ML20206C345
| ML20206C345 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 10/18/1988 |
| From: | Grimsley D NRC |
| To: | Johnson G SWIDLER & BERLIN |
| Shared Package | |
| ML20206C347 | List: |
| References | |
| FOIA-88-198 NUDOCS 8811160235 | |
| Download: ML20206C345 (4) | |
Text
\\.J.O m y, y, FOIA-88-198
-,,\\
.tgecmsg r.pg l
RESPONSE TO FREEDOM CF l'*^t l A l "*'
lNFORMATICN ACT (FOl.4) REQUEST OCT 181988 cam.,vo.. s, ~
..OVilft.
George E. Johnson. Esquire 50-293 PART 3.-RECOROS Rf Lt ASED OR 8 07 LOC 47tD (5.e caer.e/ eos I No.gew,,. cord..vbsset to P.,equ t bev. besa loc.t.d.
N..dspio,W.g.ac,,oco,d. Nbsect to t.,ogwe.1 h.v. besa ic s.ted.
Ageacy,oco,0. m.,bysci to th.
ows.t tk.t. c.at#.d e Am.een
.>. 6r +,
.l.td. eo, put rec.ctea.*uf cop,v J m t. hmC PW Documeat Room.
a XX 1717 M street. N W. w hqtoa. DC.
.*. beg m.d.
.t.ed. e, pm r.c.c1 a.r4 cop,iag. f. hmC P.bbc Occm Agency ceae..ut., set te th.,oav t th.t. as.et#.d in Ameadka o
XX Ra a. in7 w s
- t. = w. w ace oa. oc, a e vow-ao
- e. eosa -4.,
.ae....i., n.~
th. ao,,,w,.u,y a e e.
w.i ec veo.e
- i..a.m e. t
+w co.,w ta. ~,, e,,,.u.e.
i.e., n.~.u
.ut. i.,,ou
-1.a m
c.,e..i e. ~Rc em e
~ai R
. in7 w sv.c. ~ W. w.m oc... eoe, oao, e. soi4 v4.,.a4,e tactosos a cee,m. ten sa how,ow me, ott.e.cc.e. to.ad N cesse. 4, copyeg,. cord. piu.d e e. NRC Pwbhc Docw.at Room.1717 H s*wt. N W, W hegion. DC n
a
..c.
wb,-4 = e.....acio u, =#..e. ce+ e. e- <w e u,u m.o.4.a.
,~at,,. 4..
.. ne.4. u -t.
c.
- Rao, we,.co. ~ % t
.t e.
..ao~,r.o.w. m e,,
,xt.
wa i.,co.
ia - e uRc.
ae.. e...w. a. e,e, u.oa. we==.a.a e e
.c.o PART al A-lhPORW4flCN wtTHMILD FROM PUGLIC OISCLOSURE c.n
,~toa. * %.wo,--o.. % ~er.u e,om eeu. e*w. ww.en. u so,4...wim we.o..e4 e. e.. n.ww a c.,s m..=-
- e. nRc poe c occ-i Room. m ? w soni. N W. w..seem. oc. a e u,x... w. -. beq ~ a...uu. S,,oe s.a.e4 co,q.
,. e. c..e. o o,.
- e n et e, u.~,
.**s-.ao,e4eoia
-4..,<
com~ai.
- Copies of Appendix N records are also being placed at W Local Public Document Room maintained in the Plymouth Public Library.11 North Stt eet, Plymouth. MA.
i i
1 I
d h h 5 001010 JOHNSON 00-190 PI)n
~
gr '.as e.gC,C. 0,v'l of.
0 4Come b
_V Mifur".
/
i l
eine so m W.se...
.O
Re:
F0!A-88-198 APPENDIX M RECORDS ALREADY IN THE PDR 1.
6/19/87 Letter to The Honorable Gerry E. Studds from Thomas M. Roberts, with enclosures.
(16 pages) PDR Accession No. 8706250529 870619 2.
9/18/87 Letter to Chaiman Zech from Gerry E. Studds, with enclosures.
(20pages)PDRAccessionNo. 8712070069 871124 3.
10/9/87 Letter to Charlss V, Barry from Lando W. Z.ch, 'r., with enclosure.
(13 paget) POR Accession No. 8710230006 4.
11/12/87 Preliminary Notification of Event or Unusual Occurrence, PNO-!-87-105, re: Loss of Offsite Power.
