ML20245B767

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request for Records.App H/H Records Available in Pdr.App I/I Records Encl & Available in Pdr.App J/J & K/K Records Partially & Completely Withheld, Respectively (Ref FOIA Exemption 5)
ML20245B767
Person / Time
Site: Pilgrim
Issue date: 04/19/1989
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Johnson G
SWIDLER & BERLIN
Shared Package
ML20244D847 List:
References
FOIA-88-198 SECY-85-338, SECY-85-338A, NUDOCS 8904260266
Download: ML20245B767 (16)


Text

- - _ . _ _ _ _ - - _ _ _ . - _ _ _ - _ . _ _ _ _ _ _ _ _ , . .

em fW .. ]

', ~

V RESP NSE TO FREEDOM OF x2 ' '^ -

itu lYl e^ariat

^"

/ INFORMATION ACT (FOIA) REQUEST g 9 gg

...ee DOCMT NUMMRtSI M spphcabrel ti[QUt.ST ER f e M/ '

As /J s f RELEASED OR NOT LOCATED (See checked bones)

$8'EVb

// [ PA T l. f[CY' REC'Of/S' No agency ecords subjec the request have been located No additional agency records subject to the request have beon located.

Requested records are available through another public distribution program. See Comrnents Section.

1/ Agency records subsect to the request that are identified on Appendix (es)

NRC Public Document Room 2120 L Street. N W., Washington, DC 20555 are already available for public inspection and copying in the

/\

Agency records subject to the sequest that are identified on Appendiales) [ [N NRC Puboc Document Room, 2120 L Street, N W., Washington, DC. in e iolder unaer this FOIA number and requester name.

are being made available for public inspection and copyir g in the The nonpropr etary version of the proposalts) that you agreed to accept in a telephone conversation with a member of my staff is now being made available for public inspection and copying at the NRC Pubhc Document Room 2120 L Street, N.W., Washington, DC. in a folder undes this FOIA number and requester name.

Agency records subject to the request that are identified on Appendentes) may be inspected and copied at the NRC Local Pubhc Document Room identified in the Comments Section.

Enclosed is information on how you may obtain access to and the charges for copying records placed in the NRC Pubhc Docuanent Room 2120 L Street. N W .

Washington, DC.

Agency records subject to the request are enclosed Racords sub ect to the request have been referred to another Federal agencybest for review and direct response to you You will be billed by the NRC for fees totakng $

k. view of NRC's responsa to this request, no further action is being taken on appeal letter dated No.

PART 11. A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certarn information in the requested records is being withheld from public disclosure pursuant to the exemptrons desctbed in and for the reasons stated in Part il

. sections B. C. and D. Any released portions of the documents for which only part of the record is being yvithheld a<e peing made available for pubhc inspection and copying in the NRC Pubhc Document Room, 2 20 L Street. N W.. Washington, DC.in a folder under this FOI A numbe and requester name, dMMENTS

$ UZH UA & l g DY Ac~l d X4 M g % : n,xg n,a M mmm 1

N qq g /

pt M /

t w uz A M. #^YTP, <

  • n g A Qs a mX /AT a ucA +' /A $

1 pg faa i

.(

R, DIVISt OF FREEDOM OF INFORMATION AND PUBLICATIONS SERVICES SpaATURE, DIREC V%b

  • Tst%$A 1

8904260266 890419 PDR FOIA ).

JOHNSON 88-198 PDR

- en. .. m ~i

- _ - - - ~ . - . . - . _ - - _ _

PART 11.B- APPUCABLE E_XEMPTIONS Records subject to the request that and described on the enclosed Appendix being withheld in their entiref y or in part under the Exernptions and for the reasons set forth below pursuant to 5 U S C. $52(b) and 10 CFR 917(a) of NRC Regulations.

1. The withbe'd enformatior. L pe erly classified pursuant to Emecutive Order (EXEMPTION 11
3. The withhes information relates solely to the internal personnel rules and procedures of NRC. (EXEMPTION 2)
3. The withheld information is specifically esempted from public disclosuse by statute indicated (EXEMPTION 3)

Sections 141 145 of the Atomic Energy Act whu.h prohbsts the disclosure of Restncted Data or Formerly RestrKled Data 142 U S C 21612165L Section 147 of the Atomic Energy Act whKh prohsbits the disclosure of Unclassified Safegoerds information (42 U S C. 2167)

{4. The withheld information is a trade secret or commercial or financial information that is beeng withheld for the reasonis) endicated (EXEMPTION 4)

The mformation is considered te be confidential business (propnetaryl mf ormation.

