Partial Response to FOIA Request for Documents.Forwards App T & Partially Deleted App U Documents (Ref FOIA Exemption 5).App & T Also Available in Pdr.App V Documents Totally Withheld (Ref FOIA Exemption 5)
ML20196F053
Person / Time
Site: Pilgrim
Issue date: 12/08/1988
From: Grimsley D
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To: Johnson G
SWIDLER & BERLIN
Shared Package
ML20150E198 List:
References
FOIA-88-198 NUDOCS 8812120189
Download: ML20196F053 (14)


Text

,-

[ ,. .

U.S. NUCLEAR REGULATORY COMMISSION Tac #Ot acoust Nvvetasisi FOIA 198

, e,'*g Ris oNsnyn i r RESPONSE TO FREEDOM OF l'aat IXbam

^"

/ INFORMATION ACT (FOIA) REQUEST g g e..e. DQcKtY NvMBERrst ref apphcatWer RE QtJE 3 T OR 50-293 Ggor.ge E. Johnson, Es_quife PART 1.- AGENCY RECORDS RELE ASED OH NOT LOCATED ISee checked bones)

No agency records subtect to the request have been located.

No add <tional agency records subget to the request have been located.

Requested records are avadable through anotker pu%c d stnbuton program See Comments Secte.

A GenCy feCords subrect to the request that are tdentif.ed on Arrend.nfeel_ b are already avad4Fe for pu%c er spect*on and cocyer'g e the NRC Publ.c Do. meat Room. 2021 L Street. N W-. Washengton. DC 20%5 Agency records sub,ect to the request that see ident. bed c9 AP M tutest T* are borne made ava labie for pubsc espectea and conveg e i o X NRC Pu%c Docume,1 Room, 2021 L Street. N W-, Washegton, DC. e a folder under tNs FotA number anj requester name.

The nonproprwtary version of the proposallsi that you agreed to acept m a telephone conversation *sth a member of my staff is now beeg made avalsble for pupc especton and copyeg at the NRC PwSC Document Room 2021 L Street. N W., Washegion. DC. m a folder under tNs FOtA number and requester name Agency records subs e ct to the request that are edentef.ed on Appendetest_ may be mspected and (c.rwed at the NRC Local Pupe Document Room de.'tified in the Comments Secton.

Inclosed is eformaton on how you may obts n access to and the charges to copyeg records placed m the NRC Pu%e Docurnent Room. 2021 L Street. N w .

Washegion. DC Agency records subiect to the request are enclosed Records subi ect to the reqwest have been referred to another Federal agencybesi for rev en and d. rect response to vou.

You edl be bened by the NRC for fees totateg s in www of NRC's response to tNs request. no further acton is teeg taken on appesi letter dated No PART 11. A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE r

Certa.n eformaton a the requested records -s be ng

  • thheu from pope d'sclosure pu suant to the enempticas descr bed in and for the <easons stated e Part u sectons 8, C. and O. Any re: eased portor's of the documents for *Ncm oMy part of the record is be ng a'thheld a'e te.ng made ava.labfe for pv%c especten sN cop,cg m the NRC 9.%c Document Room. 2021 L Street. N W . Washegton. OC e a fo6 der under tm.s FOIA number and reavester arne COMMENTS
  • Copies of Appendix T records are also being placed at the Local Public Document Room maintained in the Plymouth Public Library, 11 florth Street, Plymouths l% .

SIG A 1. DiRECTO . DIYlSi OF f HitDOM OF INFORYATION AND NBUCAtlONS SERvlCES

% ,J w id 8812120109 881200 PDR FOIA JOHNSONGG-190 PDR .

.,ee...a.. e..

e

  • FREEDOM OF INFORMATION ACT RESPONSE FOIA NUMBERSISI: FOlA 88-198 oATw n man PART N B- APPUCABLE EXEMPTl;NS ' ' " ' ' ' ' '

Records subsect to the request that are described on the enclosed Appendia(es) U & V a,e de,ng o,inneid m ine,, ent,,ei, o, in pa,i unde, ine Essrnptions and for the fessons set forts below pursuant to 5 U S.C. 552(b) and 10 CFR 9.17tal of NRC Regulations.

