ML20205N958
| ML20205N958 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 10/07/1988 |
| From: | Grimsley D NRC |
| To: | Johnson G SWIDLER & BERLIN |
| Shared Package | |
| ML20205N963 | List: |
| References | |
| FOIA-88-198 NUDOCS 8811070125 | |
| Download: ML20205N958 (7) | |
Text
-,
,v e nn6uvm.vn, s v, mi. v, o :.
[T.\\
assro se r.rs
~
RESPONSE TD FREEDOM CF I'*^'
I ^ I ""'
i i
(s
[,,
INFORMATl074 ACT (FLIA) REQUEST OM
'l1988
....e DOCatt avvWetA ss 6# empas. eel Af0VtSTER Georie E. Johnson, Esquire 50-293 PART f.-Rf COROS RELEASED OR NOT LOCATED (See checaed bonest No agency records owbrect to the request have been located.
No addetonal agency records evbrect to te request have been located.
Agency records e.4ect to the roovest that are identfed in Appendia 5
are already ava We for pwN.c irepoten and copyeg m me NRC Pese Docsment Room, X
1717 H Street. N W.. Waehegton DC Agency tocorde svt,pect to the request that are denter d e) Appendia _
L*
e e,e be g maae,,sa.bie io, poe.c pect.n and copy g in tre NRC rotSc oocumeai X_ Room,1717 H Street. N W.. WasNagion, DC. in a foeder under the FOIA numtee and teowester name.
The nonpropretsy versen ei the propose 41 that you egreed to accept m e telephone corworsaton wth a member of my staM e now boeg made eveeable for putec bepecten and coveg at me NRC PutAc Document Room,1717 H Street, N W. Washegton. DC e a fonder wreer the FotA number and war name.
Enctoe4 e informaten on have you may obtae eccses to and the c4<ges for copyeg records pieced n tre NRC PutAc Document Room.1717 H Street, N W. WasNngsm, DC.
Agency recceds e,bre:t to the re@est are encic+ed Any apphcatdo cha*ge for copes of the records proveed and paycwet p*ocedures are noted in the comments sectot.
Reco<de swW1 to the teowest >sse been teie<ved to another Federal agencytes) for review a d+'ect response to you.
In view of NRC's respoese to the reo.est. ro fwriter acten 's beeg taken on accead 'ene< oath PART 11 A.tNFORM ATION WTTHHELO N.CM Pustic DISCLOSURE C.,ta efematen a w.%e..d,oco,0. e b.m md fe put+c dui
.<e pe.useno we Foix e. ewes demeed, and i, ce rea.on. eisied in re,t n. eu.
i.on. s. C. and o Aay,=esed po,t-e e ce decom..
.. oh.ch usy p.ut tre eu d a teeg eee e,. te.,, mue,,.w. e, pot *c in.pect.on and copy g a ce NRC rotAc on e.ni Room. i?ir H si,eei. N w. we.hegion. oC... we. vado, n Foir %mee, and,oweste, na, Commeate
- Copies of Appendix L records are also being placed at the Local Public Document Room maintained in the Plymouth Public Library,11 North Street, Plymouth, MA.
8811070125 001007 PDR FOIA JOHNSONOB-198 PDR S
- f. 0'escf 04 DYS Ce 894 0sICoaOS s
NIC f OR M 444 p.
93
y
~
'a~
.~ ; L
.)
a
- l
,f g%
i 4
4 Re: FOIA-88-198
[
APPENDIX K RECORDS MAINTAINED IN THE PDR 1.
Undated Letter to F. M. Stazesky from Richard C. DeYoung, with
'W' enclosures.
(22 pages), PDR Accession No. 8202250190 820118 2.
Undated NUREG-1250 entitled, "Report on the Accident at the Chernobyl Nuclear Power Station."
(214 pages), PDR Accession No. 8702170005 3.
11/30/71 Letter to R. S. Boyd from G. Laines, re: Steam Bypass Problem of BWR Pressure Suppression Containments.
(3pages),PDR Accession No. 8308090846 4.
9/20/72 Letter to J. F. O' Leary, et al, from S. H. Hanauer, with '
enclosure.
(8pages),PDRAccessionNo. 8712150213 5.
