ML20205N958

From kanterella
Revision as of 19:36, 6 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Partial Response to FOIA Request for Records Re Facility.App K Documents in Pdr.App L Documents Encl & Available in PDR
ML20205N958
Person / Time
Site: Pilgrim
Issue date: 10/07/1988
From: Grimsley D
NRC
To: Johnson G
SWIDLER & BERLIN
Shared Package
ML20205N963 List:
References
FOIA-88-198 NUDOCS 8811070125
Download: ML20205N958 (7)


Text

-, ,v e nn6uvm.vn, s v , mi . v, ,. . o :.

.\

[T i

[,,

~

RESPONSE TD FREEDOM CF I'*^'

assro se r.rs I ^ I ""'

i (s ....e INFORMATl074 ACT (FLIA) REQUEST 'l1988 OM DOCatt avvWetA ss 6# empas. eel Af0VtSTER Georie E. Johnson, Esquire 50-293 PART f.-Rf COROS RELEASED OR NOT LOCATED (See checaed bonest No agency records owbrect to the request have been located.

No addetonal agency records evbrect to te request have been located.

Agency records e.4ect to the roovest that are identfed in Appendia 5 are already ava We for pwN.c irepoten and copyeg m me NRC Pese Docsment Room, X 1717 H Street. N W.. Waehegton DC Agency tocorde svt,pect to the request that are dentered e) Appendia _ L* e,e be g maae ,,sa.bie io, poe.c pect.n and copy g in tre NRC rotSc oocumeai Room,1717 H Street. N W.. WasNagion, DC. in a foeder under the FOIA numtee and teowester name.

X_

The nonpropretsy versen ei the propose 41 that you egreed to accept m e telephone corworsaton wth a member of my staM e now boeg made eveeable for putec bepecten and coveg at me NRC PutAc Document Room,1717 H Street, N W . Washegton. DC e a fonder wreer the FotA number and war name.

Enctoe4 e informaten on have you may obtae eccses to and the c4<ges for copyeg records pieced n tre NRC PutAc Document Room.1717 H Street, N W. WasNngsm, DC.

Agency recceds e,bre:t to the re@est are encic+ed Any apphcatdo cha*ge for copes of the records proveed and paycwet p*ocedures are noted in the comments sectot.

Reco<de swW1 to the teowest >sse been teie<ved to another Federal agencytes) for review a d+'ect response to you.

In view of NRC's respoese to the reo.est. ro fwriter acten 's beeg taken on accead 'ene< oath _ . ...

PART 11 A.tNFORM ATION WTTHHELO N.CM Pustic DISCLOSURE C.,ta efematen a w.%e..d ,oco,0. e b.m md fe put+c dui .<e pe.useno we Foix e. ewes demeed , and i, ce rea.on. eisied in re,t n. eu.

i.on. s. C. and o Aay ,=esed po,t-e e ce decom.. .. oh.ch usy p.ut tre eu d a teeg eee e,. te.,, mue ,,.w. e, pot *c in.pect.on and copy g a ce NRC rotAc on e.ni Room. i?ir H si,eei. N w . we.hegion. oC. . . we. vado, n Foir %mee, and ,oweste, na, Commeate

  • Copies of Appendix L records are also being placed at the Local Public Document Room maintained in the Plymouth Public Library,11 North Street, Plymouth, MA.

8811070125 001007 PDR FOIA JOHNSONOB-198 PDR S f. 0'escf 04 DYS Ce 894 0sICoaOS s .

NIC f OR M 444 p .

93

y -

~ -

.~ ; L

'a~ -

l

.)