1. The withheld eformation is property class f.ed pursuant to Eiecutsve Order (EXEMPTION 11
2. The withheld mformaten relates solefy to the eternal personnet rules and procedures of NRC. (EXEMPTION 21
3. The wrthheld eformation es spec.f.cally esempted from publ.c d selosure by statute anecated (EXEMPTION 3)

$ectaons 141 145 of the Atom < Energy Act which p'oh't>to the esclosure of Restricted Data o# Formerty Restncred Data 142 U S C 21612165L Section 147 of the Atom.c Energy Act wh.ch peoNbets the disclosure of Unclass f.ed Safeguards informaton 142 U S C. 2167)

4. The withbeid eformaten is a trade secret or comrnercial or fmancial mformation that es bemg withheid for the reasonest md cated (EXEMPTION di The information es cons.dered to be conf 4ential buseess (proprieta yt eforrnat.on The eformation es considered to be proprietary informat.on pursuant to 10 CFR 2.790idH1)

The mformation was submitted and received m confidence pursuant to 10 CFR 2 790 toll 2L X 5. The withheld mformat.on cons.sts of eteragency or etraagency records that are not aveaabie through escover, dunne ht.gaten iE AEVPTION Si 4ppi.catde Pnvilege.

Del <berative Process: Disciosure of predec.s.onal eformation would tend to chrbit the open and track enchange of ideas essental to the deMative process.

Where records are nothheld m the.e entirety, the f acts are eneatncably eter1*med with the predecisionali nformaton There aiso are no reasonst/y segregable f actual X port ons because the reiease af the f acts

  • ovid pe a t aa ed reci inau ry into the predec.s.onai orocess of t e agencv-Attomey norit product pnydege IOocuanents preparv
  • by an attoene, m conterrolaton of I tigation 6 Attorney - cl.eet privilege #Ccchdeetial commun c at ons betw een en attorney ar4 h.s hee chent i
6. The withteld eformat.on is esempted from psbl< d sciosu er because its esciosure would resu't e a ciearty wena"anted evasen of personal Otwacy ftXEMPTION 6)
7. The wethheld eformation consists of records compded for law enforcement purposes and is being withheld for the reason (si ed.cated IE xEMPTiON 71 0.sclosure could reasonably be espected to eterfe<e w.tw an enforcement proceedeg because it could revea tre scope. d<ect.on and focus of en forcement offorts. and thus cove d poss@y an ow them to tas e action to sh.e4 potential n'ongocq or a v.cdalen of NRC requoements l'om insest.gators E XE MPTION 7 i Ai Disciosur e nostd constitute an unwarranted evas.on of personal privacy iEXE'uPTION 7icli The aformaton cons sts of names of comdua's and other en'ormat,on the d,scksur e of nNch could teasonabfv de enoected to reveal 4entites of conf 4ent st sources IE M EVPfiON 7 80 i Othe' PART 11. C-DENYING OFFICIALS Pursvaat to 10 CFR 9 25 to and or 9 25 sc) of the U S Nocest Regulatori Comm ssion regulat.ons ,t t.as been oete'm.ned tn ta t~e .nformation a<thbeid es e sempt from Deoduct.on of d sclosurt and that its production or desc'osuf e is Cont'ary to the Dubhc seterest The pevsons fesponsbe for the . fen.sf are these of ficials ident Aed teio* se denying of 6c.ais and tke Odector. Div s.on of Freesom of Inf ormar on and Puta c at.ons See. css 0%e of Adme.s!*at.cn and Resou ces r Yamagement. for any derus's that rnav be appered to the E secut ve O*ects for Opeestons <E doi DENYING OFFICIAL, TITLE OFFICE RECORDS DEN ED APPELLATE OFFICIAL

_ M RETARY E D'O John C. Hoyle Ass't Secretary of the V/1 X Commission William T. Russell Regional Administrator REG I s U/1 & V/2 X PART N. D- APPE AL RIGHTS The d.n.a by .uh denyng .fficiand.nnf.d m Pa,o C , sy be .ppe.mo ibe appensie Off.ei.i id.not.ed a that subon Any such appeal must be in enting and must be ,nade w, thin 3o da,e of ,ue.pi of ih.s respons. Appe.is musi be add,essed as appeopnate to ih. E.uuirve 0.rxio, fo, Operanons o,i ihe sur.ta,y of the C-ss.on.

U s Nucie., neguiaiory C-s.on. w ashmgion. OC 2ossS. and shoumiearty siai. on ihe en,eiope and e the ietter ihai , is ac Apreai f,om en in. net FOI A Onis.onJ

'8'c tones se4 epm at U.S. NUCLEAR REGULATORY COMMIS$10N

" FOlA RESPONSE CONTINUATION i

.n _y - - --

APPENDIX S -

RE(ORDS MAINTAINED NiOM PDR FILES

1. 8204090428 3/24/82 George H. Smith, REGION 1, to BECO, transmitting inspection Report 50-293/82-09 (8204090430) 7 pages 2, 8208170140 6/22/82 George H. Smith, Region I, to BECO, William O.