10/2/72 Letter to A. Giambusso from Joseph M. Hendrie, re:
Recomendations for Additional Surveillance Requirements for Pressure Suppression Containments.
(2 pages), PDR Accession No. 8707080487 6.
2/14/75
. Letter to Maurice J. Feldmann from Dennis L. Ziemann, with enclosurc.
(5 pages), PDR Accession No. 8712150323 7.
4/17/75 Letter to Maurice J. Feldmann from Dennis L. Ziemann, with enclosures.
(7 pages), PDR Accession No. 8712140196 8.
7/78 NUREG-0474 entitled, "A Technical Update on Pressure Suppression Type Containments in Use in U.S. Light Water Reactor Nuclear Power Plants." (186pages),PDRAccessionNo. 7911140435 NotetoJohnF.O' Leary)fromJosephM.Hendrie,with 9.
9/25/78 attachments.
(14 pages, PDR Accenion ho. 8610080082 860731
- 10. 6/80 Manual of Protective Action Guides and Protective Actions for Nuclear Incidents.
(184 pages), PDR Accession No. 81111302C9 11, 3/81 NUREG-0713, Volume 1, entitied, "Occupational Radiation Exposure at Comercial Nuclear Power Reactors," (1979 Annual Report).
(111pages),PDRAccessionNo. 8104030230 12, 7/81 NUREG-0008 (formerly NUREG-75/087), entitled, "Standard Review Plan."
(920pages),PDRAccessionNo. 8110140308 13.
12/81 NUREG-0713. Volume 2, entitled, "Occupational Radiation Exposure at Commercial Nuclear Power Records," (1980 Annual Report).
(100 pages), PDR Accession No. 8201070348 NUREG-0714,(Volume 1, entitled, "Occupational Radiation (108 pages
- 14. 8/82 Exposure," Twelfth Annual Report 1979).
Accession No. 8209010444 15.
10/27/82 Technical Report TR-5310-1, re: Mark I Containment Program, entitled, "Plant-Unique Analysis Report of the Torus Suppression Chamber for Pilgrim Station - Unit 1."
(144 pages). PDR Accession No. 8301040239
T' m.
y, Re: LF01A-88-198:
- APPENDIX K (Continued) 16.
11/82-MUREG-0713, Volume 3, entitled, "Occupational Radiation /
Exposure at Commercial: Nuclear Power Reactors," (1981' Annual.
Report).
(118pages),PDRAccessionNo. 8212270459 17, 11/16/82 Letter to William D.'Harrington from Ronald C. Haynes, with
- Performance (SALP)ystematic-Assessment of Licensee enclosures, re: S
., (55 pages)..PDR Accession R'
No. 8211290492 821116 18.: f6/20/83 MASSPIRG release, entitled', "Blueprint for CHAOS II: Pilgrim Disaster Plans Still a Disaster."- (102 pages), PDR Accession No. 8712140233 19.
10/83 NUREG-0714, Volumes 2 and 3, entitled, "Occupational Radiation Exposure," (Thirteenth and Fourteenth Annual Reports,1980 and 1981).
(64 pages), PDR Accession No. 8311010490 20.
10/26/83 Letter to Domenic B. Vassallo from W. D. Harrington, with w
attachments, re: Mark I Containment Program:
Plant Unique Analysis (NUREG-0661).
(88 pages), PDR Accession No. 8311010218 831026 21.
12/83 NUREG-0713, Volume 4, entitled, "Occupational Radiation Exposure a' coninercial Nuclear Power Plants," (1982 Annual Report).
(129 pages), PDR Accession No. 8401230162 22.
1/30/85 Letter to William D. Harrington from Domenic B. Vassallo, with MarkIContainmentLong)TermProgramat enclosures, re:
(5 pages, PDR Accession Pilgrim Nuclear Power Station.
No. 8502140217 850130 23, 3/85 NUREG-0713, Volume 5, entitled, "Occupational Radiation Exposure at Commercial Nuclear Power Reactors," (1983. Annual Report).
(128 pages), PDR Accession No. 8504050287 24.