, , a  ; l

,, f g% ' '

4 i 4 ,

Re: FOIA-88-198 ,

[

APPENDIX K

> RECORDS MAINTAINED IN THE PDR

1. Undated Letter to F. M. Stazesky from Richard C. DeYoung, with

'W' enclosures. (22 pages), PDR Accession No. 8202250190 820118

2. Undated NUREG-1250 entitled, "Report on the Accident at the Chernobyl Nuclear Power Station." (214 pages), PDR Accession No. 8702170005
3. 11/30/71 Letter to R. S. Boyd from G. Laines, re: Steam Bypass Problem of BWR Pressure Suppression Containments. (3pages),PDR Accession No. 8308090846
4. 9/20/72 Letter to J. F. O' Leary, et al, from S. H. Hanauer, with '

enclosure. (8pages),PDRAccessionNo. 8712150213

5. 10/2/72 Letter to A. Giambusso from Joseph M. Hendrie, re:

Recomendations for Additional Surveillance Requirements for Pressure Suppression Containments. (2 pages), PDR Accession No. 8707080487

6. 2/14/75 . Letter to Maurice J. Feldmann from Dennis L. Ziemann, with enclosurc. (5 pages), PDR Accession No. 8712150323
7. 4/17/75 Letter to Maurice J. Feldmann from Dennis L. Ziemann, with enclosures. (7 pages), PDR Accession No. 8712140196
8. 7/78 NUREG-0474 entitled, "A Technical Update on Pressure Suppression Type Containments in Use in U.S. Light Water Reactor Nuclear Power Plants." (186pages),PDRAccessionNo. 7911140435
9. 9/25/78 NotetoJohnF.O' attachments. (14 Leary)fromJosephM.Hendrie,with pages , PDR Accenion ho. 8610080082 860731
10. 6/80 Manual of Protective Action Guides and Protective Actions for Nuclear Incidents. (184 pages), PDR Accession No. 81111302C9 11, 3/81 NUREG-0713, Volume 1, entitied, "Occupational Radiation Exposure ,

at Comercial Nuclear Power Reactors," (1979 Annual Report). '

(111pages),PDRAccessionNo. 8104030230 12, 7/81 NUREG-0008 (formerly NUREG-75/087), entitled, "Standard Review Plan." (920pages),PDRAccessionNo. 8110140308

13. 12/81 NUREG-0713. Volume 2, entitled, "Occupational Radiation Exposure at Commercial Nuclear Power Records," (1980 Annual Report).

(100 pages), PDR Accession No. 8201070348

14. 8/82 NUREG-0714,(Volume Exposure," Twelfth Annual1,Report entitled, "Occupational Radiation (108 pages 1979).

Accession No. 8209010444

15. 10/27/82 Technical Report TR-5310-1, re: Mark I Containment Program, entitled, "Plant-Unique Analysis Report of the Torus Suppression Chamber for Pilgrim Station - Unit 1." (144 pages). PDR Accession No. 8301040239

T'

m. .,

y, Re: LF01A-88-198:

APPENDIX K -

(Continued) ,

16. 11/82- MUREG-0713, Volume 3, entitled, "Occupational Radiation / '

Exposure at Commercial: Nuclear Power Reactors," (1981' Annual.

Report). (118pages),PDRAccessionNo. 8212270459 17, 11/16/82 Letter to William D.'Harrington from Ronald C. Haynes, with enclosures, re: S R'

- Performance (SALP)ystematic-

., (55 pages)..PDR Assessment Accession of Licensee No. 8211290492 821116

, 18.: f6/20/83 MASSPIRG release, entitled', "Blueprint for CHAOS II: Pilgrim Disaster Plans Still a Disaster."- (102 pages), PDR Accession No. 8712140233

19. 10/83 NUREG-0714, Volumes 2 and 3, entitled, "Occupational Radiation Exposure," (Thirteenth and Fourteenth Annual Reports,1980 and 1981). (64 pages), PDR Accession No. 8311010490
20. 10/26/83 Letter to Domenic B. Vassallo from W. D. Harrington, with w attachments, re: Mark I Containment Program: Plant Unique Analysis (NUREG-0661). (88 pages), PDR Accession , ,

No. 8311010218 831026

21. 12/83 NUREG-0713, Volume 4, entitled, "Occupational Radiation Exposure a' coninercial Nuclear Power Plants," (1982 Annual Report). (129 pages), PDR Accession No. 8401230162
22. 1/30/85 Letter to William D. Harrington from Domenic B. Vassallo, with enclosures, re:

MarkIContainmentLong)TermProgramat Pilgrim Nuclear Power Station. (5 pages , PDR Accession No. 8502140217 850130 23, 3/85 NUREG-0713, Volume 5, entitled, "Occupational Radiation Exposure at Commercial Nuclear Power Reactors," (1983. Annual Report). (128 pages), PDR Accession No. 8504050287

24. 8/15/85 Letter to William D. Harrington from Thomas T. Martin, with enclosure, re: Inspection Report No. 50-293/85-24 (5 pages),

PDR Accession No. 850827049 850815

25. 10/85 NUREG-0714, Volumes 4 and 5, entitled, "Occupational Radiation Exposure,"(FifteenthandSixteenthAnnualReports,1982and1983).

