Text
.
...v
,. -...., -,....... ~. -.
U s. NUCLEAR PCGULAToRY CoMMISSloN
%ns.Aautu u sea +
w
{
*g
.t sto.,$t,,,e j,
RESPONSE TO FREEDOM OF l'
l 4 ''
'~"
N INFORMATION ACT (FOIA) REQUEST gp 7198a
..e..
o t t - t i....._._
It0vt5fta George E. Johnson..Esauire 8;0 m PART 1.-RECORDS RELE ASED OR NOT LOCAft015ee checaea conesi No agency records owbiect to the 'sowest have been located No addntsmal agency escords avbvect to Ibe roovest have been located Agency records ett1ect to the 'sovest that e<e coet#ed e Appendia _
are elseed, awedaNe fo# public ansoecten end copying e the NRC Pw.c Docw ent Room.
cr X
1717 H Street. N W. Wu% eg*on. DC Agency records subs ct to the roovest that see dentded e Appe*.d O*
s<e being mee awedetdo foe pe c escection and copyeg e the NRC PwtAc Docwwt e
y Rcom,1717 H Steoet. N W. Weenegton. DC. e a fodder wrw me F0sa numte* and roovester naw The nonpropretary versen of N peooosahel that vow ag' sed to accept e a to'eohore con =e'sation wth a memter of my sts e no* beng made avetetre foe putAc rececten and coveg at the NRC Put*c Dccwmeat RoeSt. 17.7 H Street. N W. Washegion, DC. n a foaoes wre+< ee Foi A numb.e eN,eoveste, necre snew. etem.- on he.,% m., obwe uc w.nd r. cxyg f, coe,eg r. cord. cued e me NRC Put*c oocw~ni Rm iri7 H st,-i. N W. w..h.ngton. oC l
Agency,=o.e. we,ui io re..i... emc. d An..oc c.
<%,g. ee cc.
e me neas e ov.ded ro t.rwi e c<edsen. note n e. com-u.u-a Rao,ds.wb,uno n.
t %,e t ee,vem to.nor., e oe..i.geec,4.i ee,ese. rd deuonooe.e to,%
e in.
- NRCs,- -. io ree.o. t ne to ~, uoon. b eg u.e on.ece.n.ite, cred PART 11 A-INFCRM ATiON WITHHf LD FROM PUBLIC OISCLOSURE Ce<tae adormaton e N esowested reco ss e te.cg w.t%he oore s. C. ed D u,.
.e conene a re ox,,-ts d hom putac deciowe purwrt to the FOA eiewtees deurced a sas for the reaeors suted in Part it. e,c.
a
..*.Ch omfy DF1 d W 'uC*d e to ag *'Whe6d 4'8 to rg Noe 0v444b64 for DWeC etoEten Pd N9yq in the NRC P tec Document Room.1717 H Si<eet. N W. Wash.ngton. DC. e a to6cc whoe< the f otA a mber ed rooveste <ume j
w C_
- Copies of Appendix G Records are also being placed at the Local Public Document Room maintained in the ilymouth Public Library,11 florth Street, Plymouth, tiA.
- The Office of Enforcement has locsted 15 enforcement related records which were originated by Region 1.
Af ter consultation and review by Region I of these records, it is uncertain as to whether they fall within the scope of your request.
Based on this uncertainty, please notify Nina Toms as to whether or not you are interested in having these records ioentified to you in a later response.
The records consist of predecisional proposed enforcement actions, draft inspection reports and notices of violations.
If you do not notify Ms. foms eithin 20 days of the date of,this response, we will assume that you have no further interest in these 16 records.
8810130399 000907 PDR i OI A JOHNSONG8-190 PDR S@s t t p.at c t,a v3c mall a ag cc, nog TV__
W '
1 'W i m C s c R *.9 464 z
e._...
........ ~........,
Re:
FOI A-99 u.8 APPEN01X F
RECORDS MAINTAINED AMONG POR FILES NUMBER DATE DESCRIPTION 1.
04/12/86 W..arrington, BEco T. Murley, R-! Confinnation of Actions 2
to be Taken with Regard to the Pilgrim Plan Events Which Occurred on 04/12/86 (Accession #8604210211) 2.
04/24/86 All Power Reactor NRC 1mplementation of Fire 56 licensees and Protection Requirerents Applicants for (GL 86-10) w/ Enclosures Reactor Licenses (Accession #8604290180) 3.