8/15/85 Letter to William D. Harrington from Thomas T. Martin, with enclosure, re:
Inspection Report No. 50-293/85-24 (5 pages),
PDR Accession No. 850827049 850815 25.
10/85 NUREG-0714, Volumes 4 and 5, entitled, "Occupational Radiation Exposure,"(FifteenthandSixteenthAnnualReports,1982and1983).
(53 ptges), PDR Accession No. 8511220012 26.
10/30/85 Letter to Robert J. Boulay. from Edward A. Thomas.
(3 pages),
PDR Accession No. 8712140303 27.
12/31/85 Letter to William D. Harrington from Thomas T. Martin, with enclosures, re:
Inspection Report No. 50-293/85-32.
(70pages),PDRAccessionNo. 8601070174 851231
[
a y,s
-w
,-,.w,-
'W s.
~
Re:
F0!A-88-198 APPENDIX K' o
(Continued)-
- 28. 2/18/86 Letter to William D. Harrington from Thomas E. Murley, with enclosures, re: Systematic Assessment of Licensee Perfonnance (SALP) Report No. 50-293/85-99.
(M pages), PDR Accession No. 8602240202
- 29. 4/12/86 Letter to William D. Harrington from Thomas E. Murley, re: Confinnation of Actions to be Taken with Regard to the Pilgrim Plant Events Which Occured on April 11-12, 1986.
(2pages),PDRAccessionNo. 8604210211 860412
- 30. 5/22/86 Statement of Comissioner James K. Asseltine, U.S. Nuclear Regulatory Comission before the Subcommittee on Energy Conservation and Power Comittee on Energy and Comerce.
(5pages),PDRAccessionNo. 8606100493 860522
- 31. 5/23/86 Letter to William D. Harrington from Thomas E. Murley, with enclosures, re: Systematic Assessment of Licensee Performance (SALP) Report No. 50-293/85-99.
(4 pages), PDR Accession No. 8605300124 860523
- 32. 6/6/86 Letter to Edward A. Thomas from Robert J. Boulay.
(2 pages),
PDR Accession No. 8712140224
- 33. 6/26/85 The Comonwealth of Massachusetts Departr:ent of Public Utilities, D.P.U. 85-266-A.
(339 pages), PDR Accession No. 8712140300
- 34. 7/15/86 Petition for Show Cause Concerning Pilgrim I Nurlear Power Station.
(S2 pages), PDR Accession No. 8607180125 35, 8/12/86 Letter to The Honorable William B. Golden from James M. Taylor, with enclosure.
(5 pages), PDR Accession No. 8608200426 36, 10/86 NUREG-0713, Volume 6, entitled, "Occupational Radiation Exposure at Comercial Nuclear Power Reactors and Other Facilities 1984,"
(Seventeenth Annual Report).
(175 pages), PDR Accession No. 8610210395
- 37. 9/16/86 Report to the Governor on Emergency Preparedness for an Accident at the Pilgrim Nuclear Power Station. (289pages),
PDR Accession No. 8712140208 38.
12/19/86 Letter to The Honorable William B. Golden from James M. Taylor.
(3 pages), POR Accession No. 8612310095
- 39. 3/87 Report to the Selectmen on The Plymouth Radiological Emergency Response Plan by the Town of Plymouth Comittee on Nuclear Matters.
(11pages),PDRAccessionNo. 8705060356
- 40. 4/7/87 Letter to Chainnan Zech from Gerry E. Studds.
(1 page), PDR Accession No. 8705060351
~
Re: FOIA-88-198 APPENDIX K (Continued)
- 41. 5/21/87 Letter to The Honorable Gerry E. Studds from Lando W. Zech.
(2 pages), PDR Accession No. 8705290163
- 42. 8/5/87 Letter to Thomas Murley from Rachel Shimshak, with enclosure.
(34 pages). PDR Accession No. 8712140238
-E 43.
10/23/87 Letter to Lando W. Zech, Jr. from John Kerry, with attachment.
(3 pages), PDR Accession No. 8712300018 l
44.
12/3/87 Letter to The Honorable John Kerry from Lando W. Zech, Jr.