Harrington, Re: Emergency Preparedness Appraisal 50-293/81-15 (8208170141) 89 pages ,

3. 8208300213 8/24/82 to BECO responding to George H. Smith, BECO let'.er Region I,(enclosed-8208300215) dated 7/28/82 concerning Response to Emergency Response Appraisal 63 pages
4. 8301040640 11/1/82 BECO to Robert J. Bores, Region I, Re: Report of Actions Takea Pursuant to Emergency Preparedness ,

Appraisal 50-293/81-15 25 pages ,

5. 8301040630 12/29/82 Thomas T. Martin, Region I, to BECO, Re: Acknew-ledgement of 11/1/82 response from BECO 3 pages
6. 6308120009 7/29/83 Thomas T. Martin, Region I, to BECO transmitting inspection Report 50-293/83-16 8 pages
7. 8311040041 10/18/83 Richard W. Krimm. FEMA, TO Edward L. Jordan, NRC Re: Response to Request for Assistance Concerning Offsite Radiological Emergence Preparedness issues at Pilgrim Nuclear Power Station with 9/30/83 FEMA Region I memo to Dave McLoughlin enclosing FEMA report (8311040047) 15 pages
8. 8311160042 11/2/83 Richard W. Krimm. FEMA, to Edward L. Jordan, NRC l

followup to 10/18/83 memo enclosing 10/4/82 FEMA

' memo transmitting Interim Findings, dated Septem-ber 1982 8311160043) and Exercise Report Septem-ber 1982 8311160046) 81 pages

9. 8410260232 10/1/84 Thomas T. Martin, Region I, to BECO transmitting Inspection Report 50-293/84-20(8410260239 l

10 pages

10. 8510230109 10/18/85 Thomas T. Martin, Region I, to BECO transmitting Inspection Report 50-293/85-19(8510230113)  :

7 pages

11. 8505020179 3/26/85 Thomas T. Martin, Region I, to BECO transmitting Inspection Report 50-293/84-35(8505020187 l

11 pages l

-nnm n .,.:- - - - _ w -

i O

F0IA 88? 98

[APPENDIXS RECOP.DS MAINTAINED AMONG PDR FILES

12. 8604210211 4/12/86 Thomas E. Murley, Region I, to BECO, Re: Cor-firmation of Actions to be Taken with Regard to the Pilgrim Plant Events which Occurred ou April 11-12,1986 2 pages
13. 8606250187 6/18/86 Thomas Rehm, EDO, to Joe DelMedico, CA, Re:

History of Regulatory Performance at Pilgrim Nuclear Power Station 11 pages

14. 8802030125 7/14/86 Ouxbury Council of Parent-Teacher Associations to Chairman, FRC, Re: Workable Evacuation Plan 2 pages
15. 8608200426 8/12/86 James M. Taylor, ole, to William B. Golden, Itass.

State Senate, Re: Response to Petition of 7/15/86 with 8608200t33 attached 5 pages 16, 8609030066 8/27/86 Thomas E. Morley, Region I, to BECO, Re: Confirm-atory Actir.n Letter 86-10 2 pages

17. 8612310095 12/19/86 James M. Taylor, ole, to William B. Golden, Mass.

State Senate, Re: Furthur response to Petition of 7/15/66 with 8702030158 XA attached 3 pages 18, 8712220237 12/22/86 Charles V. Barry, Mass 9acretary of Public Safety, Re: Transmiting copy of report on emergency Pre-paredness at Pilgrim Nuclear Station 226 pages

~

19. 8701070389 12/24/86 Thomas T. Martin, Region 1, to BECO transmitting Inspection Report 50-293/86-39(8701070396) 8 pages
20. 8703100051 3/1/87 BECO to NRC, Re: Response to NRC Letter Concerning Management lieeting 50-293/86-41 3 pages
21. 8706250550 3/6/87 Gerry B. Studds, House of Representatives, to Chair-man Zech, NRC, Re: Complaints of CURE with letter from CURE attached (8810250114A) 4 pages
22. 8703230304 3/9/87 Testimony Before the Massachusetts Special Joint Committee on the Investigation and Study of the Pilgrim Station Nuclear Generating Facility at Plymouth, Thomas E. Hurley, Regional Administrator 8 pages

'23. 8704070304 3/31/87 Richard M. Krimm, FEMA, to Edward L. Jordan, NRC

- D Re: Pilgrim 10 CFR 2.206 Petition'T 1 page s , , . . .w e ,-

4, 'M..

