ML20155B407
| ML20155B407 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 05/26/1988 |
| From: | Wagner D Office of Nuclear Reactor Regulation |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| References | |
| IEB-88-003, IEB-88-3, TAC-68041, TAC-68042, NUDOCS 8806130175 | |
| Download: ML20155B407 (2) | |
Text
~
May 26, 1988
=
Docket Nos. 50-266 DISTRIBUTION 50-301 Docket file.
0GC-GJF NRC'& Local PDRs E. Jordan PD3 Reading file J.Partlow K.Perkins P.Kerutzer Mr. C. W. Fay, Vice President G.Holahan ACRS (10)
Nuclear Power Department D. Wagner Wisconsin Electric Power Company PD III-3 Gray File 231 W. Michigan Street, Room 308 Milwaukee, Wisconsin 53201
Dear Mr. Fay:
SUBJECT:
RESPONSE TO NRC BULLETIN 88-03, "INADEQUATE LATCH ENGAGEMENT IN HFA TYPE LATCHING RELAYS MANUFACTURED BY GENERAL ELECTRIC (GE) COMPANY" - TACS 68041 AND 68042 On March 10, 1988, the staff issued NRC Bulletin 88-03 requesting that licensees perfonn inspections to ensure that all GE latching-type HFA relays installed in Class 1E applications have adequate latch engagement and that those relays which fail to meet acceptance criteria be repaired or ieplaced.
In your letter dated April 11, 1988, you stated that GE-type HFA relays are not used at Point Beach. We concur with you that Bulletin 88-03 is not applicable to Point Beach. Accordingly, TACs 68041 and 68042 are considered closed.
l Sincerely, David H. Wagner, Project Manager Project Directorate III-3 Division of Reactor Projects - III, IV, Y and Special Projects cc: See next page 8806130175 080526 l
PDR ADOCK 05000266 G
PDR I>d y-O/V 1
LA/PD II-3 PM/PDIII-3 PD/
PD/PDIII-3 PK er DWagner/vh GR) nbark KPerkins y p/88 g /gg/88 1/
88
.3"/g/88 l
a Mr. C. W. Fay Point Beach Nuclear Plant Wisconsin Eler',ric Power Company Units 1 and 2 cc:
Mr. Bruce Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.
Washington, DC 20037 Mr. James J. Zach, Manager Point Beach Nuclear Plant 1
Wisconsin Electric Power Company
)
6610 Nuclear Road Two Rivers, Wisconsin 54241 l
Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Chairman Public Service Commission of Wisconsin Hills Fams State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Comission Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Comission 6612 Nuclear Road Two Rivers Wisconsin 54241