UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

August 31, 2016

Mr. Michael R. Chisum

Site Vice President

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WATERFORD STEAM ELECTRIC

STATION, UNIT 3 (REPORT 05000382/2016005)

Dear Mr. Chisum:

On August 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle

performance review of Waterford Steam Electric Station, Unit 3. The NRC reviewed the most

recent quarterly performance indicators (PIs) in addition to inspection results and enforcement

actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRCs

assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Waterford Unit 3 operated in a manner that preserved public

health and safety and met all cornerstone objectives. The NRC determined the performance at

Waterford Unit 3 during the most recent quarter was within the Licensee Response Column of

the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had

very low (i.e., Green) safety significance, and all PIs indicated that your performance was within

the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline

inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the second half of the inspection plan are tentative and may be revised

at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the

resolution of any scheduling conflicts and personnel availability issues. The NRC will contact

you as soon as possible to discuss changes to the inspection plan should circumstances

warrant any changes. This inspection plan does not include security related inspections, which

will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order

Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-

Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to

Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts

towards compliance with these Orders, and the information gathered will aid staff in

development of the ultimate Safety Evaluation for the site. After the NRC staff receives the

Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff

will confirm through inspections the full implementation of the orders mentioned above by

M. Chisum -2-

performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies

and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness

Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the

Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the

NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning

in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue

to conduct quarterly assessment meetings and communicate changes in the assessment of

licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,

Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Please contact me at 817-200-1173 with any questions you have regarding this letter.

Sincerely,

/RA/

Geoffrey B. Miller, Branch Chief

Projects Branch D

Division of Reactor Projects

Docket No. 50-382

License No. NPF-38

Enclosure:

Waterford Plant Inspection/Activity Plan

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information WAT

Page 1 of 2 Waterford

08/30/2016 09:36:55 Inspection / Activity Plan

Report 22

07/01/2016 - 06/30/2018

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

RS 24 - RADIATION SAFETY 2

3 09/12/2016 09/16/2016 IP 71124.02 Occupational ALARA Planning and Controls

3 09/12/2016 09/16/2016 IP 71124.04 Occupational Dose Assessment

ISFSI - LOADING INSPECTION (ONE WEEK IN MONTH) 1

3 10/01/2016 10/30/2016 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

EXAM - INITIAL EXAM 4

3 02/15/2017 02/18/2017 X02588 INITIAL EXAM WAT3 (04/2017)

3 03/27/2017 03/31/2017 X02588 INITIAL EXAM WAT3 (04/2017)

TSB 52B - BIENNIAL PI&R INSPECTION 5

3 11/28/2016 12/02/2016 IP 71152B Problem Identification and Resolution

3 12/12/2016 12/16/2016 IP 71152B Problem Identification and Resolution

EB2-02 - LICENSE RENEWAL INSPECTION 4

3 01/23/2017 01/27/2017 IP 71002 License Renewal Inspection

3 02/06/2017 02/10/2017 IP 71002 License Renewal Inspection

EB1-07T - WAT HEAT SINK PERFORMANCE 1

3 03/20/2017 03/24/2017 IP 7111107T Heat Sink Performance

RS 12 PI - RADIATION SAFETY 3

3 04/24/2017 04/28/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

3 04/24/2017 04/28/2017 IP 71124.02 Occupational ALARA Planning and Controls

3 04/24/2017 04/28/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness

3 04/24/2017 04/28/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences

71111.08 - INSERVICE INSPECTION RFO 21 1

3 04/24/2017 05/05/2017 IP 7111108P Inservice Inspection Activities - PWR

BRQ - BRQ INSPECTION 3

3 07/24/2017 07/28/2017 IP 7111111B Licensed Operator Requalification Program

EB1-21M - WAT COMPONENT DESIGN BASES INSPECTION 6

3 10/16/2017 11/17/2017 IP 7111121M Component Design Bases Inspection (Teams)

RS 5678 - RS TEAM 5

3 11/27/2017 12/01/2017 IP 71124.05 Radiation Monitoring Instrumentation

3 11/27/2017 12/01/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment

3 11/27/2017 12/01/2017 IP 71124.07 Radiological Environmental Monitoring Program

3 11/27/2017 12/01/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Official Use Only - Sensitive Internal Information/Security-Related Information

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information WAT

Page 2 of 2 Waterford

08/30/2016 09:36:55 Inspection / Activity Plan

Report 22

07/01/2016 - 06/30/2018

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

EP-2 - BIENNIAL EP EXERCISE INSPECTION 4

3 12/04/2017 12/08/2017 IP 7111401 Exercise Evaluation

3 12/04/2017 12/08/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes

EP-3 - EP PERFORMANCE INDICATOR REVIEW 1

3 12/04/2017 12/08/2017 IP 71151-EP01 Drill/Exercise Performance

3 12/04/2017 12/08/2017 IP 71151-EP02 ERO Readiness

3 12/04/2017 12/08/2017 IP 71151-EP03 Alert & Notification System Reliability

EB1-17T - WAT PERM PLANT MODS AND 50.59 3

3 04/02/2018 04/06/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications

3 04/16/2018 04/20/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Official Use Only - Sensitive Internal Information/Security-Related Information

ML16237A065

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: GBM Yes No Non-Publicly Available Sensitive NRC-002

OFFICE: RIV D: DRS D: DRP C: DRP/D

NAME AVegel TWPruett GBMiller

SIGNATURE /RA-JClark for /RA/ /RA/

DATE 8/19/16 8/18/16 8/22/16

Letter to Michael R. Chisum from Geoffrey B. Miller dated August 31, 2016

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WATERFORD STEAM ELECTRIC

STATION, UNIT 3 (REPORT 05000382/2016005)

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Frances.Ramirez@nrc.gov)

Resident Inspector (Chris.Speer@nrc.gov)

Administrative Assistant (Vacant)

Senior Project Engineer, DRP/D (Vacant)

Project Engineer (Jan.Tice@nrc.gov)

Project Engineer (Brian.Parks@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (April.Pulvirenti@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov

ROPassessment.Resource@nrc.gov