Other: ML20154G705, ML20154J794, ML20205H758, ML20210K842, ML20212D134, ML20212D154, ML20212D166, ML20236M353, ML20236M366, ML20236P351, NL-86-672, Forwards Rev 1 to A-5415, Design Basis Rept, as Requested. Review of Current Emergency Feedwater Initiation & Control Sys Design Should Address Inconsistencies w/1983 SER Not Technical Adequacy
|
MONTHYEARML20137H9091986-01-17017 January 1986 Summarizes Expanded Scope of Living Schedule to Accommodate Accelerated Efforts to Install Majority of Emergency Feedwater Initiation & Control Sys During Upcoming Cycle 8 Outage,Per & 851023 Meeting Project stage: Meeting ML20154J7941986-02-27027 February 1986 Responds to IE Bulletin 85-001 Re Steam Binding of Auxiliary Feedwater Pumps.Procedures for Monitoring Fluid Conditions within Feedwater Sys to Identify Binding & for Restoring Sys to Operable Status If Binding Occurs Provided Project stage: Other ML20154G7051986-03-0303 March 1986 Provides Functional Description of Emergency Feedwater Initiation & Control Cycle 8 Refueling Outage Scope,Per Rj Rodriguez .Significant Changes in Design to Accommodate Resource/Equipment Lead Time Listed Project stage: Other ML20210K8421986-09-12012 September 1986 Rev 1 to Design Basis Rept Project stage: Other NL-86-672, Forwards Rev 1 to A-5415, Design Basis Rept, as Requested. Review of Current Emergency Feedwater Initiation & Control Sys Design Should Address Inconsistencies w/1983 SER Not Technical Adequacy1986-09-26026 September 1986 Forwards Rev 1 to A-5415, Design Basis Rept, as Requested. Review of Current Emergency Feedwater Initiation & Control Sys Design Should Address Inconsistencies w/1983 SER Not Technical Adequacy Project stage: Other ML20212D1541986-11-14014 November 1986 Rev 2 to Design Basis Rept Project stage: Other ML20212D1131986-12-0505 December 1986 Application to Amend License DPR-54,revising Listed Tech Specs,Including Sections 3.1, RCS, 3.4, Steam & Power Conversion Sys & 3.5, Instrumentation Sys. W/13 Oversize Figures.Fee Paid Project stage: Request IR 05000312/19860391986-12-0505 December 1986 Insp Rept 50-312/86-39 on 861112-13.No Violations or Deviations Noted.Major Areas Inspected:Tmi (NUREG-0737) Issues & Procedure TI-2515-65 Project stage: Request ML20212D1341986-12-0505 December 1986 Proposed Tech Spec Sections 3.1, RCS, 3.4, Steam & Power Conversion Sys, 3.5, Instrumentation Sys, 4.1, Operational Safety Review & 4.8, Auxiliary Feedwater Pump Periodic Testing Project stage: Other ML20212D1661986-12-0505 December 1986 Rev 1 to Emergency Feedwater Initiation & Control Auxiliary Feedwater Sys Description Project stage: Other ML20205H6901987-03-26026 March 1987 Rev 1 to Proposed Amend 152 to License DPR-54,clarifying Limiting Conditions of Operation & Surveillance Requirements for Emergency Feedwater Initiation & Control Sys.Description of Proposed Changes & Safety Analysis Encl Project stage: Request ML20205H7581987-03-26026 March 1987 Proposed Tech Specs,Clarifying Limiting Conditions of Operations & Surveillance Requirements for Emergency Feedwater Initiation & Control Sys Time Delay Modules Project stage: Other ML20236M3661987-06-11011 June 1987 Rev 3 to Design Basis Rept Project stage: Other ML20236M3531987-07-31031 July 1987 Proposed Tech Specs,Clarifying Proposed Limiting Conditions of Operation & Addl Surveillance Requirements for Emergency Feedwater Initiation & Control Sys Project stage: Other ML20236M3391987-07-31031 July 1987 Application for Amend to License DPR-54,consisting of Rev 2 to Proposed Amend 152,clarifying Proposed Limiting