Monthly Operating Repts for March 1996 for PBAPS
ML20107D938
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/31/1996
From: Hydrick L, Mitchell T
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9604190099
Download: ML20107D938 (15)


Text

l Psach Bottom Atomic Power Station A

IECO NUCLEAR ercot - <c - v 1848 Lay Road A UNIT Of PECO ENtRo Delta, PA 17314-9032 717 456 7014 April 15,1996 U.S. Nuclear Regulatory Commission Document Control Desk Washington DC 20555 Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of March 1996 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, Thomas N. Mitchell Vice President, Peach Bottom Atomic Power Station

]JN op TNM/ MEW /JGH/mdk Enclosures cc: B. W. Gorman, Public Service Electric & Gas W. P. Domsife, Commonwealth of Pennsylvania R. l. McLean, State of Maryland T. T. Martin, Administrator, Region 1, USNRC W. L. Schmidt, USNRC, Senior Resident inspector H. C. Schwemm, Atlantic Electric A. F. Kirby, Ill, Delmarva Power & Light INPO Records Center 19002G cnn 96-94032 9604190099 960331 PDR ADOCK 05000277

/

R PDR

,,/ 3 o

I

Y d

h i

bec:

63B Chesterbrook J. Lewis SMB3-7 -Peach Bottom Commitment Coordinator 62A Chesterbrook l

Correspondence Control Program 618 Chesterbrook D. B. Fetters 62C Chesterbrook i

E. J. Cullen S23 Main Office i

G. D. Edwards A41S - Peach Bottom i

A. A. Fulvio SMB4 Peach Bottom i

G. A. Hunger 62A Chesterbrook M. C. Kray 52A Chesterbrook 1

P Krippner ANI S.

Maingi PA DER C. J. McDermott S13 Main Office T. N. Mitchell SMB4 Peach Bottom i

i PBAPSISEG SMB4 Peach Bottom R. A. Kankus 62C Chesterbrook D. M. Smith 63C Chesterbrook C. M. Valera 63C 3 - Chesterbrook 4

G. J. Lengyel A41S - Peach Bottom M. E. Wamer SMB3 Peach Bottom

I PEACH COTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS

SUMMARY

March 1996 UNIT 2 Unit 2 began the month of March at 100% power. Unit 2 losses included: a 'B' RFP trip on March 4, scram time testing on March 21, and generator core monitor alarm on March 27. The l

unit operated at 100% power for the rest of the month except for one load drop for rod pattem adjustments made on March 11.

Unit 2 net generation for March was 815,817 MWH.

UNIT 3 Unit 3 began the month of March at 100% power. Unit 3 losses were minimal during the month.

The losses included load drops for a rod pattem adjustment on March 21 and generator core monitor alarm on March 27. The unit remained at 100% power for the rest of the month.

Unit 3 net generation for March was 830,760 MWH.

l 1

l l

l l

l l

l l

l I

(

I

Attachment to Monthly Operating l

Report for March 1996 i

UNIT 2 REFUELING INFORMATION 1.

Name of facility:

j Peach Bottom Unit 2 l

l 2.

Scheduled da'o for next refueling shutdown:

l Reload 11 scheduled for September 13,1996.

l 3.

Scheduled date for restart following refueling:

Restart following refueling forecast for October 20,1996.

4.

Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

Yes.

If answer is yes, what, in general, will these be?

1. Wide Range Neutron Monitoring System 2.10CFR50 Appendix J, Option B
3. Increase MCPR Value l

S.

Scheduled date(s) for submitting proposed licensing action and supporting information:

All three items have been submitted for review and approval.

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fue! design, new operating procedures:

l GE-13 Fuel Product Line will be utilized requiring a Tech Spec l

amendment.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2436 Fuel Assemblies,52 Fuel Rods r

.._.=-

Docket No. 50-277 Attachment to Monthly Operating l

Report for March 1996 i

Page 2 l

UNIT 2 REFUELING INFORMATION (continued) 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming l

the present capacity:

September 2004 without full core offload capability.

September 1998 with full core offload capability.

l l

4 a

l.

l Docket No. 50 278 i

Attachmer,t to i

Monthly Operating l

Report for March 1996 l

UNIT 3 REFUELING INFORMATION l

1 j

1.

