July 20, 2023
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - FIRE PROTECTION TEAM INSPECTION REPORT 05000445/2023011 AND 05000446/2023011
Dear Ken Peters:
On June 29, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Comanche Peak Nuclear Power Plant, Units 1 and 2 and discussed the results of this inspection with Mr. Steven Sewell, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Fanta X. Sacko, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket No. 05000445 and 05000446 License No. NPF-87 and NPF-89
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000445 and 05000446
License Numbers:
Report Numbers:
05000445/2023011 and 05000446/2023011
Enterprise Identifier:
I-2023-011-0000
Licensee:
Vistra Operations Company LLC
Facility:
Comanche Peak Nuclear Power Plant, Units 1 and 2
Location:
Glen Rose, Texas
Inspection Dates:
June 12, 2023 to June 29, 2023
Inspectors:
S. Graves, Senior Reactor Inspector
J. Mejia, Reactor Inspector
N. Okonkwo, Reactor Inspector
Approved By:
Fanta X. Sacko, Chief
Engineering Branch 2
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a fire protection team inspection at Comanche Peak Nuclear Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)
The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).
- (1) Fire-rated Assemblies - Dampers
- (2) Water Curtains for Safe Shutdown Equipment Separation
- (3) Unit 2 Safety Related Chiller Units
- (4) Main Fire Control Panel
Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)
The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.
- (1) Control of fire impairments and compensatory measures.
- (2) Fire brigade training program met requirements and readiness of the licensee to combat fires.
Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)
The inspectors verified the following:
a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.
b. The adequacy of the design modification, if applicable.
c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.
d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.
e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.
- (1) LDCR FP-2019-001 - Update the Fire Protection Report (FPR) with changes applicable to adding the Chlorination Building
- (2) LDCR-FP-2021-001 - Revise Fire Protection Report to change periodic inspection of Appendix R Emergency Lights inside Unit-1 and Unit-2 containment
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On June 29, 2023, the inspectors presented the fire protection team inspection results to Mr. Steven Sewell, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05
Calculations
CN-TDA-11-9
Comanche Peak Units 1 & 2 Appendix R MSO
71111.21N.05
Calculations
EE-CA-0008-
3038
Unit 2 Class 1E 480V SWGRs. Feeder Cable Sizing
71111.21N.05
Calculations
EE-IE-2EB1
480VAC Switchgear CP2-EPSWEB-01 (2EB1) Bus Based
Calculation
71111.21N.05
Calculations
ER-ME-125
Thermal I Hydraulic Analysis of the Fire Safe Shutdown
Scenario
71111.21N.05
Calculations
ME-CA-0000-
1086
Fire Safe Shutdown Analysis for CPNPP Unit 1, Unit 2,
and Common
71111.21N.05
Calculations
X-EB-HV-19_01
Design Pressure for Fire Dampers closure under Air Flow
71111.21N.05
Corrective Action
Documents
CR-
2018-007852, 2020-001626, 2020-002451, 2020-004015,
20-004420, 2020-004471, 2020-004554,2020-005408,
20-008570, 2020-009364, 2021-008498, 2021-008595,
21-008596, 2021-008597, 2021-008598, 2022-004726,
22-008334, 2022-008431, 2022-008509, 2022-008644,
22-008829, 2023-001050, 2023-001932, 2023-001775,
20-000755, 2018-008411, 2023-003615, 2016-010291,
20-003638, 2023-001328, 2020-006686, 2023-002021,
21-004516, 2017-004635, 2015-009895, 2015-008133,
2015-004856
71111.21N.05
Corrective Action
Documents
IR-
20-004760, 2022-008189, 2023-004308
71111.21N.05
Corrective Action
Documents
TR-
21-008470
71111.21N.05
Corrective Action
Documents
Resulting from
Inspection