~Mk ,gg N -

1 p ,,

g _w

,1 K r

~ ;; -

l 1

FOIA 88-198 APPETIDIX S l

RECORDS IMINTAINED A'10flG PDR FILES

24. 8706250539 4/1/87 Thomas E. Murley, Region 1 to William B. Golden, House of Representatives, Re: Reply to his letter of 2/25/87 2 pages 25, 8705060351XA 4/7/87 Gerry Studds, House of Representatives, to Lando Zech, NRC, Re: Town of Plymouth Committee on Muc-lear Matters report on Emergency Response at Pil-grim 12 pages 26 8707070625 5/18/87 titchael S. Dukakis, Governor, Mass., to Lando W.

Zech, NRC, Re: Show Cause Fetition of 7/15/87 2 pages

27. 8705290163 5/21/87 Lando W. Zech, NRC, to Gerry E. Studds. House of Representatives, Re: Response to 4/7/87 letter on Pilgrim 2 pages
28. 8706010439 5/22/87 BECO to NRC, Re: Response to s of Licensee Performance (SALP)ystematic Report 7 pages Assessment
29. 8707010257 6/24/87 Robert J. Boulay, Comonwealth of massachusetts, to Dr. Thomas E. Murley, NRC, Re: Expansion of Plume Exposure Emergency Planning Zone 2 pages
30. 8707070618 6/25/87 Lando W. Zech, NRC, to Michael S. Dukakis, Mass.

Governor, Re: Response to 5/18/87 letter on Pil-grim Station 2 pages

31. 8707250225 7/21/87 Thomas E.11urley, NRC, to Carl D. O'Neil, Duxbury Emergency Response Plan Comittee, Ouxbury, Mass.

, Re. Response to 6/12/87 letter to Gov. Dukakis

about Pilgrim Station 2 pages
32. 8710230013XA 8/18/87 Charles V. Barry, Secretary of Public Safety to Lando W. Zech, NRC, Re: FEMA's Self-initiated r

Review and interim Finding report w/ 2 letters l dated 6/16/87 attached 4 pages

33. 8708260194 8/21/87 Thomas E. Murley, NRC, to William B. Golden, Mass.

! State Senate, Re: P.esponse '.o petition of 7/15/86 enclosing Notice of issuance of Interim Director's l 63 pages l Decision i 34, 8709110368 9/4/87 BECO to NRC Re: FEMA Report on Offsite Emergency Planning for Pilgrim Nuclear Power Station 2 pages i

i I

i

+ - -- - - . - _, _ _ _ _ _ _ _ _ -

O FOIA 88-198-APPENDIX S RECORDS MAINTAINED N10NC POR FILES

35. 8811160262 9/4/87 Samuel J. Chilk, NRC, to William B. Golden, Mass.

State Senate, Re: 00-87-14 Director's Decision be-came final on 9/15/87 2 pages

36. 8709210333 9/17/87 8ECO to NRC, Re: Request to grant one-time exemp-tion for requirements of 10 CFR Part 50, Appendix R, Section IV.F 4 pages
37. 8712090154 9/17/87 BECO to NRC Re: Request emergency preparedness exercise be conducted 12/9/87 7 pages
38. 8712240092 9/24/87 Transcript of meeting with BECO, Re: Pilgrim Status and Activities leading to Restart Readt-ness 62 pages
39. 8710270316 10/13/87 Neil M. Johnson, Citizens Comittee on Nuclear Power to Ronald R. Bellamy, Region I, Re: BECO letter dated 6/4/87 2 pages
40. 8710270325 10/13/87 Neil M. Johnson, Citizens Committee on Nuclear Power to Lando WQ. Zech, Jr., NRC, Re: Support for Rep. Gerry Studds, (0-Ma.) 6 pages
41. 8710160234 10/15/87 James M. Shannon, Attorney General, Massachusetts, to NRC Re: Enclosed 10 CFRl2.206 Petition Concern-ing the Pilgrim Nuclear Power Station 94 pages
42. 8710260155 10/20/87 Region I to BECO transmiting Inspection Report 50-293/87-38(8710260159) 11 pages
43. 8711020083 10/26/87 BECO, Robert A. Varley, to Robert J. Boulay, Com-monwealth of Massachusetts, Re: BECO's Comments on Atone & Webster Study 17 pages
44. 8712300018 10/23/87 John Kerry, U. S. Senate, to Lando Zech, NRC Re:

