ML20207T650

From kanterella
Revision as of 13:58, 5 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That 861224 Description of Operations Qa/Qc Program Meets Requirements of 10CFR50,App B & Acceptable
ML20207T650
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/20/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8703240213
Download: ML20207T650 (1)


Text

ONid,ay February 20, 1987 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President '

r Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

SHEAR 0N HARRIS OPERATIONS QUALITY ASSURANCE / QUALITY CONTROL PROGRAM This refers to your letter dated December 24, 1986 (NLS-86-467), which provided a current description of the Operations gaality assurance / quality control program for the Shearon Harris Unit 1 facility (Docket No. 50-400). Our review of this information indicates that your quality assurance program continues to meet the requirements of 10 CFR 50 Appendix B and is therefore acceptable.

Pler.se contact me if you have any questions concerning this letter. We appreciate your timely submittal regarding this information.

Sincerely, (Original signed by L. A. Reyes)

Luis A. Reyes, Acting Director Division of Reactor Projects cc: R. A. Watson, Vice President Harris Nuclear Project D. L. Tibbitts, Director of Regulatory Compliance J. L. Willis, Plant General Manager bec: C. Barth, OGC J. Moore, 0GC B. Belke, IE A. Belisle, RII M. Runyan, RII NRC Resident Inspector Document Control Desk State of North Carolina

,n RII RI RII'/ RII RII

/' b, GBe(J4 lisle:btm CJu an VR,4hciera PFrbdrickson DVerrelli 2/j6/87 2 , /87 m

7/p87 2/g87 2//<f/87 b

ZEc/