ML21125A652

From kanterella
Jump to navigation Jump to search
Wat 2021003 Brq RFI- Md, Waterford Steam Electric Station, Unit 3, Notification of Inspection (NRC Inspection Report 05000382/2021003) and Request for Information
ML21125A652
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/06/2021
From: Matthew Doyle
Division of Reactor Safety IV
To: Ferrick J
Entergy Operations
References
IR 2021003
Download: ML21125A652 (8)


See also: IR 05000382/2021003

Text

May 6, 2021

Mr. John Ferrick, Site Vice President

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057

SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3, NOTIFICATION OF

INSPECTION (NRC INSPECTION REPORT 05000382/2021003) AND

REQUEST FOR INFORMATION

Dear Mr. Franssen:

During the week of July 26, 2021, two inspectors from the Nuclear Regulatory Commissions

(NRC) Region IV office will perform the baseline biennial requalification inspection at Waterford

3, using NRC Inspection Procedure 71111.11B, Licensed Operator Requalification Program.

Experience has shown that this inspection is a resource intensive inspection both for the NRC

inspectors and your staff. To minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

These documents have been divided into three groups:

  • The first group (Section A of the enclosure) identifies information to be provided prior to

the inspection to ensure that the inspectors are adequately prepared.

  • The second group (Section B of the enclosure) identifies the information the inspectors

will need upon arrival at the site.

  • The third group (Section C of this enclosure) identifies the items which are necessary to

close out the inspection and are usually sent a few weeks after the inspectors have left

the site.

It is important that all these documents are up to date and complete to minimize the number of

additional documents requested during the preparation and/or the onsite portions of the

inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Van Ford of your training organization.

Our inspection dates are subject to change based on your updated schedule of examination

activities. If there are any questions about this inspection or the material requested, please

contact me, Matthew Doyle, at (419) 202-4140 (msd2@nrc.gov).

J. Ferrick 2

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Matthew Doyle, Operations Engineer

Operations Branch

Division of Reactor Safety

Docket No. 50-382

License No. NPF-38

Enclosure:

Initial Request for Information

Biennial Requalification Inspection

cc w/ encl: Distribution via LISTSERV

ML21125A652

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: Matt Doyle Yes No Publicly Available Sensitive NRC-002

OFFICE OE:DRS/OB OE:DRS/OB

NAME B. Bergeon M. Doyle

SIGNATURE BAB Matt Doyle

DATE 05/04/2021 05/03/2021

Initial Request for Information

Biennial Requalification Inspection

Waterford 3

Inspection Report: 05000382/2021003

Inspection Dates: July 26, 2021 to July 30, 2021

Inspection Procedure: IP 71111.11B, Licensed Operator Requalification

Program

Lead Inspector: Matt Doyle, Operations Engineer

A. The following information is requested to support inspection preparation activities.

These items are listed by section as they appear in the inspection module (i.e. 03.04a,

03.04b, etc.). Requested materials should be sent in an electronic format on CD/DVD

to arrive at the Region IV office no later than July 5, 2021.

  • CD/DVD to: US Nuclear Regulatory Commission, Region IV

ATTN: Matt Doyle

1600 E. Lamar Blvd

Arlington, TX 76011

General Requests:

  • List of licensed senior reactor operators (SRO) and reactor operators (RO) by crew

(operating and staff).

  • Training and Operations Department organization charts (with qualified licensed

operator requalification (LOR) evaluators identified).

  • Procedures that identify process for revising and maintaining LO (licensed operator)

continuing training program up to date.

  • List of outstanding LOR program changes.
  • List of plant events and industry operating experience incorporated into LOR

program since last biennial requalification inspection.

  • Audits and/or self-assessment reports addressing the licensed operator

requalification training program.

  • Last 2 years of Simulator Review Committee (or equivalent) meeting minutes.
  • Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes.
  • A summary report of all condition reports related to operator actions/errors in the

control room.

Enclosure

  • Any revised requalification training that was based on licensed operator performance

issues.

03.04a: Biennial Requalification Written Examinations

  • The current and approved biennial written examination schedule.
  • The current requalification cycle written examination results for both SRO and RO

that have already been administered up to the week prior to the inspectors arrival

onsite.

  • All written examinations that have been approved for administration up to and

including the week before the inspectors are onsite. This will need to have adequate

password protection or double envelope protection if mailed via regular mail per

NUREG-1021.

  • The current requalification cycle examination methodology (sample plan).

03.04b: Annual Requalification Operating Tests

scenarios) to be given the week of July 26, 2021 (week inspectors are onsite).

  • The operating tests (JPMs and scenarios) (password protected and provide

separately via telephone at later date) to be given the week of July 26, 2021.

  • Current requalification cycle operating tests (SRO and RO) and results up to the

week prior to the inspection inspectors arrival onsite.

  • All 2020 NRC required annual operating tests.
  • Current requalification cycle operating test methodology (sample plan).

