|
---|
Category:Inspection Plan
MONTHYEARIR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 ML23261B1852023-09-14014 September 2023 Notification of Inspection and Request for Information IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23146A1342023-05-26026 May 2023 Information Request, Security IR 2023402 ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) IR 05000382/20220122022-09-16016 September 2022 Digital Instrumentation and Control Modification Inspection Report 05000382/2022012 ML22229A5362022-08-23023 August 2022 Inspection Plan Transmittal Letter-2022 Mid-Cycle-Final ML22187A0362022-07-11011 July 2022 Notification of NRC Design Bases Assurance Inspection (Programs) (05000382/2022013) and Request for Information ML22144A1662022-05-24024 May 2022 PI&R Request for Information and Transmittal e-mail ML22108A1802022-05-0202 May 2022 WF3 Cpcs RF24 Inspection Plan ML22108A1792022-04-14014 April 2022 WF3 Cpcs Installation Inspection Plan Email IR 05000382/20210062022-03-0202 March 2022 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2021006) ML21327A4542021-11-22022 November 2021 ISI PWR RFI ML21280A0812021-10-0505 October 2021 Email 10-5-21 - Request for Information_ Waterford EP Inspection (71114.04 & 71151) - Nov-Dec 2021 IR 05000382/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Waterford Steam Electric Station - Unit 3, (Report 05000382/2021005) ML21216A4562021-08-0404 August 2021 WF3 2021 EP Exercise Inspection Request for Information (RFI) ML21196A5302021-07-19019 July 2021 Wat 2021010 RFI Letter 21N_05 Gap ML21195A0692021-07-13013 July 2021 Staton, Unit 3 - Notification of Digital Instrumentation and Control Modification Inspection and Request for Information ML21159A2262021-06-0808 June 2021 Notification of NRC Triennial Heat Exchanger/Heat Sink Performance Inspection 05000382/2021003 and Request for Information ML21125A6522021-05-0606 May 2021 Wat 2021003 Brq RFI- Md, Waterford Steam Electric Station, Unit 3, Notification of Inspection (NRC Inspection Report 05000382/2021003) and Request for Information ML21061A3432021-02-25025 February 2021 Request for Information: Waterford-3, Dated January 6, 2021, Inspection Report 05000382/2021-001 Occupational Radiation Safety Inspection-2 ML20288A2082020-10-0808 October 2020 8Oct2020 Email - Request for Information (RFI) to Support and Prepare for the Emergency Preparedness (EP) Program Inspection at the Waterford 3 Station Scheduled to Occur the Week of December 7, 2020 IR 05000382/20200052020-09-0101 September 2020 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 (Report 05000382/2020005) ML20125A3212020-05-0404 May 2020 WAT2020410 Inspection Document Request ML20055E1122020-03-0303 March 2020 WAT2019006 Annual Assessment Letter IR 05000382/20190052019-08-30030 August 2019 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3, Report 05000382/2019005 ML19113A2952019-04-25025 April 2019 Notification of Inspection (NRC Inspection Report 05000382/2019003 and Request for Information IR 05000382/20180062019-03-0404 March 2019 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382/2018006) ML19035A6342019-02-0404 February 2019 Notification of NRC Design Bases Assurance Inspection (Programs) (05000382/2019010) and Initial Request for Information IR 05000382/20180052018-08-31031 August 2018 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 (Report 05000382/2018005) IR 05000382/20170062018-03-0101 March 2018 Annual Assessment Letter for Waterford Steam Electric Station Unit 3, (Report 05000382/2017006) IR 05000382/20170052017-08-28028 August 2017 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 (Report 05000382/2017005) IR 05000382/20160062017-03-0101 March 2017 Annual Assessment Letter for Inspection Report 05000382/2016006 IR 05000382/20170012017-02-24024 February 2017 Waterford Steam Electric Station, Unit 3 - Notification of NRC Triennial Heat Sink Performance Inspection (05000382/2017001) and Request for Information ML17055A6702017-02-24024 February 2017 Notification of NRC Triennial Heat Sink Performance Inspection (05000382/2017001) and Request for Information IR 05000382/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382/2016005) ML16237A0652016-08-31031 August 2016 Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382/2016005) IR 05000382/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Waterford Steam Electric Station, Unit 3 (NRC Physical Security Inspection Report Number 05000382/2016401) IR 05000382/20150062016-03-0202 March 2016 Annual Assessment Letter for Waterford Unit 3 (Report 05000382/2015006) IR 05000382/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Waterford Steam Electric Station, Unit 3 (NRC Physical Security Inspection Report Number 05000382/2015401) IR 05000382/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2015005) ML15149A2562015-05-28028 May 2015 Notification of Inspection (NRC Integrated Inspection Report 05000382/2015003)And Request for Information IR 05000382/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382/2014006) IR 05000382/20130012014-03-0404 March 2014 Annual Assessment Letter for Waterford Steam Electric Station (Report 05000382/2013001) IR 05000382/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382-13-006) 2024-08-21
