|
---|
Category:Letter
MONTHYEARCP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 IR 05000445/20230042024-01-29029 January 2024 Integrated Inspection Report 05000445/2023004 and 05000446/2023004 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) ML24024A2102024-01-29029 January 2024 Summary of Regulatory Audit Regarding a License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24025A0052024-01-25025 January 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24023A0242024-01-24024 January 2024 Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology ML24018A1072024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information ML23159A2082023-12-20020 December 2023 Request for Withholding Information from Public Disclosure ML23319A3872023-12-20020 December 2023 Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology ML23348A2392023-12-19019 December 2023 Nonacceptance of License Amendment Request to Relocate Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 ML23333A0872023-12-13013 December 2023 Transmittal of Dam Safety Inspection Report - Public CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 ML23313A0732023-12-0606 December 2023 Issuance of Amendment Nos. 184 and 184 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Rev. 1, Improved Roac and CAOC Fq Surveillance Technical Specifications ML23291A4382023-11-30030 November 2023 Notice of Availability of the Draft Plant-Specific Supplement 60, to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Comanche Peak Nuclear Power Plant, Unit Numbers 1 and 2, License Renewal Applica ML23325A0182023-11-30030 November 2023 Schedule Revision for the License Renewal Application Review IR 05000445/20234022023-11-30030 November 2023 NRC Security Inspection Report 05000445/2023402 and 05000446/2023402 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation ML23308A0032023-11-17017 November 2023 Letter to R. Nelson, Executive Director; Achp; Re., Comanche Peak Draft Environmental Impact Statement ML23308A0022023-11-17017 November 2023 Letter to M. Wolfe, Executive Director; Shpo; Re., Comanche Peak Draft Environmental Impact Statement ML23317A3002023-11-13013 November 2023 Letter to R. Sylestine, Chairman, Alabama-Coushatta Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2972023-11-13013 November 2023 Letter to R. Martin, President, Tonkawa Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2872023-11-13013 November 2023 Letter to J. Garza, Chairman, Kickapoo Traditional Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2832023-11-13013 November 2023 Letter to D. Dotson, President, Delaware Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2852023-11-13013 November 2023 Letter to E. Martinez, President, Mescalero Apache Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23306A0302023-11-13013 November 2023 Letter to J. Cernek, Chairman; Coushatta Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2902023-11-13013 November 2023 Letter to M. Pierite, Chairman, Tunica Biloxi Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2982023-11-13013 November 2023 Letter to R. Morrow, Town King, Thlopthlocco Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2842023-11-13013 November 2023 Letter to D. Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2822023-11-13013 November 2023 Letter to D. Cooper, Chairman, Apache Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2962023-11-13013 November 2023 Letter to M. Woommavovah, Chairman, Comanche Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2812023-11-13013 November 2023 Letter to C. Hoskin, Principal Chief, Cherokee Nation; Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2862023-11-13013 November 2023 Letter to J. Bunch, Chief, United Keetoowah Band of Cherokee Indians Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3032023-11-13013 November 2023 Letter to W. Yargee, Chief, Alabama-Quassarte Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2882023-11-13013 November 2023 Letter to L. Johnson, Chief, Seminole Nation of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3012023-11-13013 November 2023 Letter to S. Yahola, Mekko, Kialegee Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2792023-11-13013 November 2023 Letter to B. Gonzalez, Chairman, Caddo Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3022023-11-13013 November 2023 Letter to T. Parton, President, Wichita and Affiliated Tribes Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2892023-11-13013 November 2023 Letter to L. Spottedbird, Chairman, Kiowa Indian Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23360A6312023-10-26026 October 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the Comanche Peak Nuclear Power Plant Medical Services Drill Evaluated on August 23, 2023 CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23263A0242023-09-21021 September 2023 Revision of Schedule for the Environmental Review of the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application 2024-01-31
