPNPP) - NRC Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | Post Accident Monitoring Nondestructive Examination Pressure and Temperature Limits Report |
IR 05000445/2021301 | 19 October 2021 | NRC Examination Report 05000445/2021301 and 05000446/2021301 | Pandemic COVID-19 |
CP-202100682, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 20, (ERX-21-001, Revision 0) | 19 October 2021 | (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 20, (ERX-21-001, Revision 0) | Shutdown Margin |
IR 05000445/2021010 | 7 October 2021 | Biennial Problem Identification and Resolution Inspection Report 05000445/2021010 and 05000446/2021010 | Condition Adverse to Quality Pandemic Coronavirus |
ML21285A039 | 23 September 2021 | CP-2021-08-Post Exam Comments | |
ML21264A029 | 21 September 2021 | NRC Initial Operator Licensing Examination Approval 05000445/2021301 and 05000446/2021301 | |
IR 05000445/2021401 | 9 September 2021 | Security Baseline Inspection Report 05000445/2021401 and 05000446/2021401 | Fitness for Duty Coronavirus COVID-19 |
IR 05000445/2021005 | 1 September 2021 | Mid-Cycle Inspection Plan Transmittal Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021005 and 05000446/2021005) | Fitness for Duty Operator Manual Action Cyber Security Open Phase Condition Exemption Request Power-Operated Valves COVID-19 |
CP-202100575, (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | 31 August 2021 | (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | Post Accident Monitoring Nondestructive Examination Pressure and Temperature Limits Report |
ML21236A333 | 25 August 2021 | CP2021301-Revised Exam Approval Ltr | |
CP-202100570, (CPNPP) - Initial Operator Licensing Examination | 24 August 2021 | (CPNPP) - Initial Operator Licensing Examination | |
CP-202100550, Quality Assurance Program Internal Audit Frequency | 24 August 2021 | Quality Assurance Program Internal Audit Frequency | Offsite Dose Calculation Manual Process Control Program Grace period |
IR 05000445/2021402 | 19 August 2021 | Security Baseline Inspection Report 05000445/2021402 and 05000446/2021402 | Fitness for Duty Coronavirus COVID-19 |
CP-202100559, (CPNPP) - Initial Operator Licensing Examination | 17 August 2021 | (CPNPP) - Initial Operator Licensing Examination | |
IR 05000445/2021002 | 10 August 2021 | Integrated Inspection Report 05000445/2021002 and 05000446/2021002 | Enforcement Discretion Functionality Assessment Significance Determination Process Operability Determination Coronavirus COVID-19 Fire Protection Program |
ML21215A579 | 4 August 2021 | NRC Initial Operator Licensing Examination Approval 05000445/2021301 and 05000446/2021301 | |
CP-202100251, (CPNPP) - Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | 27 July 2021 | (CPNPP) - Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | Post Accident Monitoring Nondestructive Examination Pressure and Temperature Limits Report |
CP-202100394, Supplement to License Amendment Request (LAR) 20-006 | 13 July 2021 | Supplement to License Amendment Request (LAR) 20-006 | High winds Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Fuel cladding Offsite Circuit |
IR 05000445/2021001 | 23 June 2021 | Revised Report - Comanche Peak Nuclear Plant, Units 1 and 2 - Integrated Inspection Report 05000445/2021001; 05000446/2021001 and Independent Spent Fuel Storage Inspection 07200074/2021001 | High winds Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Coronavirus COVID-19 Fire Protection Program Power change |
ML21166A338 | 22 June 2021 | Supplemental Information Needed for Acceptance of Requested Licensing Action LAR to Adopt TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Probabilistic Risk Assessment Offsite Circuit |
IR 05000445/2021404 | 17 June 2021 | Material Control and Accounting Program (Public) Inspection Report 05000445/2021404 05000446/2021404 | Affidavit |
ML21132A089 | 9 June 2021 | Issuance of Amendment Nos. 181 and 181 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-567, Rev. 1, Add Containment Sump TS to Address GSI - 191 Issues | Surveillance Frequency Control Program |
CP-202100256, Reply to a Notice of Violation | 3 June 2021 | Reply to a Notice of Violation | |
ML21195A198 | 27 May 2021 | Radiological Emergency Preparedness Program (Repp) Final Report for the Virtual Medical Services Drill | Coronavirus |
ML21133A003 | 19 May 2021 | Temporary Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection A.7 (EPID L-2021-LLE-0024 (Covid 19)) | Exemption Request Pandemic Coronavirus COVID-19 |
ML21061A217 | 19 May 2021 | Issuance of Amendment Nos. 180 and 180 to Authorize Revision of Certain Emergency Action Levels of the Emergency Plan | Safe Shutdown Ultimate heat sink Operating Basis Earthquake Earthquake |
