Letter Sequence Supplement |
|---|
|
Results
Other: ML19282C737, ML20027D070, ML20154G705, ML20154J794, ML20205H758, ML20210K842, ML20212D134, ML20212D154, ML20212D166, ML20236M353, ML20236M366, ML20236P351, NL-86-672, Forwards Rev 1 to A-5415, Design Basis Rept, as Requested. Review of Current Emergency Feedwater Initiation & Control Sys Design Should Address Inconsistencies w/1983 SER Not Technical Adequacy
|
MONTHYEARML19282C7371979-04-27027 April 1979 Informs That Facility Will Shut Down 790428 to Complete safety-related Actions.Also Lists Commitments to Actions Per Ofc of Nuclear Reactor Regulation 790425 Status Rept.Info Re Auxiliary Feedwater Sys Upgrade & Guidelines Encl Project stage: Other ML20027D0701982-10-22022 October 1982 Comments on NRC Safety Evaluation of NUREG-0737,Items II.E.1.2.1 & II.E.1.2.2 Re Auxiliary Feedwater Automatic Initiation & Flow Indication,Transmitted by . Safety Grade Flow Instrumentation Info Due by Jan 1983 Project stage: Other ML20137H9091986-01-17017 January 1986 Summarizes Expanded Scope of Living Schedule to Accommodate Accelerated Efforts to Install Majority of Emergency Feedwater Initiation & Control Sys During Upcoming Cycle 8 Outage,Per & 851023 Meeting Project stage: Meeting ML20154J7941986-02-27027 February 1986 Responds to IE Bulletin 85-001 Re Steam Binding of Auxiliary Feedwater Pumps.Procedures for Monitoring Fluid Conditions within Feedwater Sys to Identify Binding & for Restoring Sys to Operable Status If Binding Occurs Provided Project stage: Other ML20154G7051986-03-0303 March 1986 Provides Functional Description of Emergency Feedwater Initiation & Control Cycle 8 Refueling Outage Scope,Per Rj Rodriguez .Significant Changes in Design to Accommodate Resource/Equipment Lead Time Listed Project stage: Other ML20210K8421986-09-12012 September 1986 Rev 1 to Design Basis Rept Project stage: Other NL-86-672, Forwards Rev 1 to A-5415, Design Basis Rept, as Requested. Review of Current Emergency Feedwater Initiation & Control Sys Design Should Address Inconsistencies w/1983 SER Not Technical Adequacy1986-09-26026 September 1986 Forwards Rev 1 to A-5415, Design Basis Rept, as Requested. Review of Current Emergency Feedwater Initiation & Control Sys Design Should Address Inconsistencies w/1983 SER Not Technical Adequacy Project stage: Other ML20212D1541986-11-14014 November 1986 Rev 2 to Design Basis Rept Project stage: Other ML20212D1661986-12-0505 December 1986 Rev 1 to Emergency Feedwater Initiation & Control Auxiliary Feedwater Sys Description Project stage: Other ML20212D1341986-12-0505 December 1986 Proposed Tech Spec Sections 3.1, RCS, 3.4, Steam & Power Conversion Sys, 3.5, Instrumentation Sys, 4.1, Operational Safety Review & 4.8, Auxiliary Feedwater Pump Periodic Testing Project stage: Other ML20212D1131986-12-0505 December 1986 Application to Amend License DPR-54,revising Listed Tech Specs,Including Sections 3.1, RCS, 3.4, Steam & Power Conversion Sys & 3.5, Instrumentation Sys. W/13 Oversize Figures.Fee Paid Project stage: Request ML20205H7581987-03-26026 March 1987 Proposed Tech Specs,Clarifying Limiting Conditions of Operations & Surveillance Requirements for Emergency Feedwater Initiation & Control Sys Time Delay Modules Project stage: Other ML20205H6901987-03-26026 March 1987 Rev 1 to Proposed Amend 152 to License DPR-54,clarifying Limiting Conditions of Operation & Surveillance Requirements for Emergency Feedwater Initiation & Control Sys.Description of Proposed Changes & Safety Analysis