ML20206F326

From kanterella
Jump to navigation Jump to search
Further Response to FOIA Request for Six Categories of Documents Re Facilities.App a Documents Available in Pdr.App B & C Documents Encl.Documents Also Available in Pdr.W/O App B & C Documents
ML20206F326
Person / Time
Site: Pilgrim, Limerick, Vermont Yankee, Maine Yankee, 05000000, 05000471
Issue date: 06/13/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Burnstein D
WILLIAMS, JACKSON & SPERO
References
FOIA-86-58, RTR-REGGD-1.042, RTR-REGGD-8.008 NUDOCS 8606240423
Download: ML20206F326 (8)


Text

-

91)R-o/fo

. a uc uy3 UNITED STATES 4

[

g NUCLEAR REGULATORY COMMISSION 7;

j WASHINGTON, D. C. 20655 JUN 131986 Docket No. 50-293 Daniel Burnstein, Esquire Williams, Jackson, and Spero 50 Staniford Street IN RESPONSE REFER Boston, MA 02114 TO F0IA-86-58

Dear Mr. Burnstein:

This is in further response to your letter dated January 22, 1986, in which you requested, pursuant to the Freedom of Information Act (F0IA), six categories of records regarding the Pilgrim and Maine Yankee plants.

During an April 9,1986, telephone conversation with Mr. Stephen Isaacs of my staff, you agreed to pay the $12.00 per hour fee for professional search time and five cents ($0.05) per page reproduction cost. You also requested that wt search the Pilgrim files only, and that the search should not exceed 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br />.

The documents listed on the enclosed Appendix A are already available for public inspection and copying at the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555. The accession number, or microfiche number, is identified beside each record description.

Copies of the documents listed on the enclosed Appendices B and C are enclosed.

c Copies are also being placed in the NRC PDR and the NRC Local Public Document Room (LPDR) located at the Plymouth Public Library, 11 North Street, Plymouth, Massachusetts 02360.

The records search required 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> of professional staff time. Accordingly, the cost for the records search is $384.00. The charge for reproducing records not located in the PDR is five cents ($0.05) per page. Accordingly, the cost of reproducing the enclosed 185 pages is $9.25. You will be billed for the total amount, $393.25, by our Division of Accounting.

If you wish an additional search regarding the Maine Yankee plant, please notify me in writing by June 30, 1986.

If a response is not received by that date, the request will be' administrative 1y closed.

Sincerely, gA

/

Donnie H. Grimsley, Director Division of Rules and Records Office of Administration

Enclosures:

As stated h62 3 860623 BURNSTEIe6-se pop

Re: 86-58 Appendix A 1.

8/25/71 Safety Evaluation (of Boston Edison's application for the operating license) by the Division of Reactor Licensing, USAEC, for the Pilgrim Nuclear Power Station, PDR microfiche No. 50-293-54 (130 pages) 2.

11/8/71 Pilgrim Nuclear Power Station Environmental Report Supplement, Operating License Staye, on Radiological Environmental Effects, Boston Edison Co., PDR Microfiche No. 50-293-59 (40 pages) 3.

5/10/72 Final Environmental Statement related to Operation of Pilgrim Nuclear Power, PDR microfiche No. 50-203-70 (186 pages) 4.

6/4/76 Proposed Radiological Effluent Technical Specifications (Be consistent) (RETS) PDR Microfiche No. 50-293-659 (330 pages) 5.

3/31/77 Appendix I Evaluation, PDR Accession No. 770980073 (752 pages) 6.

2/21/79 Proposed, RETS Accession No. 7902260325 (59 pages) 7.

7/2/79 Correction to proposed RETS Accession No. 7907050250 (14 pgs) 4 8.

2/14/80 Staff comments on Proposed RETS, Accession No. 800303051 (132 pages) 9.