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000445/20233012023-08-21021 August 2023 NRC Examination Report 05000445/2023301 and 05000446/2023301 ML23156A2302023-06-0606 June 2023 NRC Initial Operator Licensing Examination Approval 05000445/2023301 and 05000446/2023301 IR 05000445/20213012021-10-19019 October 2021 NRC Examination Report 05000445/2021301 and 05000446/2021301 ML21236A3332021-08-25025 August 2021 CP2021301-Revised Exam Approval Ltr ML18207A9422018-08-0101 August 2018 NRC Examination Report 05000445/2018301, 05000446/2018301 IR 05000445/20173012017-07-11011 July 2017 NRC Examination Report 05000445/2017301; 05000446/2017301 IR 05000445/20163012016-09-23023 September 2016 NRC Examination Report 05000445/2016301; 05000446/2016301 IR 05000445/20153022015-06-26026 June 2015 Er 05000445/2015302; 05000446/2015302; on 06/01/2015 - 06/23/2015; the Comanche Peak Nuclear Power Plant, Units 1 and 2; Initial Operator Licensing Examination Report IR 05000445/20143012014-06-27027 June 2014 Er 05000445-14-301; 05000446-14-301; on June 9-16, 2014; the Comanche Peak Nuclear Power Plant, Units 1 and 2; Initial Operator Licensing Examination Report IR 05000445/20133012013-04-24024 April 2013 Er 05000445-13-301 & 05000446-13-301, 03/04/2013 - 04/22/2013, Comanche Peak Nuclear Power Plant, Units 1 and 2, Initial Operator Licensing Examination Report IR 05000445/20123012012-08-23023 August 2012 Er 05000445-12-301, & 05000446-12-301, June 11 Through July 23, 2012, Comanche Peak Nuclear Power Plant, Units 1 and 2, Initial Operator Licensing Examination Report IR 05000445/20113012011-07-0808 July 2011 Initial Operator Licensing Examination Report 05000445/2011301; 05000446/2011301 IR 05000445/20103022010-07-30030 July 2010 Er 05000445-10-302 on 07/07/10 07/08/10 for Comanche Peak Nuclear Power Plant, Unit 1 & 2, Initial Operator Licensing Examination Report IR 05000445/20093012009-05-0808 May 2009 Er 05000445-09-301, 05000446-09-301 on 03/30/09 - 04/14/09 for Comanche Peak, Units 1 and 2 IR 05000445/20053022005-11-0909 November 2005 Er 05000445-05-302; 05000446-05-302; 09/26/2005; Comanche Peak Steam Electric Station; Retake Operator Licensing Examination Report ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination 2023-08-21
[Table view] |
Text
August 21, 2023
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC EXAMINATION REPORT 05000445/2023301 AND 05000446/2023301
Dear Mr. Peters:
On June 15, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Comanche Peak Nuclear Power Plant, Units 1 and 2. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on June 15, 2023, with you and other members of your staff. A telephonic meeting was conducted on July 24, 2023, with Mr. K. Brigman, Regulatory Affairs and Licensing Analyst, who was provided the NRC licensing decisions. A final telephonic exit meeting was held on August 15, 2023.
The examination included the evaluation of eight applicants for reactor operator licenses, four applicants for instant senior reactor operator licenses, and one applicant for an upgrade senior reactor operator license. The license examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure contains details of this report.
No findings were identified during this examination. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Signed by Gepford, Heather on 08/21/23 Heather J. Gepford, Ph.D., Chief Operations Branch Division of Operating Reactor Safety Docket Nos. 50-445; 50-446 License Nos. NPF-87; NPF-89 Enclosure:
Examination Report 05000445/2023301, and 05000446/2023301 w/attachment: Supplemental Information Distribution via LISTSERV
ML23228A112 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
by: KDC1 Yes No Non-Publicly Available Sensitive NRR-079 OFFICE RIV:DORS:OB:SOE RIV:DORS:OB:SOE RIV:DORS:OB:SOE RI:DORS:OB:SOE NAME KClayton TFarina JKirkland JDemarshall SIGNATURE /RA/ /RA/ /RA/ /RA/
DATE 08/16/23 08/21/23 08/16/23 08/16/23 OFFICE RIV:DORS:OB:OE RIV:DORS:OB:C NAME KMurphy HGepford SIGNATURE /RA/ /RA/
DATE 08/16/23 08/21/23
U.S. NUCLEAR REGULATORY COMMISSION Examination Report Docket Numbers: 05000445, 05000446 License Numbers: NPF-87, NPF-89 Report Numbers: 05000445/2023301, 05000446/2023301 Enterprise Identifier: L-2023-OLL-0030 Licensee: Vistra Operations Company, LLC Facility: Comanche Peak Nuclear Power Plant, Units 1 and 2 Location: Glen Rose, Texas Inspection Dates: January 9, 2023, to June 15, 2023 Inspectors: K. Clayton, Chief Examiner, Senior Operations Engineer J. Kirkland, Senior Operations Engineer J. DeMarshall, Senior Operations Engineer T. Farina, Senior Operations Engineer K. Murphy, Operations Engineer Russell Williams, Operations Engineer Under Instruction Approved By: Heather J. Gepford, Ph.D., Chief Operations Branch Division of Operating Reactor Safety Enclosure
SUMMARY Examination Report 05000445/2023301 and 05000446/2023301; 01/09/2023 - 06/15/2023; Comanche Peak Nuclear Power Plant, Units 1 and 2; Initial Operator Licensing Examination Report The NRC examiners evaluated the competency of eight applicants for reactor operator licenses, four applicants for instant senior reactor operator licenses and one applicant for an upgrade senior reactor operator license at Comanche Peak Nuclear Power Plant, Units 1 and 2.
