Other: ML19282C737, ML20027D070, ML20154G705, ML20154J794, ML20205H758, ML20210K842, ML20212D134, ML20212D154, ML20212D166, ML20236M353, ML20236M366, ML20236P351, NL-86-672, Forwards Rev 1 to A-5415, Design Basis Rept, as Requested. Review of Current Emergency Feedwater Initiation & Control Sys Design Should Address Inconsistencies w/1983 SER Not Technical Adequacy
|
MONTHYEARML19282C7371979-04-27027 April 1979 Informs That Facility Will Shut Down 790428 to Complete safety-related Actions.Also Lists Commitments to Actions Per Ofc of Nuclear Reactor Regulation 790425 Status Rept.Info Re Auxiliary Feedwater Sys Upgrade & Guidelines Encl Project stage: Other ML20027D0701982-10-22022 October 1982 Comments on NRC Safety Evaluation of NUREG-0737,Items II.E.1.2.1 & II.E.1.2.2 Re Auxiliary Feedwater Automatic Initiation & Flow Indication,Transmitted by . Safety Grade Flow Instrumentation Info Due by Jan 1983 Project stage: Other ML20137H9091986-01-17017 January 1986 Summarizes Expanded Scope of Living Schedule to Accommodate Accelerated Efforts to Install Majority of Emergency Feedwater Initiation & Control Sys During Upcoming Cycle 8 Outage,Per & 851023 Meeting Project stage: Meeting ML20154J7941986-02-27027 February 1986 Responds to IE Bulletin 85-001 Re Steam Binding of Auxiliary Feedwater Pumps.Procedures for Monitoring Fluid Conditions within Feedwater Sys to Identify Binding & for Restoring Sys to Operable Status If Binding Occurs Provided Project stage: Other ML20154G7051986-03-0303 March 1986 Provides Functional Description of Emergency Feedwater Initiation & Control Cycle 8 Refueling Outage Scope,Per Rj Rodriguez .Significant Changes in Design to Accommodate Resource/Equipment Lead Time Listed Project stage: Other ML20210K8421986-09-12012 September 1986 Rev 1 to Design Basis Rept Project stage: Other NL-86-672, Forwards Rev 1 to A-5415, Design Basis Rept, as Requested. Review of Current Emergency Feedwater Initiation & Control Sys Design Should Address Inconsistencies w/1983 SER Not Technical Adequacy1986-09-26026 September 1986 Forwards Rev 1 to A-5415, Design Basis Rept, as Requested. Review of Current Emergency Feedwater Initiation & Control Sys Design Should Address Inconsistencies w/1983 SER Not Technical Adequacy Project stage: Other ML20212D1541986-11-14014 November 1986 Rev 2 to Design Basis Rept Project stage: Other ML20212D1661986-12-0505 December 1986 Rev 1 to Emergency Feedwater Initiation & Control Auxiliary Feedwater Sys Description Project stage: Other ML20212D1341986-12-0505 December 1986 Proposed Tech Spec Sections 3.1, RCS, 3.4, Steam & Power Conversion Sys, 3.5, Instrumentation Sys, 4.1, Operational Safety Review & 4.8, Auxiliary Feedwater Pump Periodic Testing Project stage: Other ML20212D1131986-12-0505 December 1986 Application to Amend License DPR-54,revising Listed Tech Specs,Including Sections 3.1, RCS, 3.4, Steam & Power Conversion Sys & 3.5, Instrumentation Sys. W/13 Oversize Figures.Fee Paid Project stage: Request ML20205H7581987-03-26026 March 1987 Proposed Tech Specs,Clarifying Limiting Conditions of Operations & Surveillance Requirements for Emergency Feedwater Initiation & Control Sys Time Delay Modules Project stage: Other ML20205H6901987-03-26026 March 1987 Rev 1 to Proposed Amend 152 to License DPR-54,clarifying Limiting Conditions of Operation & Surveillance Requirements for Emergency Feedwater Initiation & Control Sys.Description of Proposed Changes & Safety Analysis Encl Project stage: Request ML20236M3661987-06-11011 June 1987 Rev 3 to Design Basis Rept Project stage: Other ML20236M3531987-07-31031 July 1987 Proposed Tech Specs,Clarifying