6/16/82 Resin on Roof Tops. Accession No. 8206220151 (3 pages)

10. 4/15/83 Proposed RETS. Accession No. 8304200247 (82 pages)
11. 5/9/84 Review of Proposed RETS Accession No. 8406060039 (3 pages)
12. 06/13/84 Updated LER 82-045/3x-1, Reactor Water Conductivity (3 pages) Accession No. 8407020144.

13.

10/31/84 NUREG/CR-2000, Licensee Event Report Compilation for the Month of September, 1984 (106 pages) Accession No.

8411070344

14. 03/31/86

_NUREG/CR-3950 Volume 2, Fuel Performance Annual Report for 1984(114 pages) Accession No. 8604040483

Appendix B 1.

June, 1970 Memo to Peter A. Morris from Milton Shaw; Safety Analysis Reports (3 pages) 2.

04/07/71 Letter to Chairman Glenn T. Seaborg, U.S. A.E.C., from Spencer H. Bush (5 pages) 3.

11/09/71 Letter to Director, NRR, from T.J. Galligan, Jr.; Boston Edison's submission of Amendment No. 31 to License Application dated 6/30/67 (92 pages) 4.

01/22/85 Letter to USAEC from G.D. Boston enclosing Update Report On Licensee Event 75-4 concerning airborne effluents exceeding Tec. Spec limits on Jan. 7-14, 1985 (8 pages) 5.

01/22/75 Letter to M.J. Feldman from Paul R. Nelson concerning violations of tech. spec. radiological release limits (11pages) 6.

01/28/75 Letter to USAEC from G.D. Baston submitting Licensee Events Report 75-5 concerning airborne effluents exceeding Tech.

Spec. limits on Jan. 21-28, 1975 (2 pages) 7.

01/28/75 Letter to M.J. Feldman from J.P. O'Reilly, regarding investigation of gaseous radioactivity releases exceeding tech. spec. limits (1 page) 8.

02/21/75 Letter to M.J. Feldman from Paul R. Nelson concerning violations of tech. spec. radiological release linits (12 pages) 9.

04/02/75 Letter to NRC from M.J. Feldman proposing a revision of Pilgrim tech. specs. for gaseous effluents (7 pages)

10. 05/02/75 Letter to NRC from J.A. Smith, reactions taken to control release of airborne effluents- (2 pages)
11. 05/22/75 Letter to NRC from F. M.'Staszebey concerning proposed revision of Pilgrim tech. specs. for gaseous effluents (7 pages)
12. 05/23/75 Letter to M.J. Feldman from D.L. Ziemann enclosing Amendment 10 to Pilgrim tech. specs. relative to gaseous effluents (13 pages).
13. 6/11/75 Memo to F. Schroeder from D.L. Ziemann relative to need for a cow census in tech. specs. (1 page)
14. 06/25/75 Memo to K. Goller from H.R. Denton providing a model specification relative to cow census (2 pages)
15. 07/30/75 Letter to NRC from J.A. Smith reporting total Iodine-131 release in excess of tech specs during second quarter of 1985 (1 page) 16.

10/28/75 Letter to NRC from J.A. Smith reporting total Iodine-131 release in excess of tech specs during second quarter of 1985 (1 page) 17.

11/04/77 Memo to D. Ziemann from J.T. Collins; DSE Evaluation of Pilgrim Nuclear Power Station, Unit No. 2, with respect to Appendix I to 10 CFR Part 50 (25 pages)

18. 07/08/82 Memo to H.R. Denton from R.K. Mattson; Generic Implications of the Release of Spent Demineralizer Resins from Pilgrim, Unit No.1. (6 pages) j
19. 02/01/85 Letter to D.B. Vassalo from W.D. Harrington,

Subject:

Proposed Technical Specification Change Tables 3.1.1 and 3.2.A (10 pages)