(1 page) PDR Accession No. 8711180025 5.
11/24/87 Letter to The Honorable Gerry E. Studds from Lando W. Zech, Jr.,
with enclosure.
(4 pages) PDR Accession No. 8712070063 i
Re:
F0!A-88-198 APPENDIX N RECORDS TO BE PLACED IN THE PDR 1.
11/4/85 Memorandum for Hugh L. Thompson from Richard W. Starostecki, re: Licensing Action Review for Pilgrim - Proposed Revisions to Technical Specifications of Serve 111ance Instrumentation (TAC #57510).
(7pages) 2.
11/6/85 Letter to Raymond F. Fraley from Dade W. Moeller, with enclosure.
(7pages) 3.
7/1/86 Letter to Lando W. Zect., Jr. from Barney Frank.
(1 page) 4 8/20/86 Letter to James Lydon from Harry B. Kister, with enclosure, (8 pages)gement Meeting (50-293/86-30) re: Mana Held on July 30, 1986.
5.
4/1/87 Letter to The Honorable William B. Golden from Thomas E. Murley.
(2pages) 6.
4/15/87 Boston Edison Company Safety Enhancement Program.
(7pages) 7.
4/20/87 Letter to The Honorable Gerry E. Studds from James P. Allan, with enclosures.
(8pages) 8.
5/8-10/87 Netification, ro: Pilgrim. DN 50-293.
(1page) 9.
5/15/87 Letter to William T. Russell from R. G. Bird, with attachment.
(4pages) 10.
5/30/87 Letter to William T. Russell from R. G. Bird, re:
Report of Defect or Noncompliance as Required by 10CFR Part 21, Loose and/or Missing Bolts on Hydraulic Control Unit (HCU) Structural Frames, with attachment.
(3pages) 11.
6/2/87 Region 1 Morning Report, re: Pilgrim, ON 50-293.
(2 pages) 12.
6/5/87 Memorandum to X. P. Roberts from R. Swanson, re: HFA Relay Armature Replacement.
(4 pages)
- 13. 6/10/87 Office Memorandum with attachment, re: HFA Annature Binding.
(9pages) 14, 6/11/87 Kegion ! Morning Report, re: Pilgrie,, ON 50-293.
(1page) 15, 6/16/87 Notice of Licensee Meeting scheduled for 6/29/87 at 1 pm, re: Pilgrim liucIvar Power Plant (4 pages)
- 16. 6/19/87 Letter to The Honorable Gerry E. Studds from Thomas M. Roberts, with enclosure.
(8 pages)
Re:
F01A-88-198 APPERDIX N RECORDS TO BE PLACED IN THE PDR (Continued) t
- 17. - 7/1/87 Region 1 Morning Report, re: Pilgrim, DN 50-293.
(1page) 18, 7/7/87 Region I Morning Report, re: Pilgrim, DN 50-293.
(1page)
- 19. 7/8/87 Region I Morning Report, re:
Pilgrim, DN 50-293.
(1page) i i
20, 9/8/87 Region ! Morr.ing Report, re:
Pilgrim, DN 50-293.
(2 pages) 1
- 21. 9/24/87 Letter to The Honorable William 8. Golden from Samuel J. Chilk, re: Docket No. 50-293(2.206).
(1page) t
- 22. 9/29/87 Letter to Robert J. Boulay from William T. Russell.
(1page) l 23.
12/10/87 Memorandum to W. Lazarus from C. Conklin, re: Pilgrim ?,tation Annual Exercise Performance Sumary.
(2 pages) l, 24, 12/18/87 Letter to Lando W. Zech, Jr. from Edward M. Xennedy.
(1page) 25.
12/18/87 Telephone Report dated 12/17/87,re:
Pilgrim Restart Hearing by Full Senate Committee.
(2pages)
- 26. Unda ted Certified Index, re: Pilgrim, DN 50-293.
(10pages)
I i-a 4
l i
.j.
SWIDLER & BERLIN p
CHAA11MD 5000 K STREET. P T p
TA$HINGTON D C sonoys.:
(202) M4-4 600 Tatsx MttH TILACOMia (2021944 42%
March 25, 1988 FRED 0'A 0F INFORMADOE Fora -QUEST 1s-ACT RE Director Office of Administration U.S. Nuclear Regulatory Com.nission Washingcon, D.C.