IR-2023-004308, IR-2023-004351,
TR-2023-004396, TR-2023-004077, TR2023-004308
71111.21N.05
Drawings
E1-0002
Main One Line Meter and Relay Diagram
71111.21N.05
Drawings
E2-0030, Sh. 62
Reactor Coolant Pumps 21, 22, 23 AND 2 Potential
Transformer Cabinet
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05
Drawings
E1-0001
Plant One Line Diagram Unit 1 & 2
71111.21N.05
Drawings
E1-2012, Sheet
AT
Electrical Control Building Fire Detection Plan EL 778'-0"
(For Test Purposes Only)
71111.21N.05
Drawings
E2-0004_A
6.9 KV Auxiliaries One Line Diagram, Safeguard Buses
71111.21N.05
Drawings
E2-0005
480V Auxiliaries One Line Diagram Safeguard Buses
71111.21N.05
Drawings
E2-0033, Sh.29
480V Switchgear Bus 2EB1 HVAC Centrifugal WTR
Chiller CP2-CHCICE-05 BKR 2CICE5 Schematic Diagram
71111.21N.05
Drawings
E2-0033, Sh.31
480V Switchgear Bus 2EB1 HVAC Centrifugal WTR
Chiller CP2-CHCICE-05 BKR 2CICE5 Schematic Diagram
71111.21N.05
Drawings
E2-0195, Sh. 5
HVAC Centrifugal Water Chiller Control Panel and Starter
TAG CP2-CHCICE-O5 Interconnection Diagram
71111.21N.05
Drawings
FPR-7
Fire Protection Report Auxiliary/Electrical Control Building
Common Plant at EL. 778'-0" and 790'-6"
71111.21N.05
Drawings
M1-1927
Fire Hazard Analysis Unit 1 Auxiliary/Electrical Control
Bldg EL 778'-0" and EL 790'-6"
71111.21N.05
Drawings
M1-1990
Fire Suppression Systems System Index Unit 1 And
Common Areas
71111.21N.05
Drawings
M1-1990, Sheet
134
Fire Suppression Systems Auxiliary Building North Half
Corridor EL 790'-6", Battery Room EL 792'-0", Chiller
Room and Chemical Storage Room EL 778'-0" - System
334.785.X081
71111.21N.05
Drawings
M1-1990, Sheet
134A
Fire Suppression Systems Auxiliary Building North Half
Corridor EL 790'-6", Battery Room EL 792'-0", Chiller
Room and Chemical Storage Room EL 778'-0" - System
334.785.X081
71111.21N.05
Drawings
M2-2311
Instrumentation & Control Diagram Ventilation Safety
Chilled Water System Channel 6700/6711, 6741
71111.21N.05
Engineering
Changes
4338
Install Sprinklers and Hangers for Water Curtain
71111.21N.05
Engineering
4380
Add two additional fire detectors in Unit 2 Safety Chiller
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Changes
Room
71111.21N.05
Engineering
Changes
DCA 51454
Fire Dampers installed in Ductwork
71111.21N.05
Engineering
Changes
DCN 4380
Fire Detectors required in Unit 2 Safety Chiller Room,
71111.21N.05
Engineering
Evaluations
ER-EA-008
Individual Plant Examination of External Events for Severe
Accident Vulnerabilities Comanche Peak Steam Electric
Station - INTERNAL FIRE ANALYSIS
71111.21N.05
Engineering
Evaluations
EV-CR-2017-
009814-2
FP-2019-001 Update the Fire Protection Report (FPR)
with changes applicable to adding the
Chlorination Building
8/21/2019
71111.21N.05
Miscellaneous
Comanche Peak Nuclear Power Plant Fire Protection
Report
71111.21N.05
Miscellaneous
Comanche Peak Fire PRA Summary
71111.21N.05
Miscellaneous
20 ABN 803
TOA Evaluation
Reactor Operator Actions - Averages
71111.21N.05
Miscellaneous
2nd QTR 2022
System Health Report - Fire Protection
71111.21N.05
Miscellaneous
4th QTR 2022
System Health Report - Fire Protection
71111.21N.05
Miscellaneous
DBD-ME-001
71111.21N.05
Miscellaneous
DBD-ME-020
Fire Safe Shutdown Analysis
71111.21N.05
Miscellaneous
DBD-ME-063
71111.21N.05
Miscellaneous
DBD-ME-104
Fire Detection System
71111.21N.05
Miscellaneous
Drill No. 22-14-04
Fire Drill Scenario - 3J07, RP Safety Building
11/08/2022
71111.21N.05
Miscellaneous
ER-EA-008
Individual Plant Examination of External Events for Severe
Accident Vulnerabilities
71111.21N.05
Miscellaneous
NRR-6949
Removal of Fire Protection Requirements from Technical
Specifications (GL 88-12)
11/16/1988
71111.21N.05
Miscellaneous
Technica1 Specifications, Comanche Peak Steam Electric
Station, Unit 1, Docket No. 50-445, Appendix-A to
License No. NPF-87
April 1990
71111.21N.05
Miscellaneous
Supplement No.