06/13/86 J. DelMedico T. Rehm History of Regulatory 11 Performance at Pilgrim Nuclear Power Station w/ Enclosure (Accession #8606250187) 4 06/24/86 Chen, Palladino E. Markey Re: July 16, 1986 hearing 3
a t which Comission's tiistimony is requested concerning management problems at a number of ccanercial nuclear facilities (Accession f8607220362) 5.
08/27/86 J. Lydon T. Murley Confinnatory Action Letter 4
86-10 (Accession f8609030066) 6.
09/17/86 J. Strosnider J. Lydon NRC Confirmatory Action 8
letter #86-10 (Acc. fS711030457) 7.
12/19/86 W. Golden J. Taylor Response to 07/15/86 Petition 2 (Accession #8612310095) 8.
01/01/87 Code of Federal Regulations 3
(1/1/87 Edition) 651.21 9.
01/15/87 J. Lydon R. Auluck Mark 1 Containment Drynell 26 Vacuum Breakers (TAC 57164) w/ Enclosures (Accession #8701290*/0)
.... ~...................... -. ~.........
.s,
....,eo........
.....m.,.~.
i Re:
F01A c.9-M9 APPENDIX e
RECORDS MAINTAINED #10NG POR files NUM8ER DATE DESCRIPTION 10.
02/20/87 W. Golden T. Murley Re: Intention to meet with 3
Hon. Golden approx. May of '87 at the earliest (Accession #87121i:0190) 11.
03/17/87 T. Norton T. Murley Transmital of 03/09/87 9
Testimony before Joint Comittee w/ Enclosure (Accession #8703230301) 12.
06/24/87 T. Murley R. Boulay Response to Concerns 2
Re:
Plume Exposure (Accession #8707010247) 13.
07/08/87 S. Varga R. Bird Information Regarding 103 Pilgrim Station Safety Enhancement Program w/ Enclosures (Accession #8707200428) 14 07/13/87 F. Congel R. Krim Finding on Pilgrim Nuclear 1
Power Station (Accession #8707170212) 15.
07/21/87 C. Oneil/
T. Murley Response tc 06/12/87 letter 37 M. Dinan to Dekakis Re:
Emergency Planning for Pilgrim Plant (Accession #8707250225)
(Note:
2 pages of rnemo attached - balance of 35 pages is enclosure.)
)
16.
07/28/87 Preliminary Notification 1
1 PN0-1-87-68 Contamination of Contract Worker at Pilgrim Plant (Accession #8708030182) 17.
07/30/87 Preliminary Notification 2
PNO-I-87-69 (subject: ditto)
(Accession #8708040293) 18, 8/10/87 NRC. Document R. Bird 10CFR50 Appendix R 25 Control t'erk Exemption Requests w/t.ttach ents
( c:essier n!'05.rC373)
. ~......--
- - " * * ~ ~ ' ~ ~ ~ ~ ' ~ ' ' " " ' ' ' ~ "
Re:
FOI A-68-198 APPEN0lX e
RECORDS MAINTAINED AMONG POR FILE _S.
S NUMBER DATE DESCRIPTION 19.
08/11/87 File R. Wessman Meeting Minutes-Meeting 22 Between Boston Edison Company and NRC on August 4, 1987 w/ Enclosures (Accession f8708130222) 20.
08/21/87 R. Bird S. Yarga Initial Assessment of 17 Pilgrim Safety Enhancement Program w/ Enclosure (Accession #8708270038)
- 21. 09/04/87 NRC-Document R. Bird FEMA Report on Offsite 2
Control Desk Emergency Planning for Pilgrim Nuclear Power Station (Accession #8709110368) 22.
09/08/87 T. Murley, R. Wessman Daily Highlight-Meeting 20*
ot al.
Notice forthcoming Meeting With BWR Owners' Group w/ Agenda /Vu-graph attachments (Accession #8709110039*)
- 0ocument attached has charts that are not in POR and are to be released.
23.
09/17/87 NRC-Document R. Bird BECo Action Plan and 30 Control Oesk Schedule for Providing Assistance in Addressing FEMA !ssues w/ Enclosure (Accessionf8709210525) 24.
09/18/87 Chra. Zech G. E. Studds Response to two specific 3
actions w/ regard to modification of Pilgrim Plant by Boston Edison Co.
