IR 05000445/2023005
| ML23233A087 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/23/2023 |
| From: | Greg Werner NRC/RGN-IV/DORS/PBB |
| To: | Peters K Vistra Operations Company |
| References | |
| IR 2023005 | |
| Download: ML23233A087 (1) | |
Text
SUBJECT:
UPDATED INSPECTION PLAN FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000445/2023005 AND 05000446/2023005)
Dear Ken Peters:
The enclosed inspection plan lists the inspections scheduled through June 30, 2025, for Comanche Peak Nuclear Power Plant. The U.S. Nuclear Regulatory Commission (NRC)
provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). The ADAMS system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89 Enclosure:
Inspection Plan cc w/ encl: Distribution via LISTSERV August 23, 2023