Conditions of Operation & Addl Surveillance Requirements for Emergency Feedwater Initiation & Control Sys Project stage: Request ML20236P3511987-11-0606 November 1987 Proposed Tech Specs Re Limiting Condition for Operation of Instrumentation Sys Project stage: Other ML20236P3411987-11-0606 November 1987 Supplemental Application for Rev 2 to Proposed Amend 152 to License DPR-54,revising Tech Specs Re Limiting Conditions for Operation of Instrumentation Sys Project stage: Supplement ML20207A6401987-12-0404 December 1987 Forwards Request for Addl Info Based on Preliminary Review of Proposed Inservice Testing Program for Plant.Meeting to Initiate Resolution of Encl Issues Proposed for 880106 & 07 Project stage: RAI ML20234F5711987-12-24024 December 1987 Forwards Formal Responses to NRC Questions from 871215 Exit Meeting at Conclusion of Insp of Util Response to IE Bulletin 79-27 Project stage: Meeting ML20148C6301988-01-0505 January 1988 Forwards Amend 93 to License DPR-54 & Safety Evaluation. Amend Revises Criteria Re Auxiliary Feedwater Sys & Adds Specific Requirements Associated W/Emergency Feedwater Instrumentation & Control Sys Project stage: Approval 1986-09-26
[Table View] |
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20059C1861993-12-22022 December 1993 Proposed Tech Specs Amend 186,rev 1 Re Nuclear Organizational Changes ML20058L4371993-12-0909 December 1993 Proposed Tech Specs Amend 187 Including Changes Making PDTS Consistent W/New 10CFR20 Regulations ML20127N3671993-01-19019 January 1993 Proposed Tech Specs Section D6.0,administrative Controls for Proposed Amend 186 ML20246F1241989-07-0505 July 1989 Proposed Tech Specs,Deleting App B in Entirety ML20245H5781989-06-22022 June 1989 Proposed Tech Specs for Amend 109 to License DPR-54 ML20245L0461989-04-27027 April 1989 Proposed Tech Specs for Proposed Suppl 1 to Amend 134 Re Application for Amend to License DPR-54,clarifying Unacceptability of Analysis Allowing Imperfections Greater than 40% of Nominal Tube or Sleeve Wall Thickness ML20235Y6071989-03-0606 March 1989 Proposed Tech Spec Page 4-17,including one-time Extension for Certain Surveillances Required to Be Performed by 890329 ML20245H8911989-02-28028 February 1989 Revised Proposed Tech Specs,Including Pages 3-30a,3-30b, 3-40a,3-45,3-46,4-18a & 4-75 Re Addition of Operating Requirements Designed to Provide Proper Limitations & Conditions on Reactor Bldg Pressure Equalization Operations ML20195F7701988-11-18018 November 1988 Proposed Tech Spec Section 3.4, Steam & Power Conversion Sys ML20206F2881988-11-15015 November 1988 Proposed Tech Specs 4.6.4.f (Page 4-34i) Re Surveillance of Equipment Required to Verify Vital 120 Volt Ac Bus Operability ML20205R8681988-11-0404 November 1988 Proposed Tech Specs Re Local Leakage Rate Tests & Reactor Bldg Containment Integrity ML20205M8971988-10-28028 October 1988 Proposed Tech Specs Re Nuclear Svc Battery Operability & Surveillance Requirements ML20205L2661988-10-25025 October 1988 Proposed Tech Spec Table 3.14-3, Carbon Dioxide Suppression Zones ML20155G2201988-10-0707 October 1988 Proposed Tech Specs Clarifying Operational Mode Applicability of Tech Spec 3.4 & Definition of Auxiliary Feedwater Sys Train ML20155B4591988-09-30030 September 1988 Proposed Tech Spec Sections 1,3,4,5 & 6,reflecting Numerous Editorial Corrections & Administrative Changes ML20155B8481988-09-30030 September 1988 Proposed Tech Specs Re Reactor Protection Sys Trip Setting Limits,Rcs High Point Vents,Leakage & Leak Detection,Reactor Coolant Inventory & Auxiliary Electric