(Accession #8712080025) 25.
09/30/87 P. Pierce-T. Murley Response to Questions Re:
14 Bjorklund Environmental Inipact Statement for Meltdown of Large Reactors w/ Enclosure (Accession #3710080207)
.o
.c
... v.
...o...
Re:
FO!A-Fr.
APPENDIX F
RECORDS MAINTAINED AMONG POR FILES NUMBER DATE DESCRIPTION 1
26, 10/01/87 R. Bellamy P. Agnes Memo Re:
Shelter Survey 4
w/ Enclosure (Accession #8710130347) t 27, 10/08/87 R. Bird W. Kane Letter Re:
Overtime 2
(Accession #8711020442) i 28, 10/09/87 C. Barry L. Zech Response to 08/18/87 3
letter re: pre-restart conditions a a request for public hearing on issues before restart (Accession #870230006XA) 29.
10/13/87 L. Zech Jr.
N. Johnson Citizens Comittee's 8
meeting of 9/20/87 w/U.S. Rep. Studds regarding Pilgrim I w/following enclosure of the same date (See #30 below.)
(Accession f8710270325) 30, 10/13/87 R. Bellany N. Johnson The Citizens Comittee on Nuclear Matters in their collection of information turned up a letter which needs some clarification 31.
10/13/87 R. Bellamy N. Johnson Re: Citizens Comittee's 2
awareness of BEco Letter 87-97 dated June 4,1987 (Accession #8710270316) 32.
10/16/87 Preliminary Notification 1
PNO-I-07-95 Pilgrim 10 CFR 2.206 Petition (Accession #8710210131) 33.
10/21/87 R. Bellamy R. Bellamy R. Bird Re: transmittal letter 35 BECo f87-97 as being a case for concern to some members of the town of Duxbury's Erergency Response Plan Co*nittee a/ Attack ent as noted telen.
- :cessi:n *??.'C E l.:2) fu rest nee,331
.~r-t-
---5----
Re:
FOI A-r-v.n.
APPENDIX F
RECORDS MAINTAINEO AMONG PDR FILES NUMBER DATE DESCRIPTION i
34.
06/04/B7 R. Bellamy R. Bird BECo Ltr. 87-97 w/ Attachments 35.
10/26/87 R. Boulay R. Varley Boston Edison's coment in 17 response to concerns re 8/87 i
S&W "Study to Identify Potential Shelters in the EPZ Coastal Region of the Pilgrim Nuclear Power Station." w/ Enclosure (Accession #8711020083) 36.
11/13/87 R. Birj R. Wessman NUREG-0737 Item E.C.6 4
Verifying Correct Performance of Operting Activities (TAC No. 47313) w/ Enclosure (Accession #8711170212) 37.
11/20/87 NRC-Document R. Bird BEco Ltr.87-185 transnitting 283 Control Desk Additional Information Regarding dilgrim Station Safety Enhancement Program (SEP) Operator-Oriented Improvements w/ Enclosure (Accescion #8712010073) 38.
12/16/87 Federal Register, Pages 47806/47807 52FR47806 published 12/16/87, 2
Vo. 52, No. 241 39.
02/05/88 NRC Infortnation Notice 7
No. 88-04:
Inadequate Qualification and Documentation of Fire Barrier Penetration Seals w/ Attachments (Accession #8802020228) 40.
02/19/88 NRC-Document R. Bird BEco Ltr.88-024 2
Control Desk GL 88 02:
Integra ted Safety Assessment Program
!!-Survey Response (Accession #8802290044) 41.
03/24/88 R. Bird D. Mcdonald NRC Region Inspection 4
Report 87-39; Resolution of item A Page 4 Pilgrim Nuclear Power Station w/ Enclosure
( *c essier e250.W.:03)
s.
Re:
FOI A-88-19B APPENDlX e
RECORDS MAINTAINED AMONG POR FILES NUMBER DATE DESCRIPTION 42.
03/29/88 Hon. Kennedy Chmn. Zech, Jr.
Re:
Process for Restart of 3
Pilgrim Plant w/ Enclosure (Accession #B804050343)
Note: This is attached to incoming ltr to L. Zech lee #43 below.)
43.
02/17/88 L. Zech, Jr.