Name of facility:

i Peach Bottom Unit 3 l

l 2.

Scheduled date for next refueling shutdown:

l Reload 11 scheduled for September 15,1997 l

3.

Scheduled date for restart following refueling l

l Restart following refueling scheduled for October 20,1997 4.

Will refueling or resumption of operation thereafter require a technical specification change or i

otherlicense amendment?

i N/A If answer is yes, what, in general, will these be?

l l

l S.

Scheduled date(s) for submitting proposed licensing action and supporting information:

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or l

supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A l

1 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2485 Fuel Assemblies,16 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

i e

Docket No. 50-278 Attachment to Monthly Operating Report for March 1996 Page 2 UNIT 3 REFUELING INFORMATION (Continued) l l

l 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

l September 2003 without full core offload capability, September 1999 with full core offload capability, l

l i

i i

I

AVERAGE DAILY POWER LEVEL 5

DOCKET NO. E3-277 UNIT PEACH BOTTOM UNIT 2

(

DATE APRIL 3,1996 p

COMPANY PECO ENERGYCOMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSICN L

PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-4383 l

t MONTH MARCH,1996

[

t f

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET)

~h 1

1115 17 1127 l

2 1115 18 1107 I

I 3

1123 19 1118 j

i 4

1004 20 1112 3

5 1091 21 1112 f

6 1119 22 1016 7

1114 23 1115 8

1114 24 1106 9

1110 25 1105 10 1101 26 1100 11 1103 27 983 12 1112 28 1058 13 1120 29 1092

}

14 1111 30 1084 l

1 5

4 15 1115 31 1077 16 1115 r.

AVERAGE DAILY POWER LEVEL DOCKET NO. 50-278 UNIT PEACH BOTTOM UNIT 3 i

DATE APRIL 3,1996 COMPANY PECO ENERGY COMPANY

~

L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION 1

PEACH BOTTOM ATOM'.C POWER STATION TELEPHONE (717)456-4383 j

MONTH MARCH,1996 h

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL j

(MWE-NET)

(MWE-NET) i 1

1122 17 1130 2

1122 18 1118 3

1130 19 1121 f

I 4

1117 20 1119 5

1126 21 1115 l

6 1122 22 1115 7

1130 23 1121 8

1121 24 1121 9

1125 25 1120

(

10 1121 26 1120 11 1126 27 1018

?'

12 1122 28 1057 1

13 1126 29 1117 14 1122 30 1125

(

i 15 1121 31 1117 16 1126 I

i i

i 1

b l

j OPERATING DATA REPORT DOCKET NO. 50 - 277 i

DATE APRIL 3,1996 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE ~ (717)456-4383 OPERATING STATUS

1. UNIT NAME:

OTTOM UNIT.2 PEACH B -

g

2. REPORTING PERIOD: __

MARCH,1996,

3. LICENSED THERMAL POWER (MWT) __

3458

4. NAMEPLATE RATING (GROSS MWE):

1221

5. DESIGN ELECTRICAL RATING (NET MWE): _

1119_

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

_ _ _ 1159

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1093 l

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:

i

9. POWER LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE):

i I

10. REASONS FOR RESTRICTIONS,IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 2,184 190,584
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,184.0 124,779.5 l
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 1
14. HOURS GENERATOR ON-LINE 744.0 2,184.0 120,785.2 l

f

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 I

i

16. GROSS THERMAL ENERGY GENERATED (MWH) 2,526,703 7,382,253 364.958.296

}

i j

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 839,100 2,453,100 119.992,890

}

1

18. NET ELECTRICAL ENERGY GENERATED (MWH) 815.817 2,385,7d6 115,191,682 4

PAGE 1 OF 2 f

OPERATING DATA REPORT (CONTINUED)

DOCKET NO.