Sys ML20154J5611988-09-19019 September 1988 Proposed Tech Specs,Changing Local Leak Rate Test Requirements for Containment Penetrations ML20154D7591988-09-0808 September 1988 Proposed Tech Specs Re Administrative Controls,Onsite & Offsite Organizations & Facility Staff ML20153E6481988-08-31031 August 1988 Proposed Tech Specs on Limiting Condition for Operation Re Containment Isolation Valves ML20207C0831988-07-27027 July 1988 Revised Proposed Tech Specs,Consisting of Rev 1 to Proposed Amend 102,deleting App B ML20196A2281988-06-21021 June 1988 Proposed Tech Specs Providing Proper Limitations & Conditions on Reactor Bldg Pressure Equalization Operations During Power Operation & Modifying Existing Purge Sys Operation Requirement ML20155K0971988-06-14014 June 1988 Proposed Tech Specs Making Minor Corrections to Table 3.5.5-1, Accident Monitoring Instrumentation,Items 5 & 14 & Table 4.1-1 Items 65 & 92 & Adding Second Note to Table 4.1-1,Item 80 ML20195J4921988-06-10010 June 1988 Proposed Tech Spec Pages 4-69 Through 4-85a,modifying Radiological Effluent Tech Specs to Reduce Count Time Required for prebatch-release Sample Analysis ML20150D1861988-03-17017 March 1988 Proposed Tech Specs,Correcting Typos & Making Further Editorial Changes to Proposed Amend 139,dtd 860129 ML20196G5131988-03-0101 March 1988 Proposed Tech Specs,Revising Tech Spec 4.1-1,Item 44.c & Tech Spec 4.10.1.E.2 Re Total Quantity of Gaseous Chlorine in Restricted Area ML20147F0771988-02-25025 February 1988 Revised Proposed Tech Spec Table 4.1-1 & Tech Spec 4.10.1.E.2,requiring Performance of Surveillances Only When Gaseous Chlorine Onsite ML20149K8621988-02-12012 February 1988 Proposed Tech Spec 6.5.1.6.d,identifying Items Not Requiring Plant Review Committee Review ML20196D9091988-02-11011 February 1988 Proposed Tech Specs,Adding Term Dewatering to Process Control Program ML20149G1781988-02-0808 February 1988 Proposed Page 3-19 to Tech Spec 3.3, Emergency Core Cooling,Reactor Bldg Emergency Cooling & Reactor Bldg Spray Sys ML20196B8071988-02-0101 February 1988 Proposed Tech Spec Figure 6.2-2, Nuclear Organization Chart ML20148J3531988-01-13013 January 1988 Proposed Tech Specs,Consisting of Proposed Amend 165,adding Ventilation Radiation Monitor to Interim Onsite Storage Bldg.Related Info Encl ML20149E5971988-01-0606 January 1988 Proposed Tech Spec 3.6,consolidating Applicability Requirement for Containment Integrity in Applicability Statement ML20149E1591987-12-23023 December 1987 Proposed Tech Specs Incorporating Accident Monitoring Instrumentation Recently Installed or Upgraded ML20149E8591987-12-22022 December 1987 Proposed Tech Specs,Establishing New Set Lower Limits of Detection for Prebatch Release & Composite post-release Analyses ML20237D1171987-12-15015 December 1987 Proposed Tech Spec Section 3.5.5, Accident Monitoring Instrumentation & Table 3.5.5-1, Accident Monitoring Instrumentation Operability Requirements, Changing Page Ref & Wording,Respectively ML20236W8671987-12-0303 December 1987 Proposed Tech Spec,Combining Tech Specs 3.3.1.E & 3.3.1.F for Nuclear Svc Cooling & Raw Water ML20236V7961987-11-25025 November 1987 Proposed Tech Spec Figures 6.2-1 & 6.2-2,reflecting Util Corporate Support of Nuclear Safety & Nuclear Organization Chart,Respectively ML20236U3361987-11-25025 November 1987 Proposed Tech Specs Page 1-2b,adding Words to Effect That 3.25 Factor Applicable to Three Consecutive Time Intervals Will Be Reset to Begin After Next Surveillance ML20236U0821987-11-25025 November 1987 Proposed Tech Specs,Consisting of