20555 b DUN In re Freedom of Information Act Request No. 88 __, Concerning Pilgrim Nuclear Power Station
Dear Sir:
In accordance with the provisions of the Freedom of Information Act, 5 U.S.C. 5552 and Part 9.
Subpart A of 10 C.P.R.,
it is requested that the records identified below be made available for inspection and copying:
1.
Records of any votes taken by the Commission, and records or transcripts of Commission meetings, with respect to the shutdown of the Pilgrim Nuclear Power Station, r the restart thereof, on or after April 12, 1986.
2.
All SECY papers, attachments thereto, records and other naterials supporting or forming the b* sis for positions taken therein on the subject of the t.' grim Nuclear Power station, prepared m or after January 1, 1980.
3.
All records prepared or dated on or after January 1, 1980 (but excluding documents included on Docket No. 50-293 accession listings available from the Public Document Room) of NRC Region I, the Of fice of the Executive Director for Operations, the Office of Inspection and Enforcement, the Office of Investigations, the Office of Nuclear Reactor Regulation, the Office of Nuclear Materials Safety and Safeguards, the Advisory Committee for Reactor Safeguards, f
the Office for Evaluation of Operational Data, and the NRC Emergency Operations Center which discuss, refer to, take positions on, or form the basis for decisions concerning, the performance of the Pilgrim Nuclear Power Station in the following areas:
[h l
'f
~
-)
_ _ _ _ _ _ _ e i
.A.
Management B.
Staffing l
C.
Organization and Organization Structure D.
Radiation Protection E.
Quality Assurance F.
Surveillance G.
Maintenance H.
Offsite Emergency Planning I.
Fire Protection J.
Security
(
K.
Manage.ent Rnsponse to NRC Regulatory Activities 4.
All records of Region I, the Office of Nuclear Reactor Regulation, the Commission, the Office of Inspection and t
Enforcement, or other Staff or Commission offices relating to, discussing or forming the basis or support for, the Director's Decision (DD-87-14) dated August 21, 1987.
5.
All records (other than thoue categories of docu.ments t
excluded from Item 3) of any office referred to in Item 4, above, discussing, describing, assessing, evaluating, or otherwise relating to actions by the NRC staff, FEMA, the ACRS, or other NRC or Commission offices, to follow-up or monitor actions by Boston Edison Company, the Commonwealth of Massachusetts, other jurisdictions within the 10-mile i
emergency planning zone for Pilgrim Nuclear Power Station, I
to address issues raised in the Director's Decision (DD l i
- 14) dated August 21, 1987.
6.
All records of the NRC offices referred to in Item 4 i
discussing, describing, assessing or evaluating, or i
otherwise relating to actions of the NRC staff to evaluate the July 1987 Restart Plan, and vther actions by Boston L
Edison Company, its agents or centractors, relating to the
[
restart of the Pilgrim Nuclear Power Station.
l i
7.
All records of communications (whether written or oral and L
occurring from April 12, 1986 to the present) between any of fice of the NRC Staf f, or of the Commission or of fices j
reporting directly to it, and Boston Edison Corpany, concerning the status or startup of the Pilgrim Nuclear Power Station.
(
i 8.
All records of communications (whether written or oral, and occurring from April 12, 1986 to the pensent) between any
[
office of the NRC Staff or cf the Commission or offices reporting directly to it, and FEMA, other Federal or State agencies or governmental entities, or persons concerning the status, startup, or issues relating to startup, of the Pilgrim Nuclear Power Station.
l j
a 3
D.
All records in the possession of any NRC Staff or Commission office pertaining to (a) the ecaluation by FEMA, NRC, or any other entity or agency, of the adequacf of offsite emergency plans for the Pilgrim Nuclear Power Station, and
)
the conduct and/or evalustion of drills, full scale /f...
participation or partial scale partial participation axercises conducted or planned for the Pilgrim Nuclear Power Station.
For purposes of this request, "record" or "document" is defined to include, but not be lin ed to, notes, memoranda, reports, meeting minutes, logs, tr a..s cripts, letters, position or policy papers, interpretations of requirements, and guidance documents, and refers to drafts as well as any final version of any record or document requested.
Sine t ly, LC t*
IL k f
- pdos e E/ Jo son, Esq.
(202)S44-438 GEJ/veg J