Encl Project stage: Request ML20236M3661987-06-11011 June 1987 Rev 3 to Design Basis Rept Project stage: Other ML20236M3531987-07-31031 July 1987 Proposed Tech Specs,Clarifying Proposed Limiting Conditions of Operation & Addl Surveillance Requirements for Emergency Feedwater Initiation & Control Sys Project stage: Other ML20236M3391987-07-31031 July 1987 Application for Amend to License DPR-54,consisting of Rev 2 to Proposed Amend 152,clarifying Proposed Limiting Conditions of Operation & Addl Surveillance Requirements for Emergency Feedwater Initiation & Control Sys Project stage: Request ML20236P3511987-11-0606 November 1987 Proposed Tech Specs Re Limiting Condition for Operation of Instrumentation Sys Project stage: Other ML20236P3411987-11-0606 November 1987 Supplemental Application for Rev 2 to Proposed Amend 152 to License DPR-54,revising Tech Specs Re Limiting Conditions for Operation of Instrumentation Sys Project stage: Supplement ML20234F5711987-12-24024 December 1987 Forwards Formal Responses to NRC Questions from 871215 Exit Meeting at Conclusion of Insp of Util Response to IE Bulletin 79-27 Project stage: Meeting ML20148C6301988-01-0505 January 1988 Forwards Amend 93 to License DPR-54 & Safety Evaluation. Amend Revises Criteria Re Auxiliary Feedwater Sys & Adds Specific Requirements Associated W/Emergency Feedwater Instrumentation & Control Sys Project stage: Approval 1986-09-12
[Table View] |
Text
m 1
j YhSMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT O P. O. Box 15830, Sacramento CA 95852-1830,{916) 452 3211 i
AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA NOV 0 61987 l
AGM/NPP 87-366 l
l I
U. S. Nuclear Regulatory Commission Attn:
Frank J. Miraglia, Jr.
l Associate Director for Projects Phillips Building 7920 Norfolk Avenue
-Bethesda, MD 20014 DOCKET NO. 50-312' RANCHO SECO NUCLEAR GENERATING STATION LICENSE NO. DPR-54 l
PROPOSED AMENDHENT N0. 152, REVISION 2, SUPPLEMENT 1
)
I
Dear Mr. Miraglia:
I Based on discussions between the District and NRC, the District supplements the July 31, 1987 submittal of Proposed Amendment 152, Revision 2.
The l
following changes have been made.
4 1
Action statements for operability of EFIC system components deleted q
from specification 3.5.1.2 and added to Table 3.5.1-1.
j l
Note for testing added to Table 3.5.1-1.
j Attached are replacement Technical Specification pages incorporating these changes. The Safety Analysis and no significant har.ards consideration in the District's July 31, 1987 submittal of Proposed Amendment 152, Revision 2, are
]
not changed or affected by this supplement.
)
l l
8711170253 871106 PDR ADOCK 05000312 P
PDR
\\
~
' RANCHO SECO NUCLEAR GENERATING STATION O 1444o Twin Cities Road, Herald, CA 95638-9799;(209) 333-2935 l
J
wm a,
dI i
e k
2 1
.O 5
,.I 1
AGM/NPP 87-366
~4 F.J? Miraglia,.Jr.
4 NOV.0 6 1987 lr, Please contact me-if you have any ' questions. Members of your staff with questions; requiring additional information or clarification may contact Mr.
} ',-
- Robert Roehler at (916) 452-3211,. extension 4918.
4
[ Sincerely,
.w i
4 Joseph-F. Fi' lit.
r
-Assistant. General Manager, i
.y Nuclear Power Production-Sworn.to.and subscribed ~before me this M day of November, 1987.
AAN f. ~ ~ W U
hNotaryPub1ic OFFICIAL SEAL Attachment JUDY E. LUNA NQ'IARY PU9UC-CALIFO.9NIA SACFAMENT0 COUNTY ey Comm fois,s July 15,199I cc:
G. Kalman. NRC,'Bethesda (w/atch)
-~ ~ ~ ~ ~ ~ ~ "
A. D'Angelo, NRC, Rancho Seco (
)
' J.B. Martin, NRC, Region V
(
)
i s
w N
I; 1
p 1
I
[ '.
1 1
1