ML20116M152

From kanterella
Jump to navigation Jump to search
Forwards MORs for Jul 1996 for Peach Bottom Units 2 & 3 and Rev to MOR for June 1996 for Peach Bottom Unit 3
ML20116M152
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/08/1996
From: Warner M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20116M155 List:
References
NUDOCS 9608200053
Download: ML20116M152 (1)


Text

l

\\

f Psach Bottom Atomic Powsr Station

.s

.* v PECO NUCLEAR nco n - com-1848 Lay noad A UNir or PECO ENac;y Delta. PA 17314-9032 717 456 7014 l

l l

August 8,1996 i

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of July 1996 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4. Also enclosed is a correction to the monthly operating report data. The correction is for Peach Bottom Unit 3 data for the month of June 1996.

Sincerely, FA I

Mark E. Warner Director, Site Engineering Peach Bottom Atomic Power Station sj64 MEW /JGH:lph Enclosures I

cc:

B.W. Gorman, Public Service Electric & Gas l

W.P. Domsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland i

T.T. Martin, Administrator, Region I, USNRC l

W.L. Schmidt, USNRC, Senior Resident Inspector H.C. Schwemm, Atlantic Electric l

A.F. Kirby, Ill, Delmarva Power & Light i

INPO Records Center i

T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station t.

'f 20000a

\\

9608200053 960808

)

PDR ADOCK 05000277 R

PDR ccn 96-14068

!