Security Baseline Inspection Report 05000445/2021402 and 05000446/2021402
ML21228A027
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/19/2021
From: Ray Kellar
Plant Support Branch-1
To: Peters K
Vistra Operating Co. (VistraOpCo)
References
IR 2021402
Download: ML21228A027 (8)


Text

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000445/2021402 AND 05000446/2021402

Dear Mr. Peters:

On July 29, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Comanche Peak Nuclear Power Plant, Units 1 and 2 and discussed the results of this inspection with Mr. John Dreyfuss and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor safety Docket Nos. 05000445 and 05000446 License Nos. NPF-87 and NPF-89

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000445 and 05000446

License Numbers:

NPF-87 and NPF-89

Report Numbers:

05000445/2021402 and 05000446/2021402

Enterprise Identifier:

I-2021-402-0006

Licensee:

VISTRA Operating Company, LLC

Facility:

Comanche Peak Nuclear Power Plant, Units 1 and 2

Location:

Glen Rose, TX

Inspection Dates:

July 26, 2021 to July 29, 2021

Inspectors:

C. Jewett, Physical Security Inspector

R. Lanfear, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Comanche Peak Nuclear Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

Access Authorization

(1) Tier I: All requirements

Tier II: All requirements

Tier III: All requirements

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirement

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with Title 10 of the Code of Federal Regulations, Part 50.54(p)(2) since the last performance of this IP and Physical Security Plan Revision 12 remains current.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) July 2020 through July

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On July 29, 2021, the inspectors presented the security baseline inspection results to Mr. John Dreyfuss and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

2018-001338

Miscellaneous

EVAL-2019-004

Security Site Access Authorization I Fitness For Duty (FFD)

Personnel Access Data System (PADS) Fatigue

Management

11/18/2019

SEC 121

Security Operating Procedure

006

SEC-120

Unescorted Access Authorization

013

STA-902

Access to CPNPP Site Areas

26

STA-910

Fitness For Duty Program

015

Procedures

STA-911

Behavioral Observation Program

007

71130.01

Self-Assessments

TR-2021-004446

71130.01 - Access Authorization Self-Assessment

Corrective Action

Documents

TR 2020-003898,

TR-2021-001397,

TR-2021-002326,

TR-2021-002922,

CR-2021-003005,

TR 2021-00492,

CR-2020-006324,

CR-2021-001792,

CR-2021-003087,

Various

Miscellaneous

EVAL-2020-006

Nuclear Oversight Audit, Physical Security

CPNPP Physical Security Plan

SEC -119

Protective Strategy

SEC-302

Personnel Identification, Key Card Badge Issuance and

Access Control

SEC-304

Vehicle and Material Control

SEC-306

Lock, Key, Password, Combinations and Key Card Badge

Control System

SEC-506

Security Equipment Maintenance, Testing and Calibration

SI 3.10

Alarm Stations

SI 3.11

Key Control

71130.02

Procedures

SI 3.2

Access Control

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

STA-308

Protection of Safeguards information and Other Controlled

Information Types

STA-902

Access to CPNPP Site Areas

STA-904

Vehicle and Material / Package Control

Self-Assessments

TR-2021-003371

71130.02 Self-Assessment - Access Control

71151

Miscellaneous

Performance

Indicator data

Security PI records (July 2019 -July 2021)