Safety Evaluation Report related to the operation of
Comanche Peak Steam Electric Station, Units 1 and 2
Docket Nos. 50-445 and 5O-446
April 1989
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05
Miscellaneous
Supplement No.
Safety Evaluation Report related to the Operation of
Comanche Peak Steam Electric Station, Units 1 and 2,
Docket Nos 50-445 and 50-446
April 1990
71111.21N.05
Miscellaneous
OWI-203-
18-1-8-23 U1, 18-1-8-23 U2, 19-5-14-23 U2, 19-5-15-23,
26-3-26-23, 33-1-1-23 U1, 34-1-1-23
71111.21N.05
Miscellaneous
TMVTM_CP-
0084-001
HVAC Dampers Actuators and Accessories-Vendor
Manual
71111.21N.05
Miscellaneous
TMVTM_CP-
0096A-001
Pacific Air Products -Vendor Manual
71111.21N.05
Procedures
ABN-803A
Response To A Fire In The Control Room Or Cable
Spreading Room
71111.21N.05
Procedures
ABN-901
Fire Protection System Alarms or Malfunctions
71111.21N.05
Procedures
ALM-1702B
Alarm Procedure Safety Chilled Water Chiller 2-06
71111.21N.05
Procedures
CN-TDA-11-9
Comanche Peak Units 1 & 2 Appendix R MSO
71111.21N.05
Procedures
71111.21N.05
Procedures
DBD-ME-311
Safety Chilled Water System
71111.21N.05
Procedures
EGT-153
HVAC Gravity & Fire Damper Testing
71111.21N.05
Procedures
ER-ME-125
Thermal / Hydraulic Analysis of the Fire Safe Shutdown
Scenario
71111.21N.05
Procedures
FIR-202
Fire Protection Inspections
71111.21N.05
Procedures
71111.21N.05
Procedures
FIR-302
FIRE DOOR TESTS AND INSPECTIONS
71111.21N.05
Procedures
FIR-307
Inspection of Sprinkler Systems
71111.21N.05
Procedures
FIR-311
Fire Rated Assembly Visual Inspection
71111.21N.05
Procedures
FPI-502
Electrical & Control Building Unit 1&2 Battery Rooms,
2'-0" Elev.
71111.21N.05
Procedures
FPI-510
Electrical & Control Building Chiller Pump Rooms
Elevation 778'-0"
71111.21N.05
Procedures
MSE-P1-7705
UNIT 1 Computer Room Halon Tank Test
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05
Procedures
MSE-G0-0020
Relay Calibration
71111.21N.05
Procedures
MSE-G0-6300
Breaker Removal and Installation
71111.21N.05
Procedures
MSE-PI-7705
Unit 1 Computer Room Halon Tank Test
71111.21N.05
Procedures
MSE-S0-6304
Westinghouse 480 Volt Air Circuit Breaker PM and
Surveillance Inspections.
71111.21N.05
Procedures
MSM-P0-0705
Fire Damper Inspection and Cleaning
71111.21N.05
Procedures
STA-426
Industry Operating Experience Program
71111.21N.05
Procedures
STA-722
71111.21N.05
Procedures
STA-723
Fire Protection System/Equipment Requirements
71111.21N.05
Procedures
STA-727
Fire Brigade
71111.21N.05
Procedures
STA-738
Fire Protection Systems/Equipment Impairments
71111.21N.05
Procedures
STI-214.01
Control Of Timed Operator Actions
71111.21N.05
Procedures
STI-421.01
Initiation of Issue Reports
71111.21N.05
Procedures
STI-421.02
Issue Report Reviews
71111.21N.05
Procedures
STI-422.01
Operability Determination Program.
71111.21N.05
Procedures
STI-422.04
Processing of Condition Reports
71111.21N.05
Procedures
STI-426.02
Processing Important OE, IERL3 & IERL4, INS & OPESS
Reports
71111.21N.05
Self-
Assessments
EVAL-2022-006
CPNPP Nuclear Oversight Audit Report - Fire Protection
Program
11/16/2022
71111.21N.05
Self-
Assessments
TR-2023-002231
Fire Protection Program Self-Assessment
04/05/20232
71111.21N.05
Work Orders
WO- 4767132, 5731708, 5761041, 5951939, 5953488,
5954289, 6011295, 21-940941, 22-382698, 21-940941,
5954289, 5953488, 21-609797, 22-508283, 5664058, 21-
581276, 5513273, 21-816222, 21-827111, 492470,
5102209, 5662179