03.04c: Administration of an Annual Requalification Operating Test

  • All procedures used to administer the annual operating test.
  • All procedures used to assess operator performance.
  • All procedures that describe conduct of simulator training.
  • All procedures used to test, operate, and maintain the simulator.

03.04d: Requalification Examination Security

  • Submit any tracking tools that you use to prevent excessive overlap on the written

examinations and meet the intent of sampling all required topics on a periodic basis.

  • Submit any tracking tools that you use to prevent excessive overlap on the operating

tests and meet the intent of sampling all required malfunctions (including major

events, instrument/component malfunctions, technical specification (TS) calls, etc.)

on a periodic basis.

2

  • All procedures that describe examination security, including procedures used to

develop the examinations that include guidelines on overlap between examinations

in current exam cycle tests and prior year examinations.

  • List of all condition reports since the last biennial requalification inspection related to

examination security and overlap.

03.04e: Remedial Training and Re-Examinations

  • List of remedial training conducted or planned since last requalification exam

(includes training provided to operators to enable passing requalification exam and

training provided to correct generic or individual weaknesses observed during

previous requalification exam cycle).

  • Remediation plans (lesson plans, reference materials, and attendance

documentation).

03.04f: Operator License Conditions

  • All procedures and program documentation for maintaining active operator licenses,

tracking training attendance, and ensuring medical fitness of licensed operators.

  • All procedures and associated documentation that supports reactivation of any

SRO/RO license (operating or staff crew) since the last biennial inspection.

03.04g: Control Room Simulator

  • All simulator management and configuration procedures if not already provided.
  • Simulator discrepancy report summary list for all open discrepancy reports and

summary list for those items closed since July 2019.

  • Primary parameters tested to verify core physics parameters (such as moderator

temperature coefficient, integral rod worth). The applicable reference graphs from

the plant physics data book (electronic or other means as available) should also be

included as well as the test procedures used and the acceptance criteria with results.

  • All simulator modification packages that are on hold, delayed, or not completed in the

last 2 years.

  • A list of simulator modification packages completed in the last two-year window.

3

B. The following information is requested to support the onsite inspection activities.

Requested materials should be available to the inspectors, either electronically or

hardcopy, upon site arrival on July 26, 2021.

03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written

Exam and Annual Requalification Operating Tests Quality

  • All operating tests (JPMs and scenarios) to be given in all subsequent weeks after

onsite week, if available.

  • All results up to the day the inspectors leave the site.

03.04f: Conformance with Operator License Conditions

  • Access to licensed operators records (operating and staff crews).
  • Access to licensed operators training attendance records.
  • Access to licensed operators medical records.

03.04g: Control Room Simulator Performance

  • Simulator discrepancies from July 2019. This should include all open and closed

simulator discrepancy reports, including the documentation/justification for closure.

  • Acceptance test documentation, including hardware and software model revisions at

the time of acceptance (as available).

  • Documentation that validates current models, including the thermal-hydraulics and

neutronics models, to the actual plant.

  • All current model deficiencies, including final safety analysis report (FSAR) vs design

differences in the simulator (any documentation on this).

  • Summary list of modifications from July 2019.
  • Plant modifications (both hardware and software) completed on the simulator by due

date from July 2019.

  • Simulator differences lesson plan used in training (current to July 26, 2021).
  • The complete book of all simulator annual performance test packages (usually in a

single book but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests. This should also include

the test procedures for each test, the acceptance criteria, and results. For each

transient test, the reference chart should be included or an equivalent subject matter

expert review versus the simulator results with a write-up for any differences beyond

the American National Standards Institute (ANSI) standard requirements.

  • All test packages used to verify core physics parameters (such as moderator

temperature coefficient and integral rod worth). The applicable reference graphs

from the plant physics data book (electronic or other means as available) should also

4

be included as well as the test procedures used and the acceptance criteria with

results.

  • All simulator tests, configuration management, and related documents available in

the room for inspectors to review. This includes training needs analysis packages,

Simulator Review Committee meeting minutes, etc.

  • Current copy of ANSI 3.5 standard you are committed to for simulator testing.

C. Waterford 3 is required to send the final results summary (see Table 1 below) and any

remaining exams and operating tests that have not been reviewed to the regional

office lead inspector for this inspection for final review and comparison against the

Significance Determination Tools to communicate the exit results for the inspection.

TABLE 1: EXAMINATION RESULTS

1. Total number of licensed operators.

2. Number of licensed operators administered a requalification

examination required by 10 CFR 55.59(a).

3. Number of individual licensed operators who failed any portion of a

requalification examination (written, JPM, or individual simulator

scenario failures).

4. Divide line 3 by line 2 to obtain the individual requalification

examination failure rate. Line 3/Line 2.  %

5. Number of crews administered simulator scenarios as part of a

requalification examination required by 10 CFR 55.59(a).

6. Number of crews who performed unsatisfactorily on the

simulator scenarios.

7. Divide line 6 by line 5 to obtain the crew simulator scenario

failure rate. Line 6/Line 5.  %

5