(2pages),PDRAccessionNo. 8712300010
/
q l
l I
i 1
Re:
F0!A-88-198 APPENDIX L RECORDS BEING PLACFD IN THE POR UNDER THE'ABOVE REQUEST NUMBER Newspaper article entitled, "Pilgrim to Stay) Shut 6 More Weeks 1.
Undated to' Deal with Management Troubles." (2 pages '
l 2.
Undated Newspaper article entitled, "NRC' Orders Pilgrim to Remain Shut." (1 page) l 3.
Undated ' Letter to A. Corey from Norman C. Moseley,.with enclosures, re: Perfonnance Appraisal Inspection 50-293/81-20.
(57pages) inIye[
4.
Undated PNPS-FSAR Sectien 5 Containment Report.
(30pages) y',
'd
.5.
2/19/76 American National Standard Administrative Controls and Quality Assurance for the Operation Phase of Nuclear Power Plants, Z
Revision of N18.7-1972.
(2 pages) 6.
6/19/82 Prt.mpt Alerting and Notification System Test Observer Questionnaire Form.
(1 page) 7.
1/24/83 Report by the Federal Emergency Management Agency re:
Pilgrim Nuclear Power Station Siren Test of 6/19/82.
(24 pages)
Office Pemorandum to C. J. Mathis from H. F. Brannanl 8.
1/25/85 I
re: Surveillance Finding No. 85-1, 2-1-1.
(5 pages 9.
9/27/85 Letter to the NRC's Occument Control Desk from W. D. Harrington, re:
Docket No. 50-293; License DPR-35.
(3 pages)
- 10. 6/18/85 Newspaper article written by Fred Kaplan entitled, "NRC says Pilgrim Skipped Routine Tests." (2 pages) 11.
2/21/85 Office of Inspection and Enforcement Report, re:
IE Information Notice No. 85-13:. Standby Liquid Control System Squib Valves Failure to Fire.
(8 pages) 12.
5/21/86 Newspaper article written by Larry Tye entitled, "NRC Orders Pilgrim to Remain Shut." (1 page) 13.
5/23/86 Newspaper article written by Adam Pertman entitled, "Pilgrim on List of Worst-Run Nuclear Units."
(2pages) 14.
5/26/86 Newspaper article written by Larry Tye entitled, "Chernobyl Accident...
Can it Happen Here?"
(4 pages)
- 15. 6/9/86 Articles in "Inside NRC" discussing Pilgrim.
(2 pages)
Newspaper article entitled,("Charges of Nuclear Cover-up and 16.
6/21/86 Collusion Have no Merit."
1 page) 17.
6/27/86 Newspaper article written by Bruce D. Butterfield entitled, "DPU Blasts Edison, Cites ' Paralysis' at Top."
(2pages)
Re: F0!A-88-198 APPENDIX L
- (Continued)
RECORDS BEING PLACED IN THE POR UNDER THE AB0VE REQUEST NUMBER 18.
6/28/86 Newspaper article written by Anne Bartlett er..itled, "Two Towns Want out of Pilgrim Evacuation Plan." (2 pages)
- 19. 7/9/86 Newspaper article written by Jean Demc,s entitled, "Judges Asked to Limit Pilgrim Picketing."
(1page) 20.
3/07 Report by the Town of Plymouth Comittee on Nuclear Matters to the Selectmen on the Plymouth Radiological Emergency Response Plan.
(89 pages) 21.
6/87 Standari P view Plan for the Review of Safety Analyisi Reports for Nuc; ear Power Plants.
(250pages)
- 22. 8/5/87 Letter to Thomas Murley, from Rachel Shimshak, with enclosures.
(34pages) 23.
10/28/87 Letter to' Ralph G. Bird from Steven A. Varga, re:
Proposed Enhancements to the Mark I Containment - Pilgrim Station, with attached telecopier cover letter and other enclosures.
(5 pages)
SWIDLER & BERLIN munuo looo K STRitT. Pd W nm>
WASHINGTON, D C. Moobledn (202) 944 4 500 Tna won TRJCO,tsa (702)9444296 March 25, 1988 TREEDOM 0F INFORMATION ACT REQUEST Director Office of Administration For4 4f./9g U.S'.; Nuclear Regulatory Commission h M/-[k Washington, D.C.