20. 03/13/85 Memo to G.G. Lainas from W.V. Johnston; Safety Evaluation for Technical Specification Change to Facilitate Hydrogen Addition - Pilgrim NPS (TAC #56820) (5 pages) l
21. Undated Paper on Meteorology, Pilgrim Nuclear Power Station (29 pages)
22. Undated Safety Group Report on Environmental Aspects of the Pilgrim Station, Boston Edison, Docket No. 50-293 (3 pages)
23. Undated Paper, " Pilgrim Station Primary Coolant Recirculation System Chemical Decontamination" (17 pages)
24. Undated Note in Amendment 10 file entitled " Pilgrim Unit 1 Iodine Vent Release" (1 page) 3--#

---9 m-,

Appendix C F01A-86-58 F0IA REQUEST NUMBER 86-58 Date Originator Recipient Description 1.

5/31/72 USAEC Boston Edison Acknowledgment of Receipt Company of 5/2/72 Letter (copy attached)(2 pages) 2.

10/17/72 EPA USAEC Response to Pilgrim Envi-ronmental Impact Statement (2 pgs) 3.

11/2/72 Boston Edison USAEC Letter

Subject:

Inoper-Company ability of Air Sampling System (Panel C-19)

(1 page) 4.

1/13/75 USAEC File Action Control Form -

Reports of Occurrences with Copy of Occurrence 75-4 attached (3 pages) 5.

1/14/75 USAEC USAEC Memo

Subject:

Predicted High Stack Release Rates at Pilgrim (1 page)

?

6.

1/22/75 NRC NRC Memo

Subject:

Effluent Release Analysis -

Pilgrim I with Enclosure, Memo dated 1/13/75 (copy attached)

(4 pages) 7.

1/28/75 NRC Boston Edison Letter of Understanding Company based on a 1/28/75 Phone Conversation (1 page) 8.

3/3/75 NRC See Distribution Summary of Meeting held List on 1/30/7S to Discuss Accident Doses to Control Room Personnel and Offsite Doses due to Leakage of i

Post-Loca Recirculation Sump Water from Compo-nents outside of Containment (Document is in the PDR/LPDR)

(5 ages) i

2 1

i Date Originator Recipient Description 9.

4/11/75 NRC NRC Airborne Effluents -

Pilgrim (2 pages) 10.

4/18/75 NRC NRC Airborne Effluents -

Pilgrim 1 (3 pages) 11.

5/7/75 NRC File Action Control - Reports of Occurrences with copy of Information Report attached (3 pages) 12.

5/30/75 NRC NRC Memo

Subject:

Iodine and.

Particulate Releases -

Pilgrim 1 (5 pages) 13.

6/5/75 NRC File Action Control Form -

Reports of Occurrences with copy of Occurrence 75-14 attached 14.

7/25/75 NRC NRC Memo:

Effect of Fuel Problems on an Operating BWR with Enclosure - Memo dated 7/23/75 (copy attached) (4 pages) 15.

8/15/79 NRC Summit Proposed Letter (AITS University H07001953)(2 pages) 16.

11/28/79 NRC NRC Memo: Man-Rem Exposures at Pilgrim Nuclear Power Station (PNPS) (1 page) 17.

4/2/80 -

NRC File 1/18/81 Action Control Forms -

Reports of Nonroutine Events for Pilgrim (8 pages) 18.

1/19/81 NRC NRC Draft Preliminary Notifi-cation of Event or Unusual Occurrence - Pilgrim (1 page) i 4

,y.-

3 Date Originator Recipient Description

{

19.

1/19/81 NRC See Distribution PNO-I-81-08 (2pages)

List 20.

1/23/81 Boston Edison Boston Edison Office Memo - Resin Spill Company Company of 1/17/81 (15 pages) 21.

2/2/81 NRC NRC Memo:

Request for Special Inspection at Pilgrim Unit I with attached Insp.

Notes for 81-04 (8 pages) 22.

2/10/81 NRC NRC IAL 81-09 (pages 2) 23.

12/30/81 Boston Edison Boston Edison ALARA Evaluation Fo'm Company t

Company (4 pages) r 24.