(53 ptges), PDR Accession No. 8511220012

26. 10/30/85 Letter to Robert J. Boulay. from Edward A. Thomas. (3 pages),

PDR Accession No. 8712140303

27. 12/31/85 Letter to William D. Harrington from Thomas T. Martin, with enclosures, re: Inspection Report No. 50-293/85-32.

(70pages),PDRAccessionNo. 8601070174 851231

[

a y,s -w ,-,.w,-

'W ,

s.

~

Re: F0!A-88-198 APPENDIX K' '

o (Continued)-

28. 2/18/86 Letter to William D. Harrington from Thomas E. Murley, with enclosures, re: Systematic Assessment of Licensee Perfonnance (SALP) Report No. 50-293/85-99. (M pages), PDR Accession No. 8602240202 -
29. 4/12/86 Letter to William D. Harrington from Thomas E. Murley, re: Confinnation of Actions to be Taken with Regard to the Pilgrim Plant Events Which Occured on April 11-12, 1986.

(2pages),PDRAccessionNo. 8604210211 860412

30. 5/22/86 Statement of Comissioner James K. Asseltine, U.S. Nuclear Regulatory Comission before the Subcommittee on Energy Conservation and Power Comittee on Energy and Comerce.

(5pages),PDRAccessionNo. 8606100493 860522

31. 5/23/86 Letter to William D. Harrington from Thomas E. Murley, with enclosures, re: Systematic Assessment of Licensee Performance (SALP) Report No. 50-293/85-99. (4 pages), PDR Accession No. 8605300124 860523
32. 6/6/86 Letter to Edward A. Thomas from Robert J. Boulay. (2 pages),

PDR Accession No. 8712140224

33. 6/26/85 The Comonwealth of Massachusetts Departr:ent of Public Utilities, D.P.U. 85-266-A. (339 pages), PDR Accession No. 8712140300
34. 7/15/86 Petition for Show Cause Concerning Pilgrim I Nurlear Power Station. (S2 pages), PDR Accession No. 8607180125 35, 8/12/86 Letter to The Honorable William B. Golden from James M. Taylor, with enclosure. (5 pages), PDR Accession No. 8608200426 36, 10/86 NUREG-0713, Volume 6, entitled, "Occupational Radiation Exposure at Comercial Nuclear Power Reactors and Other Facilities 1984,"

(Seventeenth Annual Report). (175 pages), PDR Accession No. 8610210395

37. 9/16/86 Report to the Governor on Emergency Preparedness for an Accident at the Pilgrim Nuclear Power Station. (289pages),

PDR Accession No. 8712140208 ,

38. 12/19/86 Letter to The Honorable William B. Golden from James M. Taylor. (3 pages), POR Accession No. 8612310095
39. 3/87 Report to the Selectmen on The Plymouth Radiological Emergency Response Plan by the Town of Plymouth Comittee on Nuclear Matters. (11pages),PDRAccessionNo. 8705060356
40. 4/7/87 Letter to Chainnan Zech from Gerry E. Studds. (1 page), PDR Accession No. 8705060351

~

Re: FOIA-88-198 APPENDIX K (Continued)

41. 5/21/87 Letter to The Honorable Gerry E. Studds from Lando W. Zech.

(2 pages), PDR Accession No. 8705290163

42. 8/5/87 Letter to Thomas Murley from Rachel Shimshak, with enclosure.

(34 pages). PDR Accession No. 8712140238

-E 43. 10/23/87 Letter to Lando W. Zech, Jr. from John Kerry, with attachment.

(3 pages), PDR Accession No. 8712300018 l 44. 12/3/87 Letter to The Honorable John Kerry from Lando W. Zech, Jr.