20555 In re Freedom of Information Act Request No. 88 __, Concerning Pilgrim Nuclear Pouer Station
Dear Sir:
In accordance with the prov!.sions of the Freedom of Information Act, 5 U.S.C. 5552 and Part 9, Subpart A of 10 C.F.R., it is requested that the records identified below be made available for inspection and copying:
1.
Records *of any votes taken by the Commission, and records or transcripts of Commission meetings, with respect to the shutdown of the Pilgrim Nuclear Power Station, or the restart thereof, on or after April 12, 1986.
2.
All SECY papers, attachments thereto, records and other materials su$ porting or forming the basis for positions taken therein on the subject of the Pilgrim Nuclear Power Station, prepared on or after January 1, 1980.
3.
All records prepared or dated on or after January 1, 1980 (but excluding documents included on Docket No. 50-293 accession listings available from the Public Document Room) of NRC Region I, the Office of the Executive Director for Operations, the Office of Inspection and Enforcement, the Office of Investigations, the Office of Nuclear Reactor Regulation, the Office of Nuclear Materials Safety and Safeguards, the Advisory Committee for Reactor Safeguards, the Office for Evaluation of Operational Data, and the NRC Emergency Operations Center which discuss, refer to, take positions on, or form the basis for decisions concerning, the performance of the Pilgrim Nuclear Power Station in the following areas:
g>v }J n C
-,_ i.
vo cM 3 DI 90 7 ~
c i
A.
Managet.ent B.
Staffing C.
Organization and Orianization Structure D.
Radiation Protectiot E.
Quality Assurance F.
Surveillance G.
Maintenance H.
Offsite Emergency Planning 1.
Fire Protection J.
Security K.
Management Response to NAC Regulatory Activities 4.
All records of Region I, the Office of Nuclear Reactor Regulation, the Commission, the Of fice of Inspection and Enforcement, or other Staf f or Commission of fices relating to, discussing or forming the basis or support for, the Director's Decision (DD-87-14) dated August 21, 1987.
5.
All records (other than those categories of documents excluded from Item 3) of any office referred to in Item 4, above, discussing, describing, assessing, evaluating, or otherwise relating to actions by the NRC staf f, FEMA, the ACRS, or other NRC or Commission of fices, to follow-up or monitor actions by Boston Edison Company, the Commonwealth of Massachusetts, other jurisdictions within the 10-mile emergency planning zone for Pilgrim Nuclear Power Station, to address issues raised in the Director's Decision (DD 14) dated August 21, 1937.
6 All records of the NRC of fices referred to in Item 4 discussing, describing, assessing or evaluating, or otherwise relating to actions of the NRC staf f to evaluate the July 1987 Restart Plan, and other actions by Boston Edison Company, its agents or contractors, relating to the restart of the Pilgrim Nuclear Power Station.
7.
All records of communications (whether written or oral and occurring from April 12, 1986 to the present) between any of fice of the NRC Staf f, or of the Commission or of fices reporting directly to it, and Boston Edison Company, i
concerning the status or startup of the Pilgrim Nuclear Power Station.
8.
All records of communications (whether written or oral, and occurring from April 12, 1986 to the present) between any of fice of the NRC Staf f or of the Commission or of fices reporting directly to it, and FEMA, other Federal or State agencies or governmental entities, or persons concerning the status, startup, or issues relating to startup, of the Pilgrim Nuclear Power Station.
a
9.
All records in the possession of any NRC Staff or Commission office pertaining to (a) the evaluation by FEMA, NRC, or any other entity or agency, of the adequacy of offsite emergency plans for the Pilgrim Nuclear Power Station, and (b) the conduct and/or evalustion of drills, full scale / full participation or partial scale / partial participation exercises conducted or planned for the Pilgrim Nuclear Power Station.
For purposes of this request, "record" or "document" is defined to include, but not be limited to, notes, memoranda, reports, meeting minutes, logs, transcripts, letters, position or policy papers, interpretations of requirements, and guidance documents, and refers to drafts as well as any final version of
.iny record or document requested.
Sine t ly, I
(
sf Hi-k
>o eE Jo son, Esq.
(202)944-438 GEJ/veg l
i I
i 4
t i
i