ML20235S142

From kanterella
Jump to navigation Jump to search
Forwards Record Identified as App C/C-1 in 890207 Response to FOIA Request,Per Telcon.Record Improperly Withheld
ML20235S142
Person / Time
Site: Pilgrim
Issue date: 03/01/1989
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Johnson G
SWIDLER & BERLIN
Shared Package
ML20235S146 List:
References
FOIA-88-198 NUDOCS 8903060138
Download: ML20235S142 (1)


Text

_ _ . --

e c)* "*%,o UNITED STATES 8

g

~

n

E-N'UCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 - '{

'+...../

MAR 1 1989

. George E. Johnson, Esquire Swidler and Berlin' 3000 K' Street, NW IN RESPONSE-REFER Suite 300 TO F01A-88-198 Washington, DC,~20007-3841

Dear George:

Per our telephone conversation of last week, I had the staff re-review the record identified as Appendix C/C-1 in my response letter to you dated February 7,1989. As you suspected, the record was improperly withheld. .1 am enclosing a copy of the record and I apologize for any inconvenience this error' may have caused you.

Sincerely,

/b'/W $* s ub y Donnie H. Grimsley, Director Divi: ion of Freedom of Information and Publications-Services Office of Administration s

Enclosure:

As stated I

l 8903060138 890301 PDR FOIA JOHNSON 88-198 PDR

. O.

}

-9 . f'

q. .

4 S*'lDLER & BERLIN p,.,. 6mmanun s ,

m.m in s e. .

T ADC.GTON D C acco' api

..m. .u 2 * *

  • 7 ~ 'Wiff Ttla 41188 TILACope JW.94 4Jg6 March 25, 1988 FREED 0'A 0F INF0Pj4AT105 ACT REQUEST ,

Director Office of Administration , FCIA J f . / 47f U.S. Nuclear Regulatory Commission Washington, D.C. 20555 NM h dd/-[k In re: Freedom of Information Act Request No. 88 __, Concerning Pilgrim Nuclear Power-Station

Dear Sir:

In accordance with the provisions of the Freedom of Information Act, 5 U.S.C. 5552 and Part 9, Subpart A of 10 C.F.R., it is requested t.iat the records identified below be r.ade availabic for inspection and copying:

1. Records of any votes taken by the Commission, and records or l transcripts of Commission meetings, with respect to the shutdown of the Pilgrim Nuclear Power " Station, or the restart thereof, on or after April 12, 1986.
2. All-SECY papers, attachments thereto, records and other materials supporting or forming the basis for positions taken therein on the subject of the Pilgrim Nuclear Power g

Station', prepared on or after January 1, 1980.

3. All records prep ed or jdated on or after nuar 1, 1980 (but excluding ocum.ents included on Dof 't No. 0-293 Ke accession lis #ngs i ava'lable from the.'Public Doc ent Room) ,-

of NRC Regi I, the O fice of the, Executive Di ector for Operations the Offic of Inspecti6n and Enfor ment, th Office o VInvestigat 'ns, the Office of Nuclea Reacto Regulatj6n, the Of fi e of Nuc} ear Materials S fety a Safeguptds, the Adv ory Committee for React Saf oards, the office for Eval ation which Operational Data, an the NRC Emer.ency Operatior( Cen discuss, rpfe to, take pos tions on, or fc'rm t) basis for decisions oncerning, t performance of 'Qhp/ ilgrim Nuclear Power Station in the ,

P l 11owing areas:

l l

I

o-

' s

( .

, i l

A. Management.

B. Staffing C. Organization and Organizati:.- Structure D. Radiation Protection E. Quality Assurance F. Surveillance G. Maintenance H. Offsite Emergency Planning I. Fire Protection J. Security

y. Management Response to NRC .5 ;1atory Activities 4.

All records of Region I, the Office of Suclear Reactor Regulation, the Commission, the Offict cf Inspection and Enforcement, or other Staf f or Commist;on of fices relating to, discussing or forming the basis or support for, the Director 's Decision (DD-87-14 ) dated A; gust 21, 1987.

5. All records (other than those categories of documents excluded from Item 3) of any office referred to in Item 4, evaluating, or above, discussing, describing, assessi .g, otherwise relating to actions by the !N staf f, FEMA, the ACRS, or other NRC or Commission of fices, to follow-up or monitor actions by Boston Edison Compa.y. the Commonwealth of Massachusetts, other jurisdictions within the 10-mile emergency planning zone for Pilgrim N;: lear Power Station, to address issues raised in the Direct:r's Decision (DD 14) dated August 21, 1987.
6. All records of the NRC of fices referred to in Item 4 discussing, describing, assessing or etaluating, or otherwise relating to actions of the !GC staf f to evaluate the July 1987 Restart Plan, and other actions by Boston Edison company, its agents or contractors, relating to the restart of the Pilgrim Nuclear Power S ation.

L 7. All records of communications (whether written or oral and occurring from April 12, 1986 to the pesent) between any of fice of the NRC Staf f, or of the Cort:.ission or of fices reporting directly to it, and Boston Edison Company, concerning the status or startup of the Pilgrim Nuclear Power Station.

I 8. All records of communications (whether written or oral, and occurring from April 12, 1986 to the present) between any

( of fice of the NRC Staf f or of the Corraission or of fices reporting directly to it, and FEMA, other Federal or State agencies or governmental entities, or persons concerning the status, startup, or issues relating tc startup, of the '

Pilgrim Nuclear Power Station.

1

[

3- 1

.' j n ,

9. All records in the p'ossession of any NRC Staf f or Cor. ;ssion j office pertaining to (a) the evaluation-by FEMA, NRC, cr any 1 other entity or agency, of the adequacy of offsite erergency I plans for the Pilgrin. Saclear Power Station, 'and (b) ne i conduct and/or evalust:on of drills, full scale / full participation or partial scale / partial participation exercises conducted or planned for the Pilgrim Nuclear ' Power Station. l 1

For purposes of this request, " record" or " document" :s defined to include, but nc: be limited to, notes, memoranda, reports, meeting minutes, legs, transcripts,~1etters, pos::;on or policy papers, interpretations of requirements, and guidan:e documents, and refers to draf ts as well as any final versi:n of any record or document requested.

Sine ly, eE 6

Jo dae son, Esq.

(2021944-438 GEJ/veg I

_ _a_____-_-.-.. _