Concern over proposed restart of Pilgrim Station 2 pages

45. 8802240293 10/27/87 Mary A. Dinan to Mr. Belemy, Region I, Re: Beach Shelter Survey Figures 1 page
46. 8711050006 11/2/87 Thomas E. Murley, NRC, to David F. Malaguti, Re:

9/2/87 letter to Chairman Zech recomending that Pilgrim's restart not be allowed until an effec-tive emergency response plan is in place (9/2/87 letterenclosed) .g 4 4 6 pages ry'+* ~

9- '

.. to g i 1 wh,M r$g Q$$th?

iwpp,.%

. y:.fiMA m.tm Wgg. d

.u %te: P@> x .

u- _ _ _ _ - - _ _ _ _ _ .-. _ _ _ .

c ..v FOIA 88-198 APPEl. DIX S

{

RECORDS MAlhTAINED A!10NG PDR FILES

47. 8711090383 11/3/87 Region I to BECO transmiting Inspcetion Report 50-293/87-37 (8711090387) 6 pages
48. 8712010046 11/13/87 Thomas E. Murley, NRC, to James M. Shannon, Attor-of Massachusetts 5 pages
49. 8810250181 11/16/87 David Malaguti to Thomas E. Murley, NRC, Re:

Response to 11/2/87 letter and reiterates position relative to Pilgrim restart 2 pages 50, 8711250012 11/17/87 Region I to BECO transmiting Inspection Report 50-293/87-48 (8711250013) 7 pages

51. 8712020190 11/20/87 Lando W. Zech, NRC, to Gerry E. Studds, House of Representatives, Re: 9/17/87 letter concerning Restart of H lgrim 4 pages
52. 87012080059 11/24/87 Lando W. Zech, NRC, to Gerry F. Studds, House of Representative., Re: Response to 9/18/87 letter requesting two actions from NRC  ? pages
53. 8712300010 12/3/87 Lando W Zech, NRC, to John Kerry, U. S. Senate, Re: Hearing on Pilgrim Restart 2 pages 54 8712210300 12/14/87 Region I to BECO transmiting Inspection Report W 50-293/87-53 (8712210308) 103 pages
55. 8801130408 12/17/87 Michael Dukakis, Gov. MA, to Lando Zech, NRC, Re:

Transmiting "Report on Emergency Preparedness for an Accident at Pilgrim Nuclear Power Station" 80 pages

56. 8801130408XA 12/17/87 Michael Dukakis, Gov. MA, to Lando Zech, NRC, Re:
57. 8801140054 12/30/87 Region I to BECO transmiting inspectin Report 50-293/87-54 (8801140061) 8 pages
58. 8801130394XA 01/06/88 Lando W. Zech,NRC, to Michael S. Dukakis, Gov. MA Re: Response to 12/17/87 letter on status of emer-gency preparedness at Pilgrim 8 piges
59. 8802250084 1/27/88 William F. Kane, Director, Region I, to Plymouth Board of Selectmen, Massachusetts, Re: NRC Public Meetings to Receive Connents on Boston Edison Co.'s Pilgrim Restart Plan 3 pages

. g

?' L nw w . . 4% .

, y c. a Y HY N 19r. .) 40 [ . g, . y-

,,..&_u m ,,..

  • %,f . < . , ,,e t

.w ,

____ _ . . _ _ . F01 A 88-198 APPEilDIX S RECORDS ItAlitTAINED AIOftG PDR FILES

60. 8804050365 2/17/88 Edward M. Kennedy, U. S. Senate, to Lando W. Zech, NRC, Re: Hearing concerning proposed restart of Pilgrim 4 pages
61. 8803140328 3/4/88 Region I to BECO transmiting inspectin Report 50-293/88-05(8803140343 7 pages
62. 8809190160 3/10/88 Robert J. Boulay, Connonwealth of Massachusetts, to Edward A. Thomas, FEMA, transmiting Pilgrim Evacuation Time Estimate & Traffic Management Plan 1 page
63. 8803220112 3/17/88 Frank Congel, NRC, to BECO transmiting Inspection Report 50-293/88-09 (8803220114) 7 pages
64. 8803220404 3/17/88 Thomas E. Murley, NRC, to David L. Quaid, Re:

Response to 1/28/88 expressing concerns about Pilgrim's emergency preparedness plans 3 pages

65. 8803280339 3/21/88 BECO to NRC, Dc: Publication of Emergency Public Information Brochure 3 pages
66. 8804050343 3/29/88 Lando W Zech, NRC, to Edward, Kennedy, U. S.