The information is considered to be propnetary information pursuant to 10 CFR 2.790(d)(11 The information was submitted and received in confidence pursuant to 10 CFR 2.790ldK2)

6. The withheld information consists of interagency or intraogency records that are not available through discovery dunng Irtigation (EXEMPTION 51 Apphcable ve' pe Dehberative Process: Disclosure of predecisional information would tend to enhibit the open and franir enchange of ideas essential to the dehberative process V Where records era withheld in theer entuety, the f acts are neatocably intertwined with the predecisionalinformation There also are no reasonably segref,able f actual portions because the release of the f acts would permit an indirect inquiry into the p'edecisional process of the agency A

Attorney work product pnvilege (Documents prepared by an atiorney in contemplation of htigation )

Anorney - chent pnvilege Confidential communications bet ween on attorney and his her client )
6. The withheld information is exempted from public disclosute because its disclosure would result in a clearly unwarranted invasion of personal privacy (EXEMPTION 81
7. The withheld information cons'sts of records compiled for law enforcement purposes and is being withheld for the reason (s) indicated tEXEMPTION 7)

Disclosure could reasonably be expected to anterfere with an enforcement proceeding because it could reveal the scope. duection. and focus of en forcemcnt efforts, and thus could possibiy allow them to take action lo shield potential wrongdoing or a violation of NRC requirements from investigator s EXEMPTION 7 (AH Disclosure would constitute an unwarranted invasion of personal pnvacy (EJEMPTION 7(Ch The information consists of names of individuals and other information the disclosure of which couH reasonably be enoected to reveaf identities of confidential sources (EXEMPTION 71011 OTHER

\ _

PART 11. bDENYING OFFICIALS Pursuant to 10 CF R 9 25tt9 and or 9 25 (ci of the U S Nuclear Regulatory Commission regulations. it has been determmed that the inf ormation withheld is enempt from product on or disclosure. and that its production or disclosure es contrary to the pubhc interest The persons responsible for the denial are those officials identified below as denying of f ciais and the Doector Divesson of Freedom of information and Publ4 ations Services Of fice of Administration and Resources Management for any denials that may be appepled to the E necutive Diret tor for Operations (EDOi DENYING OFFICIAL TITLE /OF FICE RECORDS DENIED APPELLATE OFFICIAL SE CRET ARY EDO

~4

/ . _ _ . . M . N 6 -

f

/ , .

J J .m en, _X//_ -L_9 \

- gew. . LCh.. 4 . , , - - -

, ,h l~ N

/ l i

(

C W /.iGmaL' & 4ae a LM-H f X

U tf M j8 ' PART 11. D- APPEAL RIGHTS The denial by each denying offecial identified in Part il C ma be appealed to the Appellate Offecial identified in that section. Any such appeal must be in wnting and most l be made withen 30 days of receipt of this response Appeals must be addressed as appropnate to the Emecutive Director fos Operations or to the Secretary of the Commission, U S, Nuclear Regulatory Commission. Washington. DC 20555 and should clearly state on the envelope and in the letter that it is an " Appeal from an initial FQlA Decision.'

NRC FORM 464 (Part 2) U.S. NUCLEAR REGULATORY COMMISSION (11 88)

FOIA RESPONSE CONTINUATION

. Re: FOI A- 88-198 APPENDIX .H/H RECORDS MAINTAINED AMONG POR files NUMBER DATE DESCRIPTION

1. March 87 Town of Plymouth, Report to the Selectmen on the Plymouth Radio-logical Emergency Response Plan Accession No. 87050601o6
2. 4/7/87 Letter from Gerry E. Studds, House of Representatives, to Chairman '

Zech,NRC,

Subject:

Plymouth Report Accession No. 87050603d1

3. 4/29/87 Memorandum from Frank J. Congel, Director, DREP/NRR, to' Richard W. Krirum, FEMA,

Subject:

Offsite Emergency Planning at Pilgrim Accession No. 8705060340

4. 10/12/87 Memorandum from Steven A. Yarga, Director, DRP -l & II, to Frank Congel

Subject:

FEMA Memorandum on Offs P.e Emergency Planning for Pilgrim Acc. No. 8809230219XA

5. 12/9/87 Letter from Steven A. Varga, Director, DRP-1/II, NRR, to Ralph G.

