IR 05000445/2021403

From kanterella
Jump to navigation Jump to search
Powerplant, Units 1 and 2 - Security Baseline Inspection Report 05000445/2021403 and 05000446/2021403
ML21322A354
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/09/2021
From: Ray Kellar
NRC Region 4
To: Peters K
Vistra Operations Company
References
IR 2021403
Download: ML21322A354 (6)


Text

December 9, 2021

SUBJECT:

COMANCHE PEAK NUCLEAR POWERPLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000445/2021403 AND 05000446/2021403

Dear Mr. Peters:

On October 12, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Comanche Peak Nuclear Powerplant, Units 1 and 2. On November 3, 2021, the NRC inspectors discussed the results of this inspection with Mr. John Dreyfuss, Director, Organizational Effectiveness, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 05000445 and 05000446 License Nos. NPF-87 and NPF-89 Enclosure:

Inspection Report 05000445/2021403 and 05000446/2021403 Signed by Kellar, Ray on 12/09/21

ML21322A354 X SUNSI Review By: RLK ADAMS:

X Yes No Sensitive X Non-Sensitive Non-Publicly Available X Publicly Available Keyword NRC-002 OFFICE PSI:PSB1 PSI:PSB1 C:PSB1 C:DRPB C:PSB1 NAME AMeyen CJewett RKellar GWerner RKellar SIGNATURE

/RA/

/RA/

/RA/

GEW

/RA/

DATE 11/19/2021 11/29/2021 11/29/2021 12/06/2021 12/9/2021

Enclosure U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers:

05000445 and 05000446

License Numbers:

NPF-87 and NPF-89

Report Numbers:

05000445/2021403 and 05000446/2021403

Enterprise Identifier:

I-2021-403-0000

Licensee:

VISTRA Operating Company, LLC

Facility:

Comanche Peak Nuclear Powerplant, Units 1 and 2

Location:

Glen Rose, TX 76043

Inspection Dates:

August 16, 2021 to October 12, 2021

Inspectors:

C. Jewett, Physical Security Inspector

A. Meyen, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Comanche Peak Nuclear Powerplant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

SAFEGUARDS

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following

procedure elements: Protective Strategy Evaluation

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirements

(2) Performance Evaluation Program: Inspectors observed a licensee conducted annual FOF on August 18,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On November 3, 2021, the inspectors presented the security baseline inspection results to Mr. John Dreyfuss, Director, Organizational Effectiveness, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

CR-2019-007675,

CR-2019-008686,

CR-2019-009475,

CR-2020-000156,

CR-2020-005465,

CR-2021-003925

Corrective Action

Documents

Resulting from

Inspection

IR-2021-005404,

CR-2021-003925

CPNPP Security Plan

013

Compensatory and Contingency Instruction

030

EVAL-2020-006

CPNPP Nuclear Oversight Audit Report: Physical Security

01/20/2021

SC21.ADV.BS1

Adversary Training

000

Miscellaneous

SC37.SDG.ZZ1

Force-On-Force Controller Training

000

CPNPP Security

Instruction

Alarm Stations

059

CPNPP Security

Instructions 1.0

CPNPP Common Instructions

2

SEC-102-1

Plan Change Review Form

09/22/2021

SEC-116

Drills and Exercises

2

SEC-119

Protective Strategy

017

Procedures

SEC-506

SECURITY EQUIPMENT MAINTENANCE, TESTING, AND

CALIBRATION

037

71130.05

Self-Assessments

TR-2021-002589

71130.05 Protective Strategy