Senate, Re: response to 2/17/88 letter expressing concern about process used to decide on restart of Pilgrim and the timing or the decision

67. 8803220486 3/15/88 A. Randy Blough, Region 1, to James T. Wiggins, Region I, Re: Pilgrim Status Report for the Period 3 t

February 27 - March 11, 1988 6 pages w

t) 1.f;# . n. . . .v  :. s

>w

!$ '*** .ig, M a*q ,)

Sq g

i. w
f. Ms..t.

.; 4

% .n S

Re: FOIA-88-198 APPENDIX S

.. RECORDS MAINTAINED AMONG PDR FILES

68. 8810270324 11/6/87 Note to Blough from Wessman, subject: Litigation n on Golden Pctition. (25pages)
69. 8801080068 1/7/88 Testimony Before the Senate Labor and Human Resources Connittee Regarding the Pilgrim Nuclear Power Station. (43pages)
70. 8802160312 2/5/88 Ltr to Ralph G. Bird from Richard Wessman, subject: NRC Evaluation of Pilgrim Emergency Operating Procedures. (5pages)
71. 8406210495 1/8/84 SECY-84-230. Stress Corrosion Cracking in Inconel Weld Material. (2 pages)-
72. 8407020292 6/22/84 SECY-84-230A, Stress Corrosion Cracking in Inconel Weld Material. (7 pages)
73. 8803080354 12/8/87 Mark I Containment Performance Program Plan.

(41 pages)

I i

l i

f*

I

(

L.

Re: F0!A-88-198 APPENDIX T RECORDS MAINTAINED IN THE PDR UNDER THE ABOVE REQUEST NUMBER

1. Undated Reportable Event Number 10911: Pilgrim. (1page)
2. Undated Reportable Event Number 10664: Pilgrim. (1page)
3. Undated Potential Degradation of Containment Spray Sy tem. (2 pages)
4. Unda ted Reportable Event Number 08516: Pilgrim. (1 pige)
5. Undated Meeting Between Boston Edison and Nuclear Legulatory Commission Background Documents. (69 pages)
6. Undated Notes for Remarks by Dr. Murley. (6 pages)
7. 1/21/87 Memo for Martin from Bellamy, subject: Charles V. Barry December 16, 1986 Pilgrim Report. (3 pages)
8. 2/10/87 Memo for the Files from Kerr, subject: Testimony before the Special Joint Committee on the Investigation and Study of the Pilgrim Station Nuclear Generating Facility at Plymouth of the Massachusetts Legislature, February 2, 1987. (2 pages)
9. 3/6/87 Handwritten note to Bill Kerr, Jim Wiggins from Bob Capra, with attached updated summary for 2.206 Petition. (14pages) 10, 5/21/87 Memo for Lawrence Shao from Varga, subject: Request for Technical Assistance - Pilgrim 2.206 Petition. (2 pages)
11. Various Announcement from Office of Governmental and Public Affairs, Dates Region I. (2 pages) 12, 7/6/87 Major Plan Design Changes at Pilgrim During RFO-#7. (4 pages)
13. 7/20/87 Pemo for L. Shao, E. Kane from S. Varga, subject: Initial l Assessment of Pilgrim Safety Enhancement Program. (6 pages)
14. 9/87 Core Reload at Pilgrim. (4 pages)
15. 9/27/87 Ltr to Robert Janecek from Richard W. Starostecki, subject:

l Containment Venting. (7 pages)

16. 9/30/87 Ltr to Dr. Thomas Murley from Rachel Shimshak. (6 pages)
17. 10/7/87 Memo for William T. Russell from Samuel Collins, subject:

1 Pilgrim Restart Assessment Panel Meeting Minutes. (3 pages) 1 18, 10/21/87 subject:

j Memo for William Pilgrim Restart T. Russell Assessment from Panel Samuel Meeting J. Collins,(4 pages)

Hinutes.

l l

Re: F01A-88-198 APPENDIX T (Continued)