Bird,BECO,

Subject:

Issuance of Exemption to 10 CFR Part 50, Ap-pendix E,Section IV.F 3. for the Pilgrim Nuclear Power Station Acc. No. 8712150352, Enclosure No. 8712150381

6. Undated Draf t letter f rom Steven A. Yarga, Director, DRP-1/ll, NRR to Rciph G. Bird, BECO (Final version in PDR - Acc. No.8810270301
7. 4/8/87 Letter from Thomas E. Hurley, Regional Administrator to BECO, Ralph Bird, Senior Vice President,

Subject:

Systematic Assessment of Licensee Performance (SALP) Report No. 50-203/86 09 Accession No. 8706290002 i

I l

l

Re: F01A-88-198 APPENDIX I/I RECORDS TO BE PLACED IN THE PDR

1. Undated Proposed Opening Remarks by Dr. Murley. (6 pages)
2. Undated Handwritten notes, re: Allegations. (1 page) i
3. Undated Handwritten notes, re: APRM Downscale. (7 pages)
4. Undated Handwritten notes, re: Brief Needs. (1 page)
5. Undated Handwritten notes. (1 page)
6. Undated Outline, re: Direct Torus Vent Options. (3 pages)
7. Undated Outline (2 pages)
8. Undated Outline, re: Expected Questions. (54 pages)
9. Undated Draf t Outline, re: Guidelines for Permanent BWR Hydrogen Water Chemistry Installations. (10 pages)
10. Undated Status of Rev. 4 of EPGs and NRC Position on Pilgrim. (8 pages)
11. Undated Pilgrim Background Information. (1 page)
12. Undated ED0 Highlights, re: Pilgrim - Initial Assessment of Safety Enhancement Program. (1 page)
13. Undated Letter to Bird from Richard H. Wessman, re: Exemption from Certain Requirements of 10 CFR 50, Appendix R, Section III.G in Certain Areas of the Plant - Pilgrim Nuclear Power Station (TAC No. 53416), with enclosure. (23 pages)
14. Various Pilgrim Station Emergency Preparedness Exercise Timeline.

Dates (4 pages)

15. Undated United States Nuclear Regulatory Commission Boston Edison Company Docket No. 50-293 Environmental Assessment and Finding of No Significant Impact. (4 pages)
16. Undated Handwritten notes, with attachment. (3 pages)
17. Undated Handwritten notes, re: Pilgrim 2.206 on Restart, with attachment. (3 pages)
18. Undated Handwritten notes, re: Plymouth Study. (1 page)

Re: F01A-88-198 APPENDIX I/I_

RECORDS TO BE PLACED IN THE PDR (Continued)

19. Undated Memorandum for Harold R. Denton from Darrell G. Eisenhut, re:

Environmental Protection Plan. (2 pages)

20. Undated Memorandum for Thomas A. Rehm from Thomas E. Murley, re:

Kennedy Questions - 1/7/88 Hearing on Proposed Restart of l Pilgrim (ED0#003569), with enclosures. (33 pages)

21. Undated Questions and Answers, re: Emergency Preparedness. (11 pages)
22. 1/15. Handwritten note to Dan from R.H.W. (2 pages)
23. 4/22 Handwritten note to Vic from Br. (3 pages) 4
24. 7/21 Handwritten note, with attached Proposed Agenda for Meeting (BEC0/ FEMA /NRC). (3 pages)
25. 7/23-24 Plan of the Day. (9 pages)
26. 9/11 Pilgrim Update Briefing. (1 page)
27. 12/1 Handwritten Note for the Folder. (1 page)
28. 7/3/84 Final Director's Decision Under 10 C.F.R. s 2.206 in the Matter of Boston Edison Company (Pilgrim Nuclear Power Station).

(17 pages)

29. 2/11/86 Pilgrim SALP History, with attachments. (3 pages)
30. 3/17/86 Letter to William D. Harrington from John A. Zwolinski, re:

Emergency Response Facilities (TAC 45971,46042,4611,46330).