(2pages),PDRAccessionNo. 8712300010 q

/

l l

I i

1

Re: F0!A-88-198 APPENDIX L RECORDS BEING PLACFD IN THE POR UNDER THE'ABOVE REQUEST NUMBER

1. Undated Newspaper to' Deal with Management article entitled, "Pilgrim(2topages Troubles." Stay)' Shut 6 More Weeks l 2. Undated Newspaper article entitled, "NRC' Orders Pilgrim to Remain Shut." (1 page) l 3. Undated ' Letter to A. Corey from Norman C. Moseley,.with enclosures, re: Perfonnance Appraisal Inspection 50-293/81-20. (57pages) in Iye[

y',

4. Undated PNPS-FSAR Sectien 5 Containment Report. (30pages)

'd

,; .5. 2/19/76 American National Standard Administrative Controls and Quality Assurance for the Operation Phase of Nuclear Power Plants, Z Revision of N18.7-1972. (2 pages)

6. 6/19/82 Prt.mpt Alerting and Notification System Test Observer Questionnaire Form. (1 page)
7. 1/24/83 Report by the Federal Emergency Management Agency re: Pilgrim Nuclear Power Station Siren Test of 6/19/82. (24 pages)
8. 1/25/85 I Office Pemorandum re: Surveillance to C.

Finding No. J. Mathis 85-1, 2-1-1. (5 from pagesH. F. Brannanl

9. 9/27/85 Letter to the NRC's Occument Control Desk from W. D. Harrington, re: Docket No. 50-293; License DPR-35.

(3 pages)

10. 6/18/85 Newspaper article written by Fred Kaplan entitled, "NRC says Pilgrim Skipped Routine Tests." (2 pages)
11. 2/21/85 Office of Inspection and Enforcement Report, re: IE Information Notice No. 85-13: . Standby Liquid Control System Squib Valves Failure to Fire. (8 pages)
12. 5/21/86 Newspaper article written by Larry Tye entitled, "NRC Orders Pilgrim to Remain Shut." (1 page)
13. 5/23/86 Newspaper article written by Adam Pertman entitled, "Pilgrim on List of Worst-Run Nuclear Units." (2pages)
14. 5/26/86 Newspaper article written by Larry Tye entitled, "Chernobyl Accident... Can it Happen Here?" (4 pages)
15. 6/9/86 Articles in "Inside NRC" discussing Pilgrim. (2 pages)
16. 6/21/86 Newspaper Collusion Have article entitled,("Charges no Merit." 1 page) of Nuclear Cover-up and
17. 6/27/86 Newspaper article written by Bruce D. Butterfield entitled, "DPU Blasts Edison, Cites ' Paralysis' at Top." (2pages)

Re: F0!A-88-198 APPENDIX L

(Continued)

RECORDS BEING PLACED IN THE POR UNDER THE AB0VE REQUEST NUMBER

18. 6/28/86 Newspaper article written by Anne Bartlett er..itled, "Two Towns Want out of Pilgrim Evacuation Plan." (2 pages)
19. 7/9/86 Newspaper article written by Jean Demc,s entitled, "Judges Asked to Limit Pilgrim Picketing." (1page)
20. 3/07 Report by the Town of Plymouth Comittee on Nuclear Matters to the Selectmen on the Plymouth Radiological Emergency Response Plan. (89 pages)
21. 6/87 Standari P view Plan for the Review of Safety Analyisi Reports for Nuc; ear Power Plants. (250pages)
22. 8/5/87 Letter to Thomas Murley, from Rachel Shimshak, with enclosures.

(34pages)

23. 10/28/87 Letter to' Ralph G. Bird from Steven A. Varga, re: Proposed Enhancements to the Mark I Containment - Pilgrim Station, with attached telecopier cover letter and other enclosures.

(5 pages)

I

SWIDLER & BERLIN

. munuo looo K STRitT. Pd W nm> .

