Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-277/93-27 & 50-278/93-27
ML20059J528
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/17/1994
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 9402010058
Download: ML20059J528 (3)


Text

{{#Wiki_filter:n, .o 4~- ~

     . .. )
*

Cl i 7 ;3; Docket Nos. 50-277 50-278 Mr. D. Senior Vice President-Nuclear PECO Energy Nuclear Group Headquarters Correspondence Control Desk P. O. Box 195 Wayne, Pennsylvania 19087-0195

      ;

Dear Mr. Smith:

' SUBJECT: Reply to NRC Combined Inspection Nos. 50-277/93-27; 50-278/93-27 t

 (Section 6.0)

This letter refers to your December 23,1993 correspondence, in response to our November 24,1993 letter.

Thank you for informing us of the corrective and preventive actions documented in your letter. These actions will be examined during a future inspection of the Peach Bottom Atomic Power Station radiological controls program.

Your cooperation with us is appreciated.

Sincerely, Origird Si 2ned By '!

      -

James H. Joyner James H. Joyner, Chief Facilities Radiological Safety and Safeguards Branch Division of Radiation Safety and  ; Safeguards  ;

      .

i i l Enclosures: Response to NRC Inspection Report No. 50-277/93-27; 50-278/93-27 y, == l OFFICIAL RECORD COPY

     -
     ' ,6 -

9402010058-940117 A I PDR ADOCK 05000277 I L"* i G pon j

. .. . . .. . - - - ______ _ __ -__ ______ __ _ __
.
..

PECO Energy 2 cc w/ encl:

 .J. Doering, Chairman, Nuclear Review Board  {

G. Rainey, Vice President, Peach Bottom Atomic Power Station l' ! G. Cranston, General Manager, Nuclear Engineering Division . C. Schaefer, Extemal Operations - Nuclear, Delmarva Power & Light Co.

G. Edwards, Plant Manager, Peach Bottom Atomic Power Station A. J. Wasong, Manager, Experience Assessment G. A. Hunger, Jr., Manager, Licensing Section J. W. Durham, Sr., Senior Vice President and General Counsel J. A. Isabella, Director, Generation Projects Department, Atlantic Electric B. W. Gonnan, Manager, External Affairs l R. McLean, Power Plant Siting, Nuclear Evaluations D. Poulsen, Secretary of Harford County Council R. Ochs, Maryland Safe Energy Coalition J. H. Walter, Chief Engineer, Public Service Commission of Maryland l Public Document Room (PDR) Local Public Document Room (LPDR) Nuclear Safety Information Center (NSIC) , K. Abraham, PAO (2) l NRC Resident Inspector l Commonwealth of Pennsylvania

     '

TMI - Alert (TMIA) l l l l l l l

'
OFFICIAL RECORD COPY

L J l m. .

 .
   ..

_ _______

    .
.
.
    "
' PECO Energy   3 bec w/ encl:

Region I Docket Room (with concurrences) j

    !

bec w/ encl: (Via E-Mail) ' V. McCire, OEDO Joseph Shea, NRR C. Miller, PDI-2, NRR M. Shannon, ILPB l-j

    -

t

    .

i t i

    ,

CONCURRENCES: i

   ~

jg ' ._ .[[ s t Eckert 6 ~ ores Joyner ;

    !

RI:FRPS RI:FRPS RI:FRSSB . 1/ // /94 - 1/n /94 1// 7/94

I

, OFFICIAL RECORD COPY ! i l.

- . -

   -

CCN 9314174

. .g ; ~. ,

.

. v5 PIIILADELPIIIA ELECTRIC COMPANY PEACil BOTIU51 ATONilC POWER STATION
-

R. D.1, Box 208 Delta, Pennsylvania 17314 rama sorrow-use rona or rxcrutscs p17) 456-7014 December 23, 1993 U.S. Nuclear Regulator / Commission Attn: Document Control Desk Washington, DC 20555

Dear Sir:

Subject: Peach Bottom Atomic Power Station - Units 2 & 3 Response to Combined inspection Report No. 50-277/93-27; 50-278/93-27

       '

in your cover letter of the subject inspection report, you noted a weakness in the ability to provide emergency response information in accordance with 49 CFR 172.

Please find attached the corrective actions taken and planned to address this area. , If you have any questions or require additional information, please do not hesitate to contact us. 4

Sincerely, f G. R. Rainey Vice President GRR/RKS: bah Attachment

       '

cc: R. A. Burricelli, Public Service Electric & Gas W. P. Dornsife, Commonwealth of Pennsylvania W. L Schmidt, Senior Resident inspector, US NRC  ; T. T. Martin, Administrator, Region I, US NRC R.1. McLean, State of Maryland - H. C. Schwemm, Atlantic Electric C. D. Schaefer, DelMarVa Power

       .

F

 %'} vi,%v 5^   -
    ,

v 9 ,- . , Response to inspection Report 93-27/27 During an NRC Radiological Controls inspection, the inspector conducted an off-hours test to evaluate the ability of control room personnel to provide information in accordance with 49 CFR 172, " Hazardous Materials Tables and Hazardous Materials Communications Regulations". Additional guidance in this area is provided in NRC Information Notice 92-62, " Emergency Response Information Requirements for Radioactive Material Shipments". Although the call demonstrated satisfactory capability to provide appropriate emergency response information, several aspects of the process need to be re-evaluated to assure proficiency in responding to this type of an event.

These areas concern providing the appropriate emergency response information within 15 minutes, maintaining communication linkage until the appropriate information is provided, and ensuring that shipment manifest information is readily available to the individuals that provide off-hours emergency response information for radioactive material or waste shipments.

To address these issues, appropriate control room personnel were contacted to heighten awareness of procedural and response time requ!rements with respect to emergency response information. Shipping manifest cover sheets and survey forms are now being provided to the Shift Managers. This information is now easily accessible in the Shift Manager's Office.

The ChemicalTransportation Emergency Center (CHEMTREC) was contacted and evaluated to provide and monitor the 24 hour emergency response telephone number as required by the Department of Transportation. After the appropriate emergency response information is provided to CHEMTREC, radioactive waste material shipment marJfests will contain CHEMTREC's telephone number as the emergency response contact.

CHEMTREC will be implemented as the emergency response information provider by January 31,1994.

Radioactive Waste Procedure RW-C-231 " Emergency Response to Off-site Radwaste and Radioactive Material Transportation Acc'de".ts" will be changed to a

"Special Event" procedure. This will help to ensure that required notifications are made in a prompt and efficient manner so as to enhance implementation of emergency response in the field. This procedure re-classification will be completed by March 31, 1994. Additionally, the Reportability Manual will be revised to include radioactive waste and material shipment accidents. This will also enhance the ability of Operations personnel to make the appropriate reporting requirements. This addition will be completed by June 30,1994.

}}