(2 pages)

31. 5/8/86 Letter to G. H. Neils from L. G. Hulman, re: Guidelines for permanent BWR Hydrogen Water Chemistry Installations - Request for Additional Information, with enclosure. (8 pages)
32. 5/13/86 Letter to T. W. Landry from W. D. Harrington, with attachment.

(2pages)

33. 6/2/86 Inspection of TMI Action Plan Requirements for Operating Reactors. (21 pages)
34. 6/18/86 TMI Action Plan Listing of Open Items Sorted by Plant Showing Who, What and When has the Next Task with Identification of Controlling Data Resource. (1 page)

- - _ - _ = _ . _ _ _ - _ _ _ _

Re: F01A-88-198 APPENDIX 1/I RECORDS TO BE PLACED IN THE PDR (Continued)

35. 6/25/86 Memorandum for Frank J. Miraglia, Themis P. Speis, William T. RussellMarkey's re: Congressman and Gary M. Holahan Questions, with from Jesse L.(2Funches, enclosure. pages )
36. 8/7/86 Handwritten Note to Gus Lainas from Paul Leech, re: Enclosed Show Cause Petition Concerning Pilgrim Station. (1 page)
37. 8/11/86 Memorandum for Robert S. Wilkerson from David B. Matthews, re:

Pilgrim Petition. (1 page)

38. 8/12/86 Memorandum to Boston Edison Company (Pilgrim Nuclear Power Station) from Paul H. Leech, re: Meeting with Boston Edison Company re. Pilgrim Station. (1 page)
39. 8/14/86 Note to Gus Lainas from Paul Leech. (1 page)
40. 8/27/86 Note to Gus Lainas through John Zwolinski from Paul Leech, re:

Response to Show Cause Petition, re: Pilgrim Station. (1 page)

41. 9/11/86 Status of Boston Edison Effort to Enhance Performance Capability of Pilgrim's Containment. (77 pages)
42. 9/17/86 Handwritten notes, re: TAC 62756. (1 page)
43. 10/3/86 Memorandum for James G. Partlow from Robert M. Bernero, re:

Petition of William B. Golden and Others for a Show Cause Order Regarding Pilgrim Station, with enclosure. (9pages)

44. 10/16/86 Memorandum for Richard W. Krimm from Edward L. Jordan, re:

Pilgrim 10 CFR 2.206 Petition. (1 page)

45. 11/3/86 Operating Reactor Events Briefing 86-38, re: McGuire 1 and 2, Zion 1 and Pilgrim. (26 pages) 46, 1/87 Evaluation of Offsite Emergency Preparedness in the Area Surrounding the Pilgrim Nuclear Power Station. (72 pages) 47, 1/28/87 Memorandum for Richard W. Krimm from Edward L. Jordan, re:

Pilgrim 10 CFR 2.206 Petition. (1 page)

48. Various Handwritten Notes. (9 pages)
49. 4/10/87 Memorandum for Victor Stello from Harold R. Denton, re:

Proposals for Enhancing BWR Mark I Containments, with enclosure. (57 pages)

Re: F01A-88-198 APPENDIX 1/I RECORDS T N FLACED IN THE PDR (Continued)

50. 4/23/87 Memorandum for Thomas T. Martin from Ronald R. Bellamy, re: )

Pilgrim Public Interest Items, with enclosure. (14 pages) '

52. 4/29/87 Memorandum for T. Murley and others through Victor Nerses from Richard Wessman, re: Daily Highlight. (1 page)
53. 5/87 May 1987 Overview Report, re: Pilgrim-1. (2 pages)
54. 5/2/87 Safety Evaluation, re: Pilgrim Nuclear Power Station.

(251 pages)

55. 5/15/87 Letter to William T. Russell from R. G. Bird, with attachment.