The NRC developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 12. The written examination was administered by the licensee on June 22, 2023. The NRC examiners administered the operating tests on June 12-15, 2023.
The NRC examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
A. NRC-Identified and Self-Revealing Findings None.
B. Licensee-Identified Violations None.
REPORT DETAILS OTHER ACTIVITIES - INITIAL LICENSE EXAMINATION
.1 License Applications a. Scope The NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The NRC examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings No findings were identified.
.2 Examination Development a. Scope The NRC examiners developed the outlines, operating tests, and written examinations using the requirements of NUREG-1021, Revision 12. The NRC examiners conducted onsite development during the week of January 9, 2023, and onsite validation of the operating tests the week of May 15, 2023. Four complete written examination validations were completed by the licensee in April and May of 2023.
b. Findings The NRC examiners provided draft examination and post-validation comments to the licensee. All comments were satisfactorily resolved between the licensee and NRC on June 8, 2023. There were several procedural enhancement opportunities that were identified during exam development. These procedure enhancements were captured in the licensees corrective action program as issue report IR-2023-004917.
.3 Operator Knowledge and Performance a. Scope On June 22, 2023, the licensee proctored the administration of the written examinations to all thirteen applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on July 12, 2023. The NRC completed two independent gradings of the written examinations on July 14, 2023.
The NRC examination team administered the operating tests to all applicants on June 12-15, 2023.
Attachment
b. Findings No findings were identified.
All applicants passed the written examination and all parts of the operating tests. The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal.
The examination team noted no generic weaknesses associated with applicant performance on the operating tests. Post-examination analysis revealed four generic knowledge weaknesses associated with applicant performance on the written examination. The weaknesses were on SRO-only questions Q79, Q82, Q92, and Q97 and are documented in the post exam submittal analysis under the accession number located at the end of this report. These deficiencies were captured in the licensees corrective action program as training report TR-2023-004917. Copies of all individual examination reports were sent to the facility training manager for evaluation and determination of appropriate remedial training.
.4 Simulation Facility Performance a. Scope The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
b. Findings No findings were identified.
.5 Examination Security a. Scope The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for examination security and applicant control were reviewed and discussed with licensee personnel.
b. Findings No findings were identified.
EXIT MEETINGS AND DEBRIEFS Exit Meeting Summary The chief examiner presented the preliminary examination results to Mr. S. Sewell, Site Vice President, and other members of your staff on June 15, 2023. A telephonic call to issue licenses was conducted on July 24, 2023, between Mr. K. Brigman, and Mr. K. Clayton, chief examiner.
The final exit meeting was conducted on August 15, 2023, with Mr. S. Sewell, Site Vice President, and other members of your staff. The licensee did not identify any information or materials used during the examination as proprietary.
ADAMS DOCUMENTS REFERENCED Accession No. ML23226A227 - FINAL WRITTEN EXAMS Accession No. ML23226A226 - FINAL OPERATING TEST Accession No. ML23226A234 - POST-EXAMINATION ANALYSIS 3