Suppl 1 to Rev 0 to Proposed Amend 164 ML20236S0881987-11-17017 November 1987 Proposed Tech Specs,Consisting of Suppl 2 to Rev 2 to Proposed Amend 147,concerning Diesel Generators ML20236P3511987-11-0606 November 1987 Proposed Tech Specs Re Limiting Condition for Operation of Instrumentation Sys ML20236K3921987-11-0202 November 1987 Proposed Tech Spec Table 6.2-1, Shift Crew Personnel & License Requirements & Pages 6-7 & 6-8,adding non-licensed Personnel,Statement Re Limiting Representation to Minority of Quorom & Lers,Respectively ML20236D6601987-10-23023 October 1987 Proposed Tech Specs,Providing Exception to Requirement That key-operated Shutdown Bypass Switch Not Be Used During Reactor Power Operation ML20235R4261987-10-0303 October 1987 Proposed Radiological Effluent Tech Specs,Incorporating Clarifications & Correcting Editorial Errors ML20235Q5111987-10-0101 October 1987 Proposed Tech Specs Re Comparison of Plant Tech Specs to STS ML20235F5301987-09-22022 September 1987 Proposed Tech Specs Consisting of Supplemental Info to Proposed Amend 147,Rev 2 Re Diesel Generator Outages ML20235F4641987-09-21021 September 1987 Proposed Tech Specs Changing Requirements Re Concentration of Oxygen in Waste Gas Holdup Sys to Provide for When Sys Free of Potentially Explosive Gases,For Example,During Maint ML20234D6591987-09-16016 September 1987 Proposed Tech Specs,Reflecting Addl Organizational Changes Due to Need for Addl Mgt Staffing for Present Outage & from Expansion of long-term Mgt Function ML20238E8351987-09-0808 September 1987 Corrected Tech Spec Page 4-47c to Proposed Amend 151 to License DPR-54,adding ...Will Be Exceeded Prior to Next Scheduled Snubber Svc Life... to Last Paragraph of Tech Spec 4.14f ML20236M3531987-07-31031 July 1987 Proposed Tech Specs,Clarifying Proposed Limiting Conditions of Operation & Addl Surveillance Requirements for Emergency Feedwater Initiation & Control Sys 1993-12-09
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20203H7501997-08-19019 August 1997 Rev 10 to Radiological Environ Monitoring Program Manual ML20203H7351997-02-10010 February 1997 Rev 9 to CAP-0002, Off-Site Dose Calculation Manual ML20203H7231997-01-21021 January 1997 Rev 9 to Radiological Environ Monitoring Program Manual ML20059C1861993-12-22022 December 1993 Proposed Tech Specs Amend 186,rev 1 Re Nuclear Organizational Changes ML20058L4371993-12-0909 December 1993 Proposed Tech Specs Amend 187 Including Changes Making PDTS Consistent W/New 10CFR20 Regulations ML20127N3671993-01-19019 January 1993 Proposed Tech Specs Section D6.0,administrative Controls for Proposed Amend 186 ML20059E0191990-08-0303 August 1990 Rev 0 to CAP-0002, Odcm ML20059E0141990-01-31031 January 1990 Rev 0,App a to CAP-0002, Odcm ML20059E0241989-11-22022 November 1989 Rev 3 to Environ Monitoring & Emergency Preparedness ML20246A4081989-08-16016 August 1989 Rev 5 to Inservice Testing Program Plan ML20245L7281989-07-18018 July 1989 Rev 5 to Administrative Procedure RSAP-0101, Nuclear Organization Responsibilities & Authorities ML20246F1241989-07-0505 July 1989 Proposed Tech Specs,Deleting App B in Entirety ML20246A5221989-06-30030 June 1989 Closure Plan ML20245H5781989-06-22022 June 1989 Proposed Tech Specs for Amend 109 to License DPR-54 ML20246E8551989-04-30030 April 1989 Analysis of Capsule RS1-F Smud Reactor Vessel Matl Surveillance Program ML20245L0461989-04-27027 April 1989 Proposed Tech Specs for Proposed Suppl 1 to Amend 134 Re Application for Amend to License DPR-54,clarifying Unacceptability of Analysis Allowing Imperfections