Responds to IE Bulletin 85-001 Re Steam Binding of Auxiliary Feedwater Pumps.Procedures for Monitoring Fluid Conditions within Feedwater Sys to Identify Binding & for Restoring Sys to Operable Status If Binding Occurs Provided
ML20154J794
Person / Time
Site: Rancho Seco
Issue date: 02/27/1986
From: Reinaldo Rodriguez
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
IEB-85-001, IEB-85-1, RJR-86-086, RJR-86-86, TAC-64359, NUDOCS 8603110053
Download: ML20154J794 (2)


Text

-

C ,

esuu. SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street. P.O. Box 1583o, Sacramento CA 958521830,(916) 452 3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CAllFORNIA RJR 86-086 February 27, 1986 J B MARTIN ADMINISTRATOR S; U S NUCLEAR REGULATORY COMMISSION REGION V dj [ _

0FFICE OF INSPECTION AND ENFORCEMENT ,w' , M 1450 MARIA LANE SUITE 210 0 w Ilr3 WALNUT CREEK CA 94596 , g to RESPONSE TO IE BULLETIN 85-01: c)

STEAM BINDING OF AUXILIARY FEEDWATER (AFW) PUMPS The District has developed and implemented procedures for monitoring the fluid conditions within the AFW system to identify steam binding and for restoring the AFW system to operable status should steam binding occur. These procedures were requested in IE Bulletin 85-01.

The procedure for monitoring the fluid conditions is a portion of surveillance procedure 200.01. This procedure requires the touching of the pipes leading from auxiliary feed pumps P-318 and P-319 on a per shift basis. This revision was effective as of February 2, 1986. Specific training is not required for this procedure change.

The procedure for restoring the AFW system to operable status should steam binding occur, is a portion of the AFW system operating procedure, A.51. This revision was effective on January 13, 1986. Training on this procedure will be completed by March 14, 1986.

The Rancho Seco AFW system has been designed to minimize the likelihood of steam binding. The procedures developed formalize existing District practice to further reduce the possibility of steam binding rendering the AFW system inoperable.

'~~ 9403110053 SMM227 PDR ADOCK 05000312 PDR Ih G

L JEM/

r .

RJR 86-086 J B Martin February 27, 1986 The following estimates are provided for your information:

Staff time to perform requested review and testing: 145 hours0.00168 days <br />0.0403 hours <br />2.397487e-4 weeks <br />5.51725e-5 months <br />

. Staff time to prepare requested documentation: 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> If you have any questions, please contact Robert Little at (916) 732-6021.

tW R.J.RDRIGUk ASSISTANT GENE AL MANAGER, NUCLEAR Sworn to and subscribed before me this O day of February , 1986.

._mem_m____. e l j-rg PATRICIA K. GEISLER :j

=v . Not Ativ rer.t it- cAi mmNI A k[, '+1' rit!\' Cit' AI. OF1 ICE 'N '

' Vt' SAclt.u!MNTO COUNTY My bmrnissiori Ecires Fetreary 16, 1983 0

.._ _ g.wwuumsam e l