Sen. E. Kennedy Incoming to above response 4
w/ Enclosure (Accession #8804050365) i i
1 I
l
...-.......... ~.........
- - -. '. ~ - -
' ' - - - ' - - * ' ~ " ' ' ' -
Re:
F01 Ad '9A APPEN011 c
RECORDS MAINTAINEO IN THE POR UNDER THE ABOVE REQUEST NUMBER NUM8ER DATE DESCRIPTION 1
1.
7/24/86 J. Lydon J. Zwolinski Enviromental Assessment and 9
Finding of No Significant Impact-Schedular Exemption From 10CFR 50.48 (TAC 61913) 2.
7/29/87 V. Nerses R. Wessman Forthcoming Meeting 28 with Boston Edison Company (BEco)
Pilgram Nuclear Power Station 3.
9/16/87 R. Bird V. Nerses Environmental Assessment 5
1
& Finding of No Significant Impact-Appendix R Exemptions (Tac 53416) 4 9/24/87 R. Bird R. Wessman Safety Issue Management 18 System (SIMS) Reconciliation 5.
3/24/88 R. Bird O. Mcdonald Installation of Integral 4
Conduit Smoke Seals at Appendix Barriers (TAC f67523) Pilgrim Nuclear Power Station w/ Enclosure i
6.
Undated Internal notes -
4 Martin, Don White...
7.
Undated Infonnation sheet -
1 Pilgrim Nuclear Power Station Safety Evaluation Report, Fire Protection Program, Control Room Upgrade - Carpet 8.
Undated Internal notes -
1 2/9 Joe Nicholson at Pilgrim....
9, Undated Internal notes -
1 TAC 62793 Dick, This it cre....
---.-..-------------e
....e..
.m.
Re: F0!A-83.108
)
APDENDIX G i
RECOPOS "Al?!TAlilED 1l1 THE DDR UtIDER THE AB0VE REQUEST flu'!BEP.
- 10. Undated Internal notes -
2 12/17 Meeting to Keyes 275' iculd change to 150'...
- 11. Undated Interial notes -
1 Drywr11
- 12. Undated Internal notes -
1 To deal with GE MARK I Issue:
- 13. Undated 5/21 - Mag Vaillancourt 1
Channel 2....
- a. Undated Meeting - Discussion Issues 2
- 15. Undated Draft of Safety Evaluation 11 Report
- 16. Undated Printout - Chronological 11 Listing of Reports 17.
Undated Vu-graph -
1 Boston Edison Co.
Potential Degradation of Containment Spray System 18.
Undated Table 3.11-1 plus charts 5
19.
Undated Plant Familiarization Handout 14 20.
Undated Yu-graphs of BEco for 20 Comission Briefing -
Agenda
- Problems-l Solu tions-Comitment...
{
l 21.
Undated BECo Report -
72 Pilgrim-Specific Technical Guidelines for Errergency Operation Procedures
Re: F01A-83-108 APPENDIX q RECOPDS "AlitTAINED IN THE-PDR UNCER THE AB0VE RE0l'EST flu"BER BEco infomation Report 125
- 22. Undated Pilgrim Nuclear Power Station Collection of Plant Operating Procedures Utilized to Develop, Process and Issue the Plant-Specific Emergency Operating Procedures i
23.
10/29/d2 SECY-32-444, "dRC Brief in Bellotti v. NRC, DC Cir.
(60 pages) 1 4
I 4
.- r
,.-,-..---,-----p-
-,.,,----,-wn,m-r a----
,,,,,-----,,,,-,-,w,--------
_ ~-,.-
+_.
..... v s ~ a. n. 2... a.. s. o. m... ~... w..e. o..., a w
SWlDLER & BERLIN womw MUo K STRIE7. P T sun m r ash! scion. o c romNon
[
nosi +44 4 m L
IDIX Mll)I ftJcorisa i102)944 47%
March 25, 1988 pRr[D0s,' ? tNFORMAT105 Director C 'DUI Office of Administration bO74 4f=/Y[
U.S. Nuclear Regulatory M mission M
Washington, D.C.
20555 M N d-d/~[k i
In re Freedcm of Information Act Request No. is _, Concerning Pilgrim Nuclear Power Stat.cn i
Dear Sir:
In accordance with the provisions of the Freedom of Information Act, 5 U.S.C. 5552 and Part 9, Subpart A of 10 C.F.R., it is requested -hat the records identified belev be made available for inspection and copyings 1.
