ML20125A321

From kanterella
Jump to navigation Jump to search
WAT2020410 Inspection Document Request
ML20125A321
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/04/2020
From:
Division of Nuclear Materials Safety IV
To:
References
IR 2020410
Download: ML20125A321 (3)


Text

ADAMS Accession Number: ML20125A321 PAPERWORK REDUCTION ACT STATEMENT This letter contains mandatory information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0011). Send comments regarding this information collection to the Information Services Branch, Office of the Chief Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and Budget, Washington, DC 20503.

Public Protection Notification The NRC may not conduct nor sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.

1

ADAMS Accession Number: ML20125A321 Information Request Waterford, Unit 3 71130.02, 71130.09, and PIV Inspection Date June 08-12, 2020 Please provide the attached information to the inspection team for in-office inspection and review to arrive at our regional office no later than May 28, 2020. Items may be provided on disc, in hard copy, Certrec, or a combination. NOTE: DO NOT forward any information on flash drives as current NRC procedures prohibit using this type of media unless issued by the NRC. Please properly package and mark SGI materials. If you have NON-SGI procedures or materials that you can send via email, feel free to do so to christopher.jewett@nrc.gov, although the use of CERTREC is encouraged. Thank you in advance for your assistance.

Send to: Attention, Christopher Jewett U.S. Nuclear Regulatory Commission 1600 E. Lamar Blvd.

Arlington TX 76011-4511 In an effort to keep the requested information organized please submit the information to us using the same lettering system below. For example, the first inspection procedure should be in a file/folder titled 1- A, Applicable organization charts in file/folder 1- B, etc.

General: All Security Event Log entries since May 16, 2019. Security Program Procedure indices for all procedures, instructions, desk-top guides, standing orders, etc. Please state what revision of your physical security plan you are currently using.

Document Request List

1. Access Control (71130.02) (effective date 01/01/2019)

A. Corrective action report summaries that are any way associated with the Access Control program from May 16, 2019 to the date you provide this information request. Please provide any additional Access Control CRs that may be written after the delivery date while I am on site or through Certrec.

B. Any Access Control policy, procedure, desk-top guide, or any other type of lower tier instruction type document that you may use, such as: search and entry programs, VA alarm response, personnel and vehicle escort programs, access portal equipment testing, etc.

C. Current list of names who have UAA/UA to the PA. List of names who have UAA/UA to the VA. List of names who have been issued keys/codes to access control devices.

D. Any Lock and Key policy, procedure, desk-top guide, or any other type of lower tier instruction type document that you may use for the Lock & Key program.

E. Access Control Program related reviews, independent audits, or self-assessments since May 16, 2019.

LAST ITEM FOR 71130.02 2

ADAMS Accession Number: ML20125A321

2. Security Plan Changes (71130.09) (effective date 01/01/2020)

Please be prepared to provide the following items during the onsite inspection:

A. The latest version of the Physical Security Plan.

B. The security plan revision utilized May 16, 2019 (last baseline inspection).

C. All security plan changes that have been submitted to the NRC since May 16, 2019.

D. Procedures associated with plan changes since May 16, 2019.

E. Training material (i.e., lesson plans, briefing materials, computer-based training) developed to provide training to personnel responsible for implementing the plan change(s) since May 16, 2019.

LAST ITEM FOR 71130.09

3. Performance Indicator Verification (71151) (effective date 01/01/2017)

Please be prepared to provide sample information related to PP01: Protected Area Security Equipment Performance Index Sample LAST ITEM 3