(4 pages) 56, 3/20/87 Hardcopy News article. (1 page)

57. 6/87 June 1987 Overview Report, re: Pilgrim. (2pages)
58. 6/12/87 Menorandum for David B. Matthews from Ronald R. Bellamy, re:

Evacuation Time Estimates and Beach Population Sheltering Mobility Impaired and Special Facilities for the Pilgrim  ;

Nuclear Station. (35 pages)

59. 6/18/87 Note to F. Congel and others from Bruce Boger, with attachment. (3 pages)
60. 6/25/87 Note to Victor Nerses and C. Richard Van Niel from William D. Paton, re: Documents Supporting the Partial Director's Decision in Pilgrim, with attachment. (4 pages)
61. 6/29/87 Memorandum f or Victor Stello, Jr. from Thomas E. Murley, re:

Proposed Course of Action on BWR Mark I Containment, with attachment. (4 pages)

62. 7/87 July 1987 Overview Report, re: Pilgrim. (2 pages)
63. 7/1/87 Memorandum for Richard W. Krimm from Frank J. Congel, re:

Offsite Emergency Planning at Pilgrim. (1 page)

64. 7/2/87 Routing slip to R. Capra and others from Bruce Boger, with attachment. (4 pages)

i L

Re: F01A-88 1gg APPENDIX I/I RECORDS TO BE PLACED IN THE PDP (Continued)

65. 7/7/87 Memorandum for Files from Thomas E. Murley, re: Telephone Conversations with Ralph Bird, BECo. (2 pages)
66. 7/15/87 Commission Briefing on Status of Containment Performance and Improvements and Individual Plant Examination (IPE) Efforts.

(14 pages)

67. 7/16/87 Memorandum for Richard W. Krimm from Frank J. Congel, re:

Offsite Emergency Planning at Pilgrim, with enclosure.

(3 pages)

68. 7/21/87 Memorandum for Lawrence Shao and William F. Kane from Steven A. Varga, re: Initial Assessment of Pilgrim Safety Enhancement Program, with enclosures. (16 pages) )
69. 7/24/87 Letter to William T. Russell from Robert J. Boulay. (2pages) i
70. 7/24/87 Memorandum to Richard W. Krimm from Frank J. Congel, re:

Correspondence Related to Offsite Emergency Planning at Pilgrim. (1 page)

71. 8/87 August 1987 Overview Report, re: Pilgrim. (2 pages)
72. 8/5/87 Pilgrim Activities Update. (1 page)
73. 8/5/87 Note to T. Murley, F. Miraglia, R. Starostecki and S. Varga from Richard Wessman, with enclosure. (236 pages)
74. 8/12/87 Pilgrim Activities Update. (1 page)
75. 8/14/87 Memorandum for Steven A. Vargd from Frank J. Congel, re: FEMA i Report on Offsite Energency Planning for Pilgrim, with enclosures.

(3 pages) i

76. 8/18/87 i.etter to Ralph G. Bird from Steven A. Varga, re: FEMA Report l on Offsite Emergency Planning for Pilgrim, with enclosure.

(4 pages)

77. 8/19/87 Pilgrim Activities Update. (2 pages)
78. 8/24/87 Memorandum for T. Marley and others through Victor Nerses from Richard Wessman, re: Daily Highlight. (1page)
79. 8/26/87 Pilgrim Activities Update. (1 page) 1

Re: F01A-88-198 APPENDIX I/I RECORDS TO BE PLACEFIN THE PDR (Continued)

80. 8/31/87 Handwritten Notes. (13pages)
81. 9/87 September 1987 Overview Report, re: Pilgrim. (3 pages)
82. 9/2/87 Pilgrim Activities Update. (1 page)
83. 9/9/87 Pilgrim Activities Update. (2 pages)
84. 9/16/87 Pilgrim Activities Update. (1 page)

- 85. 9/16/87 FEMA Self-Initiated Review. (4 pages)

86. 9/23/87 ED0 Highlights, re: Pilgrim Activities Update. (1 page).
87. _9/24/87 Note to V. Nerses from R. Wessman, re: Rust'in and Header Nozzles, with attachment. (5 pages) _ Pilgrim Drywell
88. 9/30/87 Pilgrim Activities Update. (1 page)
89. 10/87 October 1987 Overview Report, re: Pilgrim. (3pages)
90. 10/7/87 Pilgrim Activities Update. (1 page)
91. 10/14/87 Pilgrim Activities Update. (1 page)
92. 10/16/87 Letter to Ralph G. Bird from Steven A. Varga, re: FEMA Memorandum on Offsite Emergency Planning for Pilgrim.