50 -277 DATE-APRIL 3,1996 THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 %

100 0 %

63.4 %

20. UNIT AVAILABILITY FACTOR 100.0 %

100.0 %

63.4 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 100.3 %

99.9 %

57.3 %

22. UNIT CAPACITY FACTOR (USING DER NET) 98.0 %

97.6 %

56.4 %

23. UNIT FORCED OUTAGE RATE

.0 %

.0 %

12.1 %

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

Refuehng outage schedule to begin 9/13S6, Duraten 37 days

25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):

FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18f74 COMMERCIAL OPERATION 07/05/74 I

i i

i PAGE 2 OF 2

OPERATING DATA REPORT DOCKET NO. 50 -278 DATE APRIL 3,1996 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS

1. UNIT NAME:. - -.. -....

--PEA.C. H. B. O.T. TOM... U. N...I.T_. 3

2. REPORTING PERIOD: _ _. _ _ _ _ _

MARCHJ996,

3. LICENSED THERMAL POWER (MWT): _ _ _ _ _ _ _ _ _ _

3458_

4. NAMEPLATE RATING (GROSS MWE):

_._ _ _._,__ _ 1221

5. DES!GN ELECTRICAL RATING (NET MWE):

1119

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

1159

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

_ _ 1_093

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS,IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 2,184 186,480
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,184.0 123,471 2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 744.0 2,134 0 119,942.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,559,112 7,263,662 356,950,120
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 852,100 2,402,700 117,022,132
18. NET ELECTRICAL ENERGY GENERATED (MWH) 830,760 2,342,240 112,356,092 I

PAGE 1 OF 2

OPERATING DATA REPORT (CONTINUED)

DOCKET NO.

50 - 278 DATE APRIL 3,1996 THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 %

97.7 %

64.3 %

20. UNIT AVAILABILITY FACTOR 100.0 %

97.7 %

64.3 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 102.2 %

98.1 %

581 %

22. UNIT CAPACITY FACTOR (USING DER NET) 99.8 %

95.8 %

56.5 %

23. UNIT FORCED OUTAGE RATE

.0 %

2.3 %

10.9 %

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT THE END OF REPORT PERIOD ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):

FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 IN'TIAL ELECTRICITY 09,01/74 COMMERCIAL OPERATION 12/23,74 PAGE 2 OF 2

UNIT SHUTDOWNS AND POWER REDUCTIONS

.. ~

I DOCKET NO. 50-277 UNIT NAME PEACH BOTTOM UNIT 2 l

DATE APRIL 12.1996 COMPLETED BY PECO ENERGY COMPANY I

L P. HYDRICK I

BUSINESS SERVICES I

SITE SUPPORT DIVIS!ON 1

PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH MARCH.1996 TELEPHONE (717)456-4383

[

t METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE I

TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO I

NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECURRENCE 10 960321 S

20 0 H

4 RB CONROD SCRAM TIME TESTING REACTOR NOT SHUT DOWN 11 960327 F

25 0 H

4 RC INSTRU GENERATOR CORE MONITOR ALARM 4

REACTOR NOT SHUT DOWN l

t 8

960304 F

16.0 H

4 CH INSTRU B RFP TRIPPED (VIBRATION PROBE SIGNAL CABLE t

BUMPED)

I REACTOR NOT SHUT DOWN I

r 9

960311 S

40 H

4 RB CONRCD ROD PATTERN ADJUSTMENT REACTOR NOT SHUT DOWN TOTAL HOURS 65.0 t

[

r i

i k

l-(1)

(2)

(3)

(4)

[

F-FORCED REASON METHOD EXHlBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA t

B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE l

C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) f D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN)

DOCKET NO. 50-278 UNIT NAME PEACH BOTTOM UNIT 3

[

DATE APRIL 3,1996 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES

(

SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH MARCH 1996 TELEPHONE (717)456-4383

_{

4 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE 7

TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECURRENCE 8

960321 S

4.0 H

4 RB CONROD ROD PATTERN ADJUSTMENT REACTOR NOT SHUT DOWN t

9 960327 F

25.0 H

4 RC INSTRU GENERATOR CORE MONITOR ALARM i

REACTOR NOT SHUT DOWN i

TOTAL HOURS 29.0 i

P t

i l

I L

l (1)

(2)

(3)

(4)

F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST.

2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE 3

C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG4161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F-ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

EXHIBIT l-SAME SOURCE 7

H - OTHER (EXPLAIN)

I

. -