Greater than 40% of Nominal Tube or Sleeve Wall Thickness ML20235Y6071989-03-0606 March 1989 Proposed Tech Spec Page 4-17,including one-time Extension for Certain Surveillances Required to Be Performed by 890329 ML20245G1941989-02-28028 February 1989 Procurement Engineering Assessment Plan Final Rept ML20245H8911989-02-28028 February 1989 Revised Proposed Tech Specs,Including Pages 3-30a,3-30b, 3-40a,3-45,3-46,4-18a & 4-75 Re Addition of Operating Requirements Designed to Provide Proper Limitations & Conditions on Reactor Bldg Pressure Equalization Operations ML20195F7701988-11-18018 November 1988 Proposed Tech Spec Section 3.4, Steam & Power Conversion Sys ML20206F2881988-11-15015 November 1988 Proposed Tech Specs 4.6.4.f (Page 4-34i) Re Surveillance of Equipment Required to Verify Vital 120 Volt Ac Bus Operability ML20205R8681988-11-0404 November 1988 Proposed Tech Specs Re Local Leakage Rate Tests & Reactor Bldg Containment Integrity ML20205M8971988-10-28028 October 1988 Proposed Tech Specs Re Nuclear Svc Battery Operability & Surveillance Requirements ML20205L2661988-10-25025 October 1988 Proposed Tech Spec Table 3.14-3, Carbon Dioxide Suppression Zones ML20155G2201988-10-0707 October 1988 Proposed Tech Specs Clarifying Operational Mode Applicability of Tech Spec 3.4 & Definition of Auxiliary Feedwater Sys Train ML20155B8481988-09-30030 September 1988 Proposed Tech Specs Re Reactor Protection Sys Trip Setting Limits,Rcs High Point Vents,Leakage & Leak Detection,Reactor Coolant Inventory & Auxiliary Electric Sys ML20155B4591988-09-30030 September 1988 Proposed Tech Spec Sections 1,3,4,5 & 6,reflecting Numerous Editorial Corrections & Administrative Changes ML20206A8151988-09-28028 September 1988 Rev 0 to, Effluents & Water Mgt Project Action Plan ML20154J5611988-09-19019 September 1988 Proposed Tech Specs,Changing Local Leak Rate Test Requirements for Containment Penetrations ML20154D7591988-09-0808 September 1988 Proposed Tech Specs Re Administrative Controls,Onsite & Offsite Organizations & Facility Staff ML20153E6481988-08-31031 August 1988 Proposed Tech Specs on Limiting Condition for Operation Re Containment Isolation Valves ML20151K1041988-07-28028 July 1988 Rev 0 to Special Test Procedure STP.668, EFIC High/Medium Decay Heat Test ML20207C0831988-07-27027 July 1988 Revised Proposed Tech Specs,Consisting of Rev 1 to Proposed Amend 102,deleting App B ML20151H6131988-07-15015 July 1988 Rev 0 to Matl Control Dept Action Plan for Rancho Seco Nuclear Generating Station ML20196A2281988-06-21021 June 1988 Proposed Tech Specs Providing Proper Limitations & Conditions on Reactor Bldg Pressure Equalization Operations During Power Operation & Modifying Existing Purge Sys Operation Requirement ML20155K0971988-06-14014 June 1988 Proposed Tech Specs Making Minor Corrections to Table 3.5.5-1, Accident Monitoring Instrumentation,Items 5 & 14 & Table 4.1-1 Items 65 & 92 & Adding Second Note to Table 4.1-1,Item 80 ML20195J4921988-06-10010 June 1988 Proposed Tech Spec Pages 4-69 Through 4-85a,modifying Radiological Effluent Tech Specs to Reduce Count Time Required for prebatch-release Sample Analysis ML20151R0641988-04-15015 April 1988 Rev 0 to STP.1154, Remote Shutdown Panel Test ML20151X3211988-04-0606 April 1988 Rev 1 to Procedure Development Project Action Plan for Temporary & Interim Procedure Change Incorporation as Procedure Rev ML20151V5871988-04-0202 April 1988 Rev 1 to Sys Engineering Action Plan SYSTEM-012, CRD Breaker Action Plan ML20151X2871988-03-31031 March 1988 Rev 0 to Sys Engineering