(1 page)

93. 10/20/87 Note to A. Thadani, F. Congel, S. Collins and L. Chandler from Bruce A. Boger, re: Response to Massachusetts 2.206 Petition of October 15, 1987 Regarding Pilgrim, with enclosure. (2 pages)
94. 10/23/87 Office of the Secretary Correspondence Control Ticket, re:

CRC-87-1244, with attachments. (lapages)

95. 10/26/87 Note to F. Miraglia, R. Starostecki and S. Collins from Bruce A. Boger, re: Response to Massachusetts 2.206 Petition of October 15, 1987 Regarding Pilgrim, with enclosure.

(2pages)

96. 10/26/87 Memorandum for Steven A. Yarga from Frank J. Congel, re:

Pilgrim Exercise Exemption Request, with enclosure. (9 pages)

l. i L . i l

l i

Re: F01A-88-198 j l

l:

l APPENDIX I/I RECORDS TO BE PLACED~IN THE PDR {

(Continued) {

97. 10/28/87 Pilgrim Activities Update. (1 page)
98. 11/87 November 1987 Overview Report, re: Pilgrim. (3 pages) '
99. 11/4/87 Pilgrim Activities Update. (1 page) 100. 11/9/87 Memorandum for T. Murley and others through Carl Stable from Richard H. Wessman, re: Daily Highlight. (1page)

~

101. 11/10/87 Pilgrim Activities Update. (1 page) 102. 11/13/87 Restart Status, re: Pilgrim. (1page) 103, 11/18/67 Pilgrim Activities Update. (2 pages) 104. 11/25/R7 Pilgrim Activities Update. (1 page) 105. 11/30/87 Restart Status, re: Pilgrim. (1 page) 106.'12/87 December 1987 Overview Report, re: Pilgrim. (3 pages) 107. 12/2/87 Pilgrim Activities Update. (2 pages) 108. 12/9/87 Note to Dr. Thomas E. Murley from Richard Wessman, re: Pilgrim Organizational Change, with enclosure. (2 pages) 109. 12/9/87 Pilgrim Activities Update. (1 page) 110. 12/11/87 Restart Status, re: Pilgrim. (1 page) 111. 12/14/87 Restart Status, re: Pilgrim. (1 page) i 112. 12/16/87 Pilgrim Activities Update. ( 2 pages) 113. 12/18/87 Routing Slip to T. Murley and others with attachment. (2 pages) 114. 12/22/87 Restart Status, re: Pilgrim. (1 page) 115. 12/29/87 Kennedy Hearing (1/7/88) Outline - Prepared Testimony.

(5 pages) 116, 12/29/87 Memorandum for David B. Matthews from LeMoine J. Cunningham,  ;

re: Pilgrim: Radiation Protection, with enclosure. (3 pages) 117. 12/29/87 Handwritten notes. (2 pages)

l Re: F01A-88-198 ,

1 APPENDIX 1/I RECORDS TIFBE PLACED IN THE PDR (Continued) 118. 12/29/87 ED0 Highlights, re: Pilgrim Activities Update. (1 page) 119. 1/88 January 1988 Overview Report, re: Pilgrim. (3 pages) 120. 1/4/88 NT0L Status, re: Pilgrim. (1 page) 121. 1/5/88 Facsimile Request to Dick Wessman from Roy Fuhrmeister, with attachment. (10 pages) ,

122. 1/5/88 Call-Up Sheet, re: Edits to Dr. Murley's Hearing, with attachment. (2 pages) 123. Undated Pilgrim Activities Update. (1 page) 124. 1/6/88 Note for Pilgrim File from Falk Kantor, re: Information on EP Status at Pilgrim. (2 pages) 125. 1/12/88 NT0L Status, re: Pilgrim. (1 page) 126, 1/13/88 Pilgrim Activities Update. (2 pages) 127. 1/15/88 Note to T. Murley and W. Russell from R. Wessman, re:

Transcript of Kennedy Hearing, with enclosure. (247 pages) 126. 1/20/88 Pilgrim Activities Update. (2 pages) 129. 2/88 February 1988 Overview Report, re: Pilgrim. (2 pages) 130. 2/2/88 NT0L Status, re: Pilgrim. (1 page) 131. 2/3/88 EDO Highlights, re: Pilgrim Activities Update. (2 pages) 132. 2/3/88 Table of Contents, with attachment. (3 pages) 133. 2/5/88 Handwritten Notes, re: Restart Plan. (1 page) 134. 2/5/88 Memorandum for Steven A. Varga from Bruce A. Boger, re:

Pilgrim Fire Protection Licensing Actions, with enclosure.