2/3/82 NRC NRC Daily Report (1 page) 25.

2/12/82 NRC File Memo: Cleanup of Spent Resin in Pilgrim SBGTs Plenum and Attached Notes (8 pages) 26.

3/2/82 Boston Edison Boston Edison Office Memo - Bead Resin Company Company in Standby Gas Treatment System (5 pages) 27.

6/11/82 NRC S

Distribution PNO-I-82-42 (3 pages) 28.

6/14/82 NRC S e Distribution PNO-I-82-42A (Update)

(2 pages) 29.

6/82 NRC Resin Problem Notes (11 pages) 30.

6/13/82 Boston Edison NRC Committment Notes Company (2 pages) 31.

6/16/82 NRC Boston Edison CAL 82-19 (2pages)

Company 32.

7/15/82 Boston Edison NRC Company Response to CAL 82-19 (9 pages) 33.

Undated NRC Pilgrim Station Site Plan (Annotated) (1 page)

4 Date Originator Recipient Description 34.

5/10/85 Bechtel/ Boston Calculation Sheet with Edison Company several Memos and Reports Attached (7 pages) 35.

5/6/86 -

Boston Edison Analysis Sheets (Annotated)(46 pgs) 7/9/85 Company 36.

Undated Boston Edison Air Samples (6 pages)

Company 37.

1982 Boston Edison Surveys in SGTS (8pages)

Company 1/26-1/29/82 for 82-42 38.

Undated NRC Pilgrim Sanitary Sewage System Survey (2pages) e J

WILLIAMS, JACKSON & SPERO ATTORNEYS AT LAW 10 STANIMRD STREET BOSTON, MASSACHUSETT3 02:14 A PROFESSIONAL CORPORATION of COUNSEL DAVID C. W1UJAMS uNDA M.JoRGENSoN DONALD H. JACKSON.JR.

PHIUP L. COHEN STANLEY J. SPERo DANIEL BURNSTEIN GARY H. PE1T.RSEN RICHARD E. WARING TEIIPHONE:

JANET L. M aloof (617) 742 5100 January 22, 1986 Director Ehtr_UOM OF Irgow e -

Office of Administration ACT RE^'* m Freedom of Information Act US Nuclear Regulatory Commission F o r A - ? 1. - E P Washington ~D.C. 20555 Re: FOIA Request

Dear Sir / Madam:

I request under the Freedom of Information Act the following documents:

I.

With reference to Pilgrim Nuclear Power Station (PNPS) 1.

Any studies correspondence, reports or any other documents relating to the reported problems involving GE Fuel (which leaked and had cracked fuel cladding) 1972 - present.

2.

Any accounts, studies, correspondence, reports, data, or other documents relevant to inadequate monitoring of liquid and airborne discharges,1972 - present.

3.

Any accounts, studies, compilations, data or other documents relevant to meterological information on a) inversion frequence and persistence, b) fumigation frequency and persistence, c) air quality and particulate readings 4.

Any accounts, studies, data, correspondence, or other documents relating to the existence of unmonitored gaseous release paths, for the period 1969 - present.

5.

Information relevant to modification of plant systems with the intent of reducing radioactive discharges, and to alternation of the plant's Technical Specifications governing radioactive discharges, for the periods 1970 to present.

6.

Accounts, studies and data relevant to release to environment of radioactive demineralizer resins from 1970 - present.

II.

With respect to Main Yankee at Wiscasset Maine, the same data as in 1-6 paragraphs above.

~

1pP-

a J

Director January 22, 1986 Page 2 i

I am willing to pay the cost of the copying of said documents. Please contact me at (617) 431-7815 to review the cost and extent of the documents jyou locate before copying them.

- Please contact me if you have any questions.

I Very truly yours, b

i Daniel Burnstein DB/lla i

l i

j A

u l

i 4

e 1

e l

l

,.. _.... _. -., _. ~....

_... _., _ _ _.. _..... _.. - - -