[Table view] Category:Letter
MONTHYEARIR 05000382/20244022024-10-10010 October 2024 Security Baseline Inspection Report 05000382/2024402 Public IR 05000382/20244032024-10-0909 October 2024 Security Baseline Inspection Report 05000382/2024403 IR 05000382/20240112024-10-0101 October 2024 State Fire Protection Team Inspection Report 05000382/2024011 IR 05000382/20230042024-09-27027 September 2024 Amended Integrated Inspection Report 05000382/2023004 ML24229A1042024-09-25025 September 2024 Integrated Inspection Report 05000382/2023004, Disputed Non-Cited Violation Revised ML24268A1132024-09-24024 September 2024 Acknowledgment of Response to NRC Inspection Report 05000382/2024013, and Notice of Violation ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000382/20240132024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24228A2612024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike2024-08-15015 August 2024 Automatic Reactor Trip Due to Lightning Strike IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24141A1012024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 ML24137A3352024-05-16016 May 2024 Automatic Reactor Trip Due to Transformer Failure ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 ML24039A1992024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) 2024-09-06
[Table view] |
Text
September 1, 2021
SUBJECT:
UPDATED INSPECTION PLAN FOR WATERFORD STEAM ELECTRIC STATION - UNIT 3 (REPORT 05000382/2021005)
Dear Mr. Ferrick:
The enclosed inspection plan lists the inspections scheduled through June 30, 2023, for Waterford Steam Electric Station, Unit 3. The U.S. Nuclear Regulatory Commission (NRC)
provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the Reactor Oversight Process (ROP). Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions located in the NRCs Agencywide Documents Access and Management System (ADAMS) (ADAMS Accession No. ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.
The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately. The Regional Administrator has approved the staffs plan to conduct Inspection Procedure 52003, Digital Instrumentation and Control Modification Inspection, at your facility as indicated in the enclosed inspection plan.
The Regional Administrator has approved the staffs plan to conduct Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, at your facility as indicated in the enclosed inspection plan.
On March 12, 2018, the NRC issued a Confirmatory Order (ADAMS Accession No.
ML18072A191) (EA-17-132 and EA-17-153) to the Entergy fleet that included Waterford 3. The Regional Administrator has approved the staffs plan to conduct follow-up inspection of Entergys implementation of actions required by the Confirmatory Order actions in accordance with Inspection Procedure 92702, Followup on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, And Alternative Dispute Resolution Confirmatory Orders. The NRC will continue to coordinate with Entergy regarding this inspection, which is currently in progress.
Additionally, on April 5, 2019, the NRC issued Inspection Report 05000382/2019412 (ADAMS Accession No. ML19095B573) (EA-18-138) which documented two Severity Level III traditional enforcement violations associated with willfulness and involving several instances of improper operator log-taking at Waterford Steam Electric Station, Unit 3. The Regional Administrator has approved the staffs plan to review these violations in their entirety under Inspection Procedure 92702 during the inspection to follow up on the related Entergy Confirmatory Order.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of ADAMS and is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (817) 200-1574 with any questions you have regarding this letter.
Sincerely, John L. Digitally signed by John L. Dixon Dixon Date: 2021.09.01 08:40:46 -05'00'
John L. Dixon, Jr, Chief Reactor Projects Branch D Division of Reactor Projects Docket No. 05000382 License No. NPF-38 Enclosure:
Inspection Plan cc w/ encl: Distribution via LISTSERV
ML21232A228 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: ASanchez Yes No Publicly Available Sensitive NRC-002 OFFICE SPE: DRP/D BC: DRP/D NAME ASanchez JDixon SIGNATURE AAS JLD DATE 08/18/2021 09/01/2021
