ML20116M170

From kanterella
Revision as of 22:14, 12 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised MOR for June 1996 for Peach Bottom Unit 3
ML20116M170
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/30/1996
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20116M155 List:
References
NUDOCS 9608200057
Download: ML20116M170 (1)


Text

- _.. _..

CORRECTIONS TO JUNE 1996 DATA DOCKET No.

50-278 UNIT:

Peach Bottom Unit 3

1. Correction to OPERATING DATA REPORT j
16. GROSS THERMAL ENERGY GENERATED (MWH) = 1,880,037 2.

Correction to UNIT SHUTDOWNS AND POWER REDUCTIONS Number 16 Duration (Hours) = 107 1

i T

I 1

9608200057 960808 PDR ADOCK 05000277 R

PDR i