(2 pages) 135. 2/9/88 Direct Torus Vent Options. (3 pages) 136, 2/10/88 Pilgrim Activities Update. (2 pages) 137. 2/16/88 Restart Status, re: Pilgrim. (1 page)

Re: F01A-88-198 APPENDIX I/I RECORDS TO BE PLACEFIN THE PDR (Continued) 138. 2/17/88 ED0 Highlights, re: Pilgrim Activities Update. (2 pages) 139. 2/24/88 Director's Highlights. (3 pages) 140. 3/88 March 1988 Overview Report, re: Pilgrim. (2 pages) 141. 3/1/88 Director's Highlights. (2 pages) 142. 3/1/88 Safety Issues Management System, re: Pilgrim. (11 pages) 143. 3/2/88 Memorandum for Frank J. Miraglia from Thomas T. Martin, re:

Accelerated Emergency Operating Procedure Assessment, with enclosure. (2 pages) 144. 3/8/88 Licensing Action Report, re: Pilgrim. (2 pages) 145. 3/8/88 Pilgrim Restart TACs to be Completed. (1 page) 146, 3/9/88 Director's Highlights, re: Pilgrim Activities Update.

(2 pages) 747. 3/14/88 Restart Status, re: Pilgrim. (1 page) 148. 3/14/88 Regulatory Information Tracking System Printout, re: Pilgrim.

(10 pages) 149. 3/15/88 Note to Phil Stohr from Dan Mcdonald, with attachment.

(2 pages)

, 150. 3/22/88 Memorandum for Frank Miraglia f,om Thomas M. Novak, re:

l Response to Kennedy Question 9 on Pilgrim, with enclosure.

i (4 pages) 151. 3/22/88 Director's Highlights. (2 pages) 152. 3/28/88 Note to Steve from Dan, re: Proposed Public Meeting on Pilgrim to Addres* the Public Curaents on Restart. (1 page) 153. 10/30/85 Letter to N. J. Palladino fro:n William D. Harrington, re:

Pilgrim Nuclear Power Station Unit #1 Environmental Qualification Extension Request. (2 pages) 154. 11/26/85 Letter to N. J. Palladino from W. D. Harrington, re: Pilgrim Nuclear Power Station Unit #1 Environmental Qualification Extension Request, with attachment. (3 pages)

l Re: F01A-88-198- j APPENDIX I/I- ,

RECORDS TO BE PLACED IN THE PDR- )

(Continued) 155. 12/5/85 Memorandum for William J. Dircks and Herzel H. E. Plaine from ]'

Samuel J. Chilk, e: Staff Requirements - Affirmation / Discussion and Vote, 4:00 t ., Tuesday, November 26, 1985, Commissioners' Conference Room, 0.C. Office (0 pen to Public Attendance).

l (2pages) 156. 11/26/86 Letter to the Honorable William B. Golden from James M. Taylor, re: Docket No.- 50-293(10.CFR2.206). (1 page) 157. 8/28/87 Draft Letter to Congressman Studds. (3 pages) 158. Undated Draft Letter to the Honorable Michael Dubkis from Lando W. Zech.

(3pages) j 159. Undated Draf t Letter to the Honorable John Kerry from Lando W. Zech, l with attachment. (4 pages) I 160. Undated Letter to the Honorable Edward M. Kennedy from Lando W. Zech, with enclosures. (5 pages) 161. Undated Handwritten notes. (2 pages)

)

162. 7/7 Handwritten note, re: 6/29 Meeting.. (1page) l 165.11/23/87 Restart Status, re: Pilgrim. (1 page) 164. 3/21/88 Restart Status, re: Pilgrim. (1page) i l

Re: F01A-88-198 APPENDIX J/J RECORDS PARTIALLY WITHHELD - EXEMPTION 5

-1. 10/24/85 SECY-85-338, " Environmental Qualification Extension Request Post-November 30, 1985 for the Pilgrim Nuclear Power Station, Unit 1," (4 pgs.) - Partially Released, with enclosure:

Draf t Letter to William D. Harrington from Samuel J. Chilk, re: Pilgrim !!uclear Power Station, Unit 1, (1 pg.) - Withheld.