RECORDS MAINTAINED IN THE PDR UNDER THE AB0VE REQUEST NUF8ER

19. 10/26/87 Note to F. Miraglia, R. Starostecki and S. Collins, from Bruce A. Boger, subject: Response to Massachusetts 2.206 Petition of October 15, 1987 Regarding Pilgrim. (2 pages)
20. Various Announcement from Office of Governmental and Public Affairs, Dates Region I, subject: Pil 8-21, 1987. (5 pages) grim Status Report for the Period October
21. 11/12/87 Handwritten note (1 page)
22. 12/29/87 Memo for William T. Russell from Samel J. Collins, subject:

Pilgrim Restart Assessment Panel Meeting Minutes. (4 pages)

23. Various Announcement from Office of Government 1 and Public Affairs, Dates Region 1, subject: Pil 1-15, 1988. (5 pages) grim Status Repor* for the Period January
24. 2/9/88 Memo for William T. Russell from Samuel J. Collins, subject:

Pilgrim Restart Assessment Panel Meeting Minutes. (4 pages)

25. Various Announcement from Office of Governmental and Public Affairs, Dates Region I, subject: Pilgrim Status Report for the Period February 13-26, 1988. (5 pages) 26, 3/21/88 Memo for Lawrence Shao, Charles Rossi, Jack Roe from Steven A.

Varga, subject: AIT Report on November 12, 1987 Loss of Offsite Power at Pilgrim - Followup Actions. (1 page)

27. 3/23/88 Note for Sandy Shoman from Frank Ingram. (7pages) i 28, 3/31/88 Memo for Thomas A. Rehm from Thomas Murley, subject: Kennedy Questions - 1/7/88 Hearing on Proposed Restart of Pilgrim (EDO #003569) (32 pages)
29. Various Announcement from Office of Governmental and Public Affairs, l Dates Region I, subject: Pilgrim Status Report for the Period March 12-25, 1988. (4 pages)
30. Various Announcement fron Office of Governmental and Public Affairs, l Dates Region I, subject: Pilgrim Status Re March 26 - April 8, 1988. (4 pages) port for the Period
31. 5/9/88 subject:

Memo Pilgrim for William Restart T. Russell Assessment Panel ftom Samuel Meeting J. Collins,(6 pages)

Minutes.

l

32. 5/25/88 Memo for William T. Russell from Samuel J. Collins, subject:

Pilgrim Restart Assessnent Panel Meeting Minutes. (5pages)

Re: F0!A-88-198 APPENDIX T (Continued)

RECORDS MAINTAINED IN THE PDR UNDER THE ABOVE REQUEST NUMBER

33. Various Announcement from Office of Governmental and Public Affairs, Dates Region I, subject: Pilgrim Status Report for the Period May 7-20, 1988. (4 pages)
34. Various Announcement from Office of Governmental and Public Affairs, Dates Region I, subject: Pilgrim Status Report for the Period May 21 - June 3, 1988. (6 pages)
35. 7/12/88 Memo for William T. Russell from Samuel J. Collins, subject:

Pilgrim Restart Assessnent Panel Meeting Minutes. (7 pages)

36. Various Announcement from Office of Governmental end Public Affairs, Dates Region I, subject: Pilgrim Status Report for the Period July 2-15, 1988. (6 pages)
37. 8/15/88 Memo for William T. Russell from Samuel J. Collins, subject:

Pilgrim Restart Assessment Panel Meeting Minutes. (6pages)

38. Various Announcement from Office of Governmental and Public Affairs, Dates Region I, subject: Pilgrim Status Re July 30 - August 12, 1988. (6 pages) port for the Period 4

0

e Re: FOIA.88-198 APPENDIX U RECORDS PARTIALLY WITHHELD

. NUMBER DATE DESCRIPTION & EXEMPTION

1. 9/29/87 Memorandum for Marie Miller from the Commonwealth of Massachusetts re: Meeting Scheduled for October 8, 1987 - Proposed Agenda bearing handwritten notes, (3 pages) - RELEASE MEMO, WITHHELD HANDWRITTEN NOTES, EXEMPTION 5

4 e

Re: FOIA.88-198 APPENDIX _b RECORDS TOTALLY WITHHELD NUMBER DATE DESCRIPTION & EXEMPTION

1. Undated Handwritten notes regarding questions for Chairman and Commissioners re: Pilgrim Restart (7. pages) -

WITHHELD - EXEMPTION 5

2. 12/18/87 List of Issues re: Pilgrim (2 pages) - WITHHELD, EXEMPTION 5 l

I I

b t

i l

f l

y -1s SWlDLER & BERLIN man uD e K STMIT. N T

$UTE 500 ,

TADCNGTON. D C toot)Mi i20 4 944-4500 TIRJI Milli Marc' " 25, 1988 FREEDOM OF IEViATION Director ACT REQUEST .