ML21119A349 | 17 May 2021 | Temporary Exemption from Requirements of 10 CFR Part 50, Appendix E, Sections IV.F.2.B and IV.F.2.C (EPID L-2021-LLE-0028 (COVID-19)) | Pandemic Coronavirus COVID-19 |
CP-202100241, (CPNPP) - Supplemental Information Regarding Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section VI, Subsection A.7 Regarding Annual Force-on-Force (FOF) Exercises (COVID-19) - Cover Letter | 12 May 2021 | (CPNPP) - Supplemental Information Regarding Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section VI, Subsection A.7 Regarding Annual Force-on-Force (FOF) Exercises (COVID-19) - Cover Letter | Exemption Request Coronavirus |
ML21131A095 | 11 May 2021 | CP2021001-RP-JE, Comanche Peak Nuclear Power Plant, Units 1 and 2 - Integrated Inspection Report 05000445/2021001 and 05000446/2021001 | High winds Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Coronavirus Fire Protection Program Power change |
CP-202100065, Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 11 May 2021 | Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds High Radiation Area Ultimate heat sink Fire Barrier Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Frazil ice Earthquake Power Operated Valves Turbine Missile Offsite Circuit Fire Protection Program Power change |
IR 05000445/2021011 | 6 May 2021 | Design Basis Assurance Inspection (Teams) Inspection Report 05000445/2021011 and 05000446/2021011 and Notice of Violation | |
ML21125A433 | 6 May 2021 | Supplemental Information Needed for Acceptance of Requested Licensing Action Temporary Exemption from Annual FOF Exercise Requirement of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection A.7 (Public) | Exemption Request |
CP-202100224, (Cpnpp), 2020 Annual Environmental Operating Report (Non-Radiological) | 29 April 2021 | (Cpnpp), 2020 Annual Environmental Operating Report (Non-Radiological) | |
CP-202100225, Plari.T (CPNPP) - 2020 Annual Radiological Environmental Operating Report | 29 April 2021 | Plari.T (CPNPP) - 2020 Annual Radiological Environmental Operating Report | Annual Radiological Environmental Operating Report |
CP-202100152, (CPNPP) - 2020 Annual Radioactive Effluent Release Report | 28 April 2021 | (CPNPP) - 2020 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
CP-202100216, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters | 26 April 2021 | (CPNPP) - Registration of Dry Spent Fuel Storage Canisters | |
ML21103A039 | 23 April 2021 | Issuance of Amendment Nos. 179 and 179 the Adoption of Technical Specifications Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition (EPID L-2020-0147) | Shutdown Margin Anticipated operational occurrence |
ML21111A011 | 22 April 2021 | Correction to Amendment Nos. 168 and 168 Adoption of TSTF-545, Rev. 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing | |
CP-202100202, One-Time Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, IV.F.2.b and IV.F.2.c | 21 April 2021 | One-Time Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, IV.F.2.b and IV.F.2.c | Exemption Request Pandemic Coronavirus COVID-19 |
CP-202100201, Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section VI, Subsection A.7 and Subsection C.3.(L)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID-19 PHE | 16 April 2021 | Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section VI, Subsection A.7 and Subsection C.3.(L)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID-19 PHE | Exemption Request Pandemic Coronavirus |
CP-202100204, Response to RIS 2000-11, NRC Emergency Telecommunications System | 15 April 2021 | Response to RIS 2000-11, NRC Emergency Telecommunications System | Health Physics Network |
ML21103A398 | 13 April 2021 | CP Security Inspection Information Request 2021403 | |
CP-202100156, Registration of Dry Spent Fuel Storage Canisters | 7 April 2021 | Registration of Dry Spent Fuel Storage Canisters | |
CP-202100154, (CPNPP) - Property Damage Insurance | 31 March 2021 | (CPNPP) - Property Damage Insurance | |
CP-202100155, (CPNPP) - Decommissioning Report | 31 March 2021 | (CPNPP) - Decommissioning Report | Decommissioning Funding Plan Authorized possession limits Fuel cladding Fire Watch |
CP-202100143, (CPNPP) - Relief Request 1A4-3 for Continued Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and 2 Piping Welds for Unit 1 Inservice Inspection | 30 March 2021 | (CPNPP) - Relief Request 1A4-3 for Continued Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and 2 Piping Welds for Unit 1 Inservice Inspection | Internal Flooding Probabilistic Risk Assessment Large early release frequency |