Proposed Limiting Conditions of Operation & Addl Surveillance Requirements for Emergency Feedwater Initiation & Control Sys Project stage: Other ML20236M3391987-07-31031 July 1987 Application for Amend to License DPR-54,consisting of Rev 2 to Proposed Amend 152,clarifying Proposed Limiting Conditions of Operation & Addl Surveillance Requirements for Emergency Feedwater Initiation & Control Sys Project stage: Request ML20236P3511987-11-0606 November 1987 Proposed Tech Specs Re Limiting Condition for Operation of Instrumentation Sys Project stage: Other ML20236P3411987-11-0606 November 1987 Supplemental Application for Rev 2 to Proposed Amend 152 to License DPR-54,revising Tech Specs Re Limiting Conditions for Operation of Instrumentation Sys Project stage: Supplement ML20234F5711987-12-24024 December 1987 Forwards Formal Responses to NRC Questions from 871215 Exit Meeting at Conclusion of Insp of Util Response to IE Bulletin 79-27 Project stage: Meeting ML20148C6301988-01-0505 January 1988 Forwards Amend 93 to License DPR-54 & Safety Evaluation. Amend Revises Criteria Re Auxiliary Feedwater Sys & Adds Specific Requirements Associated W/Emergency Feedwater Instrumentation & Control Sys Project stage: Approval 1986-09-12
[Table View] |
Text
-
C esuu.
SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street. P.O. Box 1583o, Sacramento CA 958521830,(916) 452 3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CAllFORNIA RJR 86-086 February 27, 1986 J B MARTIN ADMINISTRATOR S;
U S NUCLEAR REGULATORY COMMISSION REGION V dj
[
0FFICE OF INSPECTION AND ENFORCEMENT
,w' M
Ilr3 1450 MARIA LANE SUITE 210 0
w
g WALNUT CREEK CA 94596 to RESPONSE TO IE BULLETIN 85-01:
c)
STEAM BINDING OF AUXILIARY FEEDWATER (AFW) PUMPS The District has developed and implemented procedures for monitoring the fluid conditions within the AFW system to identify steam binding and for restoring the AFW system to operable status should steam binding occur.
These procedures were requested in IE Bulletin 85-01.
The procedure for monitoring the fluid conditions is a portion of surveillance procedure 200.01.
This procedure requires the touching of the pipes leading from auxiliary feed pumps P-318 and P-319 on a per shift basis.
This revision was effective as of February 2, 1986.
Specific training is not required for this procedure change.
The procedure for restoring the AFW system to operable status should steam binding occur, is a portion of the AFW system operating procedure, A.51.
This revision was effective on January 13, 1986.
Training on this procedure will be completed by March 14, 1986.
The Rancho Seco AFW system has been designed to minimize the likelihood of steam binding.
The procedures developed formalize existing District practice to further reduce the possibility of steam binding rendering the AFW system inoperable.
'~~ 9403110053 SMM227 PDR ADOCK 05000312 Ih G
PDR JEM/
L
r RJR 86-086 J B Martin February 27, 1986 The following estimates are provided for your information:
Staff time to perform requested review and testing:
145 hours0.00168 days <br />0.0403 hours <br />2.397487e-4 weeks <br />5.51725e-5 months <br /> Staff time to prepare requested documentation:
80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> If you have any questions, please contact Robert Little at (916) 732-6021.
tW R.J.RDRIGUk ASSISTANT GENE AL MANAGER, NUCLEAR Sworn to and subscribed before me this O day of February
, 1986.
._mem_m____.
e
- j l j-rg PATRICIA K. GEISLER
=v
. Not Ativ rer.t it-cAi mmNI A k[,
'+1 rit!\\' Cit' AI. OF1 ICE 'N
' Vt' SAclt.u!MNTO COUNTY My bmrnissiori Ecires Fetreary 16, 1983 0
.._ _ g.wwuumsam e l