Office of Administration U.S. Nuclear Regulatory Comrission FOI4 4f-/9/

Washington, D.C. 20555 b #d d-d/'[k In re Freedom of Information Act Request No. 88 __, Concerning Pilgrim Nuclear Power Station

Dear Sir:

In accordance with the provisions of the Freedom of Information Act, 5 U.S.C. 5552 and Part 9, Subpart A of 10 C.F.R., it is requested that the records identified below be made available for inspection and copying:

1. Records of any votes taken by the Commission, and records or transcripts of Commission meetings, with respect to the shutdown of the Pilgrim Nuclear Power Station, or the restart thereof, on or after April 12, 1986.
2. All SECY papers, attachments thereto, records and other materials supporting or forming tbo basis for positions taken therein on the subject of the Pilgrim Nuclear Power Station, prepared on or after January 1, 1980.
3. All records prepared or dated on or after January 1, 1990 (but excluding documents included on Docket No. 50-293 accession listings available f rom the Public Document Room) of NRC Region I, the Office of the Executive Director for Operations, the Office of Inspection and Enforcement, the Office of Investigations, the Office of Nuclear Reactor Regulation, the Office of Nuclear Materials Safety and Safeguards, the Advisory Committee for Reactor Safeguards, the office for Evaluation of Operational Data, and the NRC Emergency Operations Center which discuss, refer to, take positions on, or form the basis for decisions concerning, the performance of the Pilgrim Nuclear Power Station in the l

following areas:

i l

I W '4 9 4

A. Management B. Staffing C. Organization and Organizat cn Structure D. Radiation Protection E. Quality Assurance F. Surveillance G. Maintenance H. Offsite Emergency Planning I. Fire Protection J. Security K. Management Response to NRC Pegulatory Activities

4. All records of Region I, the Office of Nuclear Reactor Reg u'.a t io.1, the Commission, the Offi:e of Inspection and Enforcement, or other Staff or Commission offices relating to, discussing or forming the basis or support for, the Dirertor's Decision ( DD-87-14 ) dated August 21, 1987.
5. All records (other than those categories of documents excluded f rom Item 3) of any office referred to in Item 4, above, discussing, describing, assessing, evaluating, or otherwise relating to actions by the SRC staf f, FEMA, the ACRS, or other NRC or Commission of fices, to follow-up or monitor actions by Boston Edison Company, the Commonwealth of Massachu=etts, other jurisdictions within the 10-mile emergency planning zone for Pilgrim Nuclear Power Station, to address issues raised in the Dire: tor's Decision (DD 14) dated August 21, 1987.
6. All records of the NRC of fices ref erred to in Item 4 discussing, describing, assessing or evaluating, or otherwise relating to actions of the NRC staf f to evaluate the July 1987 Restart Plan, and other actions by Boston Edison Company, its agents or contra: tors, relating to the restart of the Pilgrim Nuclear Power Station.
7. All records of communications (whether written or oral and occurring f rom April 12, 1986 to the present) between any of fice of the NRC Staf f, or of the Commission or of fices reporting directly to it, and Bostor. Edison Company, concerning the status or startup of the Pilgrim Nuclear Power Station.
8. All records of communications (whether written or oral, and occurring f rom April 12, 1986 to the present) between any of fice of the NRC Staf f or of the Coraission or of fices reporting directly to it, and FEMA, other Federal or State agencies or governmental entities, er persons concerning the status, startup, or issues relating o startup, of the Pilgrim Nuclear Power Station.
9. All records in the possession of any NRC Staff or Commission office pertaining to (a) the evaluation by FEMA, !;RC , or any other entity or a;ency, of the adequacy of offsite emergency plans for the Pil? :m Nuclear Power Station, and 'b) the conduct and/or evalustion of drills, full scale / full participation or :.artial scale / partial participation exercises corducted or planned for the Pilgrim Nuclear Power Station.

For purposes of this request, "record" or "document" is defined to include, bu not be limited to, notes, memorenda, reports, meeting minutes, logs, transcripts, letters, position or policy papers, interpretatior.s of requirements, and guidance documents, and refers c draf ts as well as any final version of any record or document requested.

Sine ly, 4 f IC Q eE Jo son, Esq.

> (202)944-438 1

GEJ/veg 1

l i

i i

I t

1 i

l l