Action Plan SYSTEM-009, Letdown Cooler Thermal & Hydraulic Shock Prevention ML20150D1861988-03-17017 March 1988 Proposed Tech Specs,Correcting Typos & Making Further Editorial Changes to Proposed Amend 139,dtd 860129 ML20196G5131988-03-0101 March 1988 Proposed Tech Specs,Revising Tech Spec 4.1-1,Item 44.c & Tech Spec 4.10.1.E.2 Re Total Quantity of Gaseous Chlorine in Restricted Area ML20147F0771988-02-25025 February 1988 Revised Proposed Tech Spec Table 4.1-1 & Tech Spec 4.10.1.E.2,requiring Performance of Surveillances Only When Gaseous Chlorine Onsite ML20147B1761988-02-15015 February 1988 Rev 0 to RECM-6878, Radiological Effluent Control Manual ML20148D9931988-02-12012 February 1988 Post-Trip Transient Investigation,Assessment & Reporting ML20149K8621988-02-12012 February 1988 Proposed Tech Spec 6.5.1.6.d,identifying Items Not Requiring Plant Review Committee Review ML20196D9091988-02-11011 February 1988 Proposed Tech Specs,Adding Term Dewatering to Process Control Program ML20149G1781988-02-0808 February 1988 Proposed Page 3-19 to Tech Spec 3.3, Emergency Core Cooling,Reactor Bldg Emergency Cooling & Reactor Bldg Spray Sys ML20196B8071988-02-0101 February 1988 Proposed Tech Spec Figure 6.2-2, Nuclear Organization Chart 1997-08-19
[Table view] |
Text
7 ;
RANCHO SECO UNIT 1 h TECHNICAL SPECIFICATIONS Limiting Conditions for Operation 3.5 INSTRUMENTATION SYSTEMS ,
3.5.1 OPERATIONAL SAFETY INSTRUMENTATION f l
Applicability Applies to unit instrumentation and control systems. ;
l Qb.iective ;
To delineate the conditions of the unit instrumentation and safety circuits .
necessary to assure reactor safety. l Specifications 3.5.1.1 Startup and operation are not permitted unless the requirements of Table 3.5.1-1, Colunns A and B are met. j 152* 3.5.1.2 In the event the number of protection or EFIC System channels i operable falls below the limit given under Table 3.5.1-1, Columns A j and B, operation shall be limited as specified in Column C. l In the event the number of operable Process Instrumentation channels is less than the Total Number of Channel (s), restore the .
inoperable channels to operable status within 7 days, or be in at least hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. If the number of operable channels is less than the minimum channels operable, either restore the inoperable channels to operable within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> j or be in at least hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. If the ?
number of operable channels is two less than the minimum channels j operable, the reactor shall be made subcritical within four hours I and on decay heat cooling within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. )
P 3.5.1.3 For on-line testing or in the event of a protection instrument or )
channel failure, a key operated channel bypass switch associated !
with each reactor protection channel will be used to lock the I channel trip relay in the untripped state as indicated by a light. l Only one channel shall be locked in this untripped state at any one i time. l 3.5.1.4 The key operated shutdown bypass switch associated with each reactor protection channel shall not be used during reactor power operation.
3.5.1.5 During startup when the intermediate range instrument comes on scale, the overlap between the intermediate range and the sourceo range instrumentation shall not be less than one decade. If the overlap is less than one decade, the flux level shall be maintained in the source range until the one decade overlap is achieved.