WASHINGTON, D C. Moobledn (202) 944 4 500 Tna won TRJCO,tsa (702)9444296 March 25, 1988 TREEDOM 0F INFORMATION Director ACT REQUEST .,

Office of Administration For4 4f./9g U.S'.; Nuclear Regulatory Commission Washington, D.C. 20555 h M/-[k In re Freedom of Information Act Request No. 88 __, Concerning Pilgrim Nuclear Pouer Station

Dear Sir:

In accordance with the prov!.sions of the Freedom of Information Act, 5 U.S.C. 5552 and Part 9, Subpart A of 10 C.F.R., it is requested that the records identified below be made available for inspection and copying:

1. Records *of any votes taken by the Commission, and records or transcripts of Commission meetings, with respect to the shutdown of the Pilgrim Nuclear Power Station, or the restart thereof, on or after April 12, 1986.
2. All SECY papers, attachments thereto, records and other materials su$ porting or forming the basis for positions taken therein on the subject of the Pilgrim Nuclear Power Station, prepared on or after January 1, 1980.
3. All records prepared or dated on or after January 1, 1980 (but excluding documents included on Docket No. 50-293 accession listings available from the Public Document Room) of NRC Region I, the Office of the Executive Director for Operations, the Office of Inspection and Enforcement, the Office of Investigations, the Office of Nuclear Reactor Regulation, the Office of Nuclear Materials Safety and Safeguards, the Advisory Committee for Reactor Safeguards, the Office for Evaluation of Operational Data, and the NRC Emergency Operations Center which discuss, refer to, take positions on, or form the basis for decisions concerning, the performance of the Pilgrim Nuclear Power Station in the following areas:

C - ,_ i.

g>v }J n vo cM 3 DI 90 7 ~

c ..

A. Managet.ent i B. Staffing C. Organization and Orianization Structure D. Radiation Protectiot E. Quality Assurance F. Surveillance G. Maintenance H. Offsite Emergency Planning

1. Fire Protection J. Security K. Management Response to NAC Regulatory Activities
4. All records of Region I, the Office of Nuclear Reactor Regulation, the Commission, the Of fice of Inspection and Enforcement, or other Staf f or Commission of fices relating to, discussing or forming the basis or support for, the Director's Decision (DD-87-14) dated August 21, 1987.
5. All records (other than those categories of documents excluded from Item 3) of any office referred to in Item 4, above, discussing, describing, assessing, evaluating, or otherwise relating to actions by the NRC staf f, FEMA, the ACRS, or other NRC or Commission of fices, to follow-up or monitor actions by Boston Edison Company, the Commonwealth of Massachusetts, other jurisdictions within the 10-mile emergency planning zone for Pilgrim Nuclear Power Station, to address issues raised in the Director's Decision (DD 14) dated August 21, 1937.

6 All records of the NRC of fices referred to in Item 4 discussing, describing, assessing or evaluating, or otherwise relating to actions of the NRC staf f to evaluate the July 1987 Restart Plan, and other actions by Boston Edison Company, its agents or contractors, relating to the restart of the Pilgrim Nuclear Power Station.

7. All records of communications (whether written or oral and occurring from April 12, 1986 to the present) between any of fice of the NRC Staf f, or of the Commission or of fices reporting directly to it, and Boston Edison Company, i concerning the status or startup of the Pilgrim Nuclear Power Station.
8. All records of communications (whether written or oral, and occurring from April 12, 1986 to the present) between any of fice of the NRC Staf f or of the Commission or of fices reporting directly to it, and FEMA, other Federal or State agencies or governmental entities, or persons concerning the status, startup, or issues relating to startup, of the Pilgrim Nuclear Power Station.

a

9. All records in the possession of any NRC Staff or Commission office pertaining to (a) the evaluation by FEMA, NRC, or any other entity or agency, of the adequacy of offsite emergency plans for the Pilgrim Nuclear Power Station, and (b) the conduct and/or evalustion of drills, full scale / full participation or partial scale / partial participation exercises conducted or planned for the Pilgrim Nuclear Power Station.

For purposes of this request, "record" or "document" is defined to include, but not be limited to, notes, memoranda, reports, meeting minutes, logs, transcripts, letters, position or policy papers, interpretations of requirements, and guidance documents, and refers to drafts as well as any final version of

.iny record or document requested.

Sine t ly, I

( sf Hi- k

>o eE Jo son, Esq.

(202)944-438 GEJ/veg l

i I

i 4

t i i