ML22346A086
| ML22346A086 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/13/2022 |
| From: | Vincent Gaddy NRC/RGN-IV/DORS/EB1 |
| To: | Peters K Vistra Operations Company |
| Gaddy V | |
| References | |
| IR 2022003 | |
| Download: ML22346A086 (3) | |
See also: IR 05000445/2022003
Text
December 13, 2022
Mr. Ken Peters
Senior Vice President
and Chief Nuclear Officer
Vistra Operations Company, LLC
P.O. Box 1002
Glen Rose, TX 76043
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT - ACKNOWLEDGMENT OF
RESPONSE TO INSPECTION REPORT 05000445/2022003 AND NOTICE OF
VIOLATION
Dear Mr. Peters:
On November 1, 2022, the U.S. Nuclear Regulatory Commission (NRC) cited Comanche Peak
Nuclear Power Plant for failure to restore compliance for a previous non-cited violation
documented as Non-Cited Violation 05000445/2019001-02 "Failure to Evaluate a Change to the
Facility DC Power System." The Notice of Violation, enclosed in NRC Inspection Report 05000445/2022003(ADAMS Accession No: ML22299A056), required you to respond in writing
within 30 days. Your response was received by letter dated December 1, 2022.
We have reviewed your response and find that it meets the requirements of Title 10 Code of
Federal Regulation (CFR) 2.201. We have no further questions at this time and will review the
implementation of your corrective action during a future inspection to determine whether full
compliance has been achieved.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
NRC's Agencywide Documents Access and Management System (ADAMS), accessible from
the NRCs Web Site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
Vincent G. Gaddy, Chief
Engineering Branch 1
Division of Operating Reactor Safety
Signed by Gaddy, Vincent
on 12/13/22
K. Peters
2
Docket Nos. 05000445 and 05000446
License Nos. NPF-87 and NPF-89
Distribution via LISTSERV
K. Peters
3
COMANCHE PEAK NUCLEAR POWER PLANT - ACKNOWLEDGMENT OF RESPONSE TO
INSPECTION REPORT 05000445/2022003 AND NOTICE OF VIOLATION DATED
DECEMBER 13, 2022
DISTRIBUTION:
SMorris, ORA
JMonninger, ORA
RLantz, DORS
MHay, DORS
DCylkowski, RC
VDricks, ORA
LWilkins, OCA
MFerdas, RIV/OEDO
DGalvin, NRR
AMoreno, RIV/OCA
RAlexander, RSLO
FRamirez, IPAT
GWerner, DORS
DProulx, DORS
JMelfi, DORS
JEllegood, DORS
NDay, DORS
LReyna, DORS
R4-DORS-IPAT
R4Enforcement
ADAMS ACCESSION NUMBER: ML22346A086
SUNSI Review
By:
ADAMS:
Yes
No
Sensitive
Non-Sensitive
Non-Publicly Available
Publicly Available
Keyword
OFFICE
SRI:DORS/EB1
BC:DORS/EB1
NAME
GGeorge
VGadddy
SIGNATURE
/RA/
DATE
12/12/2022
12/13/2022
OFFICIAL RECORD