Proposed Amendment No. 152, Revision 2, Supplement 1 I 8711170256 871106 3-25 PDR ADOCK 05000312 P PDR t .
e eev ,s y d e gli e d d d e
e rbt gv e e l . b uac nl s s er s s y
pre ia s s ve s a
s a a ephl v a a Wiw p p epst e p p Ft o y
m hoeiut y y Ncp y
'n t nrwf e b b e b b e
- o i el fft l i d ryrt e e of n e e b t eeil u ee b b a a dh epro b . b . s c . . r r ith mo ye ye ssr ye ye e e v t o d ar ar oie ar ar p p of cnn Mu Mu L p Mu Hu O O rod wa s s p s s
_ r o
A p
ee nro saodt t e 3r
.se 3r
.se 3T
.i0r2 3r
.e s
3r
.e s
l s
e f s uvddul p p w p p n
- d d ro d d n nt nl eeh n . d s f me iaszsi 4 nG nG nol nG 4 4. nG 4 a n iuM t voi aS aS at e aS aS h o l n l gd e d T T cb T d d T d C n
_ i noe otcrl g n 2O 2O 2a 2O n n 2O a a a t oCb cs eor . a eS m i i iencud ,g ,g ,RP ,g ,g u d tft yt re pe 3 1i 1i 1 R 1i 3 3 1i 3 m n coo aua t s s s y s s i
_ C o
)
A sn n mc )d eAeo hl s
n sp n
sp n
srn noi sp n
s n
s n
sp n
s n
n Crna nds c o o0 o0 ot o0 o o o0 o iM
_ g ( ooc on( s .t i i5 i5 iad i5 i i i5 i e
n ti i al eer 2. obfe t t7 t7 t pe t7 t t t7 t
- i atB t c c c cis c c c c c h t ri atnk1 A Aw Aw Acs Awo A A Aw o
A t E.
i edd rena hl o o ia e
e e rL pnn e etp el el i
m Ooa el pnh ae r 5. ai cl e el ee el ee eny ee S
e S
e ee S
e
/A oB L C Cicb3ew S Sb Sb SAb Sb Sb dR nE aP O
s l e er na n
as hl S s Ce N l n O e f n I n ) ) ) ) oa S) T n 1 1 1 1 h Nd I ae rc Oe D hl e e e e e b g y t t t 1I u N )Cb t T n O B a o o o o mn .a tai C ( mr N G G N N N u i yl ICt ue ( S S ( ( ( Nnae NI n G mp / / ild UF o N iO 1 2 3 3 3 3 2 2 3 2 l ae IC I n amdd OC( T i t e n CE A M ord o EP1 R T nc SS - E eoe 1 P eh cs OL O ht e HA5 t s0 CC S g a NI3 T en03 0 AN N ) ) ci 3 RHe E f 1 1 nd0a -
Cl M o ai1 3 Eb U ) e e ) ) ) ) ) ) nv f T a R rs 1 t t 1 1 1 1 1 1 eoao T T el o o t r 1 S b e e N N e e e e e e n pf m N ) mn t ( ( t t t t t t i ou t I Aun o o o o o o o as m n (Na N G G N N N N N N mrmi e h ( S S ( ( ( ( ( ( uux m l C / / roma e a 2 2 4 4 4 4 2 2 4 2 ohi m x l
p t
o ,6aa p T n m u of s S i oaa
) t h 2 2 ams ruan n n b mh o o o e )
i n t 3 ii i i t o o l xnt s a i N B e aaoa i l t ( - t cmiitt v o a r a c o c e s i m B o p i N i ,aai R I t e i s g ( g g i n i t r A cp p o o nrtI ,
e ns o G ii m L e L i oi 2 g I y S t r u r tf nW 5 r S A nT P p u p s IF 1 u r G A r i r s ee A P e) S e, C r e s ir t nW .
t n tC r Wo R T t e T oF e o i go aI ,
u Ft a r l ey Ar N n ni wF l s Mc 4 c w P c u n e s a d i nbl s t U it dE e
i e A t n es n d a e( o v f e f t G a e l li e i l e r oR o a e l ad ve a id Fl t a L P m F a S m h eer m n ua o a u sy s o u o ccl p d o B r yr i n w w sr s t nn n w t u n ct t a o c oo o u io a o u rd ww e i
t rh nn i M L L Lt L A ai M L A oeoo m c og eo n Mt F rLL A n ti cC I a r Al d f.