Records of any votes taken by the Commission, and records or transcripts of Commission meetings, with respect to the l
shutdown of the Pilgrim Nuclear Power Station, or the restart thereof, on or after April 12, 1986.
2.
All SECY papers, c*tachments thereto, records and other materials supporting or forming the basis for positions taken therein on the subject of the Pilgrim Nuclear Power Station, prepared on or af ter January 1, 1980.
3.
All records prepared or dated on or af ter January 1,1980
)
(but excluding docu ints included on Docket No. 50-293 accession listings available f rom the Public Document Room) of NRC Region I, the Office of the Executive Director for Operations, the Of fice of Inspection and Enforcemen, the Office of Investigations, the Office of Nuclear Reactor Regulation, the Of fice of Nuclear Materials Safety and Safeguards, the Advisory Committee for Reactor Safeguards, the Office for Evaluation of Operational Data, and the NRC Emergency Operations Center which discuss, refer te, take positions on, or fer. the basis for decisions concerning, the performance of -he Pilgrim Nuclear Power Static.. in the 1
following areas:
- U CrH.-3-O,iQ %
.,e,,
~;.m.,
...... y..
...,,a_...
e A.
Management B.
Staffing C.
Organization and Organization Structure D.
Radiation Protection E.
Quality Assurance F.
Surveillance G.
Maintenance i
H.
Offsite Emergency Planning I.
Fire Protection J.
Security K.
Management Response to SRC Regulatory Activities 4.
All records of Region I, the Office of Nuclear Rea or Regulatio., the Commission, the Cf fice of Inspection and l
Enf orcemer.:, or other Staf f or Cc rission of fices relating to, discussing or forming the basis or support for, the Director's Decision (DD-87-14) dated August 21, 1987.
l 5.
All records (other than those categories of documents excluded from Item 3) of any office referred to in Item 4, above, discussing, describing, assessing, evaluating, or c:herwise relating to actions by the NRC staf f, FEMA, the ACRS, or other NRC or Commission of fices, to follow-up or t
n.onitor actions by Boston Edison Company, the Commonwealth l
4 of Massachusetts, other jurisdictions with.n the 10-mile erergency planning zone for Pilgri.T Nuclear Power Station, to address issues raised in the Director's Decision (DD '
- 14) dated August 21, 1987.
l 6.
All records of the NRC of fices referred to in Item 4
)
discussing, describing, assessing or evaluating, or c herwise relating to actions of the NRC staf f to evaluate the July 1987 Restart Plan, and other actions by Boston Edison Company, its agents or cor. tractors, relating to the i
restart of the Pilgrim Nuclear Pcwer Station.
j 7.
All records of communications (whether written or oral and l
occurring f rom April 12, 1986 to the present) between any of fice of the NRC Staf f, or of the Commission or of fices reporting directly to it, and Boston Edison Company, 1
concerning the status or startup of the Pilgrim Nuclear l
l Power Station.
8.
All records of communications (whether written or oral, and i
occurring f rom April 12, 1986 to the present) between any of fice of the NRC Staf f or of the Commission or of fices
{
reporting directly to it, and FEHA, other Federal or State agencies or governmental entities, or persons concerning the status, startup, or issues relating to startup, of the l
Filgrim Nuclear Power Station.
i I
(
l
)
l i
4 I
..-. 0.. o...
-..o.
o.
.a.os
..... e.- o.. e. s.,.
s
- 3 9.
All records in tne possession of any NRC Staf f or Commission office pertaining to (a) the evaluation by FEMA, NRC, or any other entity or agency, of the adequac/ of offs;te emergency plans for :ne Pilgrim Nuclear Power Station, and (b) the conduct and/or e'ealustion of drills, full scale' full participat en or partial scale / partial participation axercises conducted or planned for the Pilgrim !;; clear Power Station.
For purposes of this request, "record" or "docu.ent" is defined to incl.de, b; not be limited to, notes, me :randa, reports, meeting minates, logs, transcripts, letters, position or policy papers, interpretations of requirements, and guidance documents, and refers to drafts as well as any final.ersion of
.iny record or document requested.
Sine t ly, j
(
f
/L Q
- pdo eE Jo son, Esq.
(202)944-438 GEJ/veg 1
1 l
I l