IP 22b Site Inspection Activity Plan Waterford 07/01/2021 - 06/30/2023 Unit Start End Activity CAC Title Staff Count W3 CPCS Modification 10 3 7/25/2021 8/13/2021 IP 52003 000568 Digital Instrumentation and Control Modification Inspection W3 2021 BRQ 3 3 7/25/2021 7/31/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance In-Office EP Exercise Scenario Review - WAT 4 3 8/15/2021 9/26/2021 IP 71114.08 000723 Exercise Evaluation Scenario Review Heat Sink Performance 07T - Waterford 2 3 8/23/2021 8/27/2021 IP 71111.07T 000700 Heat Sink Performance Fire Protection Inspection - WAT 3 3 10/17/2021 10/23/2021 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
3 10/31/2021 11/6/2021 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
EP 2021 Exercise and PI Inspection 4 3 10/1/2021 12/31/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3 10/25/2021 10/29/2021 IP 71114.01 000716 Exercise Evaluation 3 10/25/2021 10/29/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3 10/25/2021 10/29/2021 IP 71151 001397 Performance Indicator Verification W3 CPCS Testing 3 3 10/31/2021 11/13/2021 IP 52003 000568 Digital Instrumentation and Control Modification Inspection Security Access Authorization .01 and Access Control .02 w/PIV 2 3 11/1/2021 11/5/2021 IP 71130.01 000733 Access Authorization 3 11/1/2021 11/5/2021 IP 71130.02 000734 Access Control 3 11/1/2021 11/5/2021 IP 71130.09 001656 Security Plan Changes 3 11/1/2021 11/5/2021 IP 71151 001338 Performance Indicator Verification RP 2,5,8 2 3 11/15/2021 11/19/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 3 11/15/2021 11/19/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation 3 11/15/2021 11/19/2021 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation W3 2022 INITIAL EXAM 4 3 12/12/2021 12/18/2021 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
3 1/23/2022 1/29/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
EP 2022 Program & PI Inspection - WAT 1 3 1/10/2022 1/14/2022 IP 71114.02 000717 Alert and Notification System Testing Prepared on 8/18/2021 2:03:09 PM 1 of 3
IP 22b Site Inspection Activity Plan 3 1/10/2022 1/14/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 3 1/10/2022 1/14/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3 1/10/2022 1/14/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness 3 1/10/2022 1/14/2022 IP 71151 001397 Performance Indicator Verification RP 6,7 2 3 2/14/2022 2/18/2022 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 3 2/14/2022 2/18/2022 IP 71124.07 000731 Radiological Environmental Monitoring Program Security Access Control .02 1 3 3/21/2022 3/25/2022 IP 71130.02 000734 Access Control 3 3/21/2022 3/25/2022 IP 71130.09 001656 Security Plan Changes 3 3/21/2022 3/25/2022 IP 71151 001338 Performance Indicator Verification Inservice Inspection RF24 - WAT 1 3 4/2/2022 4/16/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
W3 CPCS Installation 6 3 4/4/2022 5/20/2022 IP 52003 000568 Digital Instrumentation and Control Modification Inspection License Renewal Inspection 71003 (Phase 1) - WAT 2 3 4/11/2022 4/15/2022 IP 71003 000687 Post-Approval Site Inspection for License Renewal RP 1,2,PI 2 3 4/11/2022 4/15/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3 4/11/2022 4/15/2022 IP 71124.02 000726 Occupational ALARA Planning and Controls Security Protective Strategy .05 2 3 6/20/2022 6/24/2022 IP 71130.05 000737 Protective Strategy Evaluation Waterford 3 Biennial PI&R 4 3 7/11/2022 7/15/2022 IP 71152B 000747 Problem Identification and Resolution 3 7/25/2022 7/29/2022 IP 71152B 000747 Problem Identification and Resolution Power-Operated Valves Inspection - 21N - Waterford 3 3 9/19/2022 10/7/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements Security Training/Equip Maint .07 and .04 2 3 10/3/2022 10/7/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 3 10/3/2022 10/7/2022 IP 71130.07 000739 Security Training RP 2,4 2 3 11/28/2022 12/2/2022 IP 71124.02 000726 Occupational ALARA Planning and Controls 3 11/28/2022 12/2/2022 IP 71124.04 000728 Occupational Dose Assessment Design Bases Assurance Inspection (Team) - 21M - Waterford 6 3 1/1/2023 6/30/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
Prepared on 8/18/2021 2:03:09 PM 2 of 3
IP 22b Site Inspection Activity Plan RP 5,8 2 3 1/30/2023 2/3/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation 3 1/30/2023 2/3/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Security Access Authorization .01 and Access Control .02 + PIV + Plan Change .09 2 3 3/20/2023 3/24/2023 IP 71130.01 000733 Access Authorization 3 3/20/2023 3/24/2023 IP 71130.02 000734 Access Control 3 3/20/2023 3/24/2023 IP 71130.09 001656 Security Plan Changes 3 3/20/2023 3/24/2023 IP 71151 001338 Performance Indicator Verification EP 2023 Exercise Scenario In-Office Rvw 71114.08 - WAT 4 3 4/16/2023 5/20/2023 IP 71114.08 000723 Exercise Evaluation Scenario Review EP 2023 Exercise & PI Inspection - WAT 4 3 6/19/2023 6/23/2023 IP 71114.01 000716 Exercise Evaluation 3 6/19/2023 6/23/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3 6/19/2023 6/23/2023 IP 71151 001397 Performance Indicator Verification Prepared on 8/18/2021 2:03:09 PM 3 of 3