ML20155B407

From kanterella
Revision as of 23:55, 9 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Concurs W/Util That Bulletin 88-003 Not Applicable to Plant Since Stated That GE-type Hfa Relays Not Used at Plant
ML20155B407
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/26/1988
From: Wagner D
Office of Nuclear Reactor Regulation
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
IEB-88-003, IEB-88-3, TAC-68041, TAC-68042, NUDOCS 8806130175
Download: ML20155B407 (2)


Text

~ _

=

, May 26, 1988 Docket Nos. 50-266 DISTRIBUTION 50-301 Docket file. 0GC-GJF NRC'& Local PDRs E. Jordan PD3 Reading file J.Partlow K.Perkins P.Kerutzer Mr. C. W. Fay, Vice President G.Holahan ACRS (10)

Nuclear Power Department D. Wagner Wisconsin Electric Power Company PD III-3 Gray File 231 W. Michigan Street, Room 308 .

Milwaukee, Wisconsin 53201

Dear Mr. Fay:

SUBJECT:

RESPONSE TO NRC BULLETIN 88-03, "INADEQUATE LATCH ENGAGEMENT IN HFA TYPE LATCHING RELAYS MANUFACTURED BY GENERAL ELECTRIC (GE) COMPANY" - TACS 68041 AND 68042 On March 10, 1988, the staff issued NRC Bulletin 88-03 requesting that licensees perfonn inspections to ensure that all GE latching-type HFA relays installed in Class 1E applications have adequate latch engagement and that those relays which fail to meet acceptance criteria be repaired or ieplaced.

In your letter dated April 11, 1988, you stated that GE-type HFA relays are not used at Point Beach. We concur with you that Bulletin 88-03 is not applicable to Point Beach. Accordingly, TACs 68041 and 68042 are considered closed.

l Sincerely, David H. Wagner, Project Manager Project Directorate III-3 Division of Reactor Projects - III, IV, Y and Special Projects cc: See next page 8806130175 080526 l PDR ADOCK 05000266 G PDR I

1 LA/PD II-3

>d PM/PDIII-3 PD/

y- O/V PD/PDIII-3 PK er DWagner/vh GR) nbark KPerkins y p/88 g /gg/88 1/ 88 .3"/g/88 l

a Mr. C. W. Fay Point Beach Nuclear Plant Wisconsin Eler',ric Power Company Units 1 and 2 cc:

Mr. Bruce Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.

Washington, DC 20037 Mr. James J. Zach, Manager Point Beach Nuclear Plant 1 Wisconsin Electric Power Company )

6610 Nuclear Road l Two Rivers, Wisconsin 54241 l l

Town Chairman I Town of Two Creeks ,

Route 3 I Two Rivers, Wisconsin 54241 )

Chairman  !

Public Service Commission l of Wisconsin l Hills Fams State Office Building l Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Comission Office of Executive Director I for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Comission 6612 Nuclear Road Two Rivers Wisconsin 54241