2. 11/22/85 SECY-85-338A, " Revised Environmental Qualification Extension Request Post-Novembar 30, 1985 for the Pilgrim Nuclear Power Station, (4 pgs.) - Partially Released; with enclosures:

Letter to Domenic B. Vassalo from W. D. Harrington, subject:

" Pilgrim Nuclear Power Stetion Unit #1 Environmental Qualification Extension Request," (4 pgs.) - Released; and Draft Letter to William D. Harrington from Samuel J. Chilk re: Pilgrim Nuclear Power Station," (1 pg. ) - Withheld.

3. 3/24/86 Letter to John A. Zwolinski from W. D. Harrington, re: License DPR-35, "Long Term Program - Semiannual Update," Acc. No. 8603270277, w/ attachment: Handwritten Internal Note Re: TAC 66094, (1 pg.) -

Withheld.

I

l

.i 1

i Re: F01A-88-198 L APPENDIX K/K l~ RECORDS TOTALLY TTITITHELD - EXEMPTION 5 j

1. 10/28/85 Notation Vote Response Sheet to Samuel J. Chilk from Commissioner Asselstine, re: -SECY-85-338 - Environmental Qualification (EQ)ExtensionRequestPost.-November for the Pilgrim Nuclear Power Station, Unit 1. (1 page30)1985
2. 10/30/85 Notation Response Sheet to Samuel J. Chilk from Commissioner Zech, re: SECY Paper 85-338 (Environmental Qualification (EQ)

Extension Request Post - November 30, 1985 for the Pilgrim Nuclear Power Station, Unit 1. (2 pages) Exemption 5

3. 11/3/85 Notation Vote Response Sheet to Samuel J. Chilk from Chairman Palladino re: SECY-85-338 - Environmental Qualification (EQ), Extension Request Post - November for the Pilgrim Nuclear Power Station, Unit 1. (2 pages30,)1985
4. 11/6/85 Notation Response Sheet to Samuel J. Chilk from Commissioner Roberts, re: SECY Paper 85-338, Environmental Qualification (EQ) Extension

' Request Post - November 30, 1985 for the P_ilgrim Nuclear Power Station, Unit 1. (1 page)

5. 11/25/85 Notation Vote Response Sheet to Samuel J. Chilk from Chairman Palladino re: SECY-85-338A - Revised Environmental Qualification (EQ), Extension Request Post - November 30, 1985 for the Pilgrim Nuclear Power Station. (2pages)
6. 11/26/85 Notation. Vote Response Sheet to Samuel J. Chilk from Commissioner Roberts, re: SECY-85-338A - Revised Environmental Qualification (EQ)ExtensionRequestPost-November 30, 1985 for the Pilgrim Nuclear Power Station. (1 page)
7. 11/26/85 Notation Vote Response Sheet to Samuel J. Chilk from Commissioner Zech, re: SECY-85-338A - Revised Environmental Qualification (EQ) Extension Request Post - November 30, 1985 for the Pilgrim Nuclear Power Station. (1 page) Exemption 5
8. 11/26/85 Notation Vote Response Sheet to Samuel J. Chilk from l Commissioner Asselstine, re: SECY-85-338A - Revised EnvironmentalQualification(EQ)ExtensionRequest  ;

Post - November 30, 1985 for the Pilgrim Nuclear Power j Station. (1 page) ,

9. 11/26/85 Notation Vote Response Sheet to Samuel J. Chilk from Chairman Palladino, re: SECY-85-338A - Revised EnvironmentalQualification(EQ)ExtensionRequest Post - November 30, 1985 for the Pilgrim Nuclear Power Station. (2 pages) 1

. He: F0lA-88-198 APPENDIX K/K RECORDS TOTALLY WITHHELD - EXEMPTION 5

10. Undated Internal Notes regarding Pilgrim - NRR Project Manager Assessment (2pages).
11. 1/5/88 Facsimile Request to Dick Wessman from Roy Fuhrmeister bearing handwritten internal notes regarding Pilgrim (1 page) attaching Draft Questions and Answers for Kennedy Hearing (9 pages) i i

1 l

f u ___ ______ _ _