u ch . . . .
o a c e F a ed W a b. c d e b s
en mn F Gs SI 1 23 o
R o E a. A e ee p t tt o
. o oo r 9 1 2 N NN P 2
5 1
e b s
s y a a p m y
b e l
e b b a
. r
_ ye e ar p Mu O s
s s A .e l 3r e s p n nt d . . . . . n fme 4. nG 4 4 5 3 3 a i uM aS h l d T d d d d d C noe n 2O n n n n n oCb a a a a a a m i ,g u tft 3 1i 3 3 1 1 1 m coo s i A n s sp s s s s s n
) sn n n n n n n n i Crna o o0 o o o o o M
( ti ooc i i5 i i i i i t t7 t t t t t e atB c c c c c c c h y
ri A Aw A A A A A t .
edd o E a pnn e el e e e e e rL l Ooa e ee e e e e e oB e C S Sb S S S S S /A d dR nE d aP n O o s c l e e er s na n 0 as hl 0 S s Ce 1 N l n O e f n a 1 I n ) ) ) ) ) oa S ) T n 1 1 1 1 1 h f TA IC NI d
e u
I D
N )Cb hl ae t
e t
e t
e t
e e t
rc e
b gym
.o f
tT A i n O C
B
( mr a
N o
N o
N o
N o
N o mnau uil m OC t ue mp
( ( ( ( ( Nnei CI n G id x EF o N i O 2 3 2 2 3 2 2 l a a SI C I n amd m C ( T i t en OE A M oroa HP 1 R T c CS - E ees N 1 P ehsa AL O ht h RA C
5 S
t g 0. )
I 3 T e n3 r N N ci o H e E f ndat C l M o ai c E b U ) ) ) ) ) ) ) nvf e T a R rs 1 1 1 1 1 1 1 eooV T T el t r (
S be e e e o e e e npm I
N )
Aun mn t o
t o
t o
t o
t o
t o
t o
i asmn ud (Na N N N N N N N m ri a h ( ( ( ( ( ( ( ux m lC a
roam 2 4 2 2 4 2 2 ohmo t C o ,6 a T n e of sv i oal t h a am V run
) b mow iiiF 3
l xtA e ) aaa t ) 4 c mi e o c r t c N i o e g
,ain
( g t t ne o c o nrI r e L e N i o e r V ( tfWf u p ( e e s Ff r s i e e l l eeAi e s r s l l b u t n D t t e T d b u a d oe i a r n a d n o l eyur re n w P c a n o E M U d i m E M nbsu e B t m l l n ss l e l G s o r r o o ades a F a S m C o o r r h ere n u o t t t t ccpr o nn n w t e c c n n u P i io a o u v e e o o rd w t ai M L A l V V C C oeoG c Mt a F rLS n a V u Bl . . . . . . .
F Gs o a b c WF a b c d 1 34 SI A ee e
t tt
. o oo 3 4. N NN
- +
_ 2 2
_ 5 5
_ 1 1
C 1524 RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS j Limiting Conditions for Operation Table 3.5.1-1 (Continued)
INSTRUMENTS OPERATING CONDITIONS Action 1 - Hith the number of OPERABLE channels one less than the Total 1 Number of Channels, restore the inoperable channel to OPERABLE within 7 days, or be in at least hot shutdown within the next 12 i hours. j
' Action 2'- Hith the number of OPERABLE channels one'1ess than the Minimum I Channels Operable then put one of the inoperable channels in trip, and restore at least one of the inoperable channels to i OPERABLE within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least hot shutdown within-the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
Action 3 - Hith the number of OPERABLE channels two less than the Minimum .
Channels Operable, be in at least hot shutdown within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> l and in cold shutdown within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. ]
Action 4 - Hith the number of OPERABLE channels one less than the Total Number of Channels OPERABLE, restore the inoperable channel to OPERABLE within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, or be in at least hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
Action 5 - Hith the number of OPERABLE channels one less than the Minimum Channels Operable, restore one inoperable channel to OPERABLE within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
Propored Amendment No. 152, Revision 2, Supplement 1 3-30c C 1---_ _