ML20214J526

From kanterella
Revision as of 15:17, 4 May 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to Recipient Expressing Support for NRC Shut Down of Peach Bottom Atomic Power Station & Concern Re Emergency Planning Issues at Seabrook.Commission Unable to Comment on Issues Before Commission or Adjudicatory Boards
ML20214J526
Person / Time
Site: Peach Bottom, Seabrook, 05000000
Issue date: 05/15/1987
From: Zech L
NRC COMMISSION (OCM)
To: Humphrey G
SENATE
Shared Package
ML20214J527 List:
References
CON-#287-3462 OL, NUDOCS 8705280085
Download: ML20214J526 (3)


Text

,

' UNITED STATES DISTRIBUTION

'{y

- :8' , , . o NUCLEAR REGULATORY COMMISSION Stello f- E WASHINGTON, 0. C. 20555 Taylor i

  • Rehm

%, p# ED0-2727

          • SECY CHAIRMAN May 15, 1987 OCA Murley, NRR Sniezek, NRR SVarga, NRR Murray,0GC/B Russell, RI Allan, RI Williams, RI The Honorable Gordon J. Humphrey United States Senate Cowgill, RI WButler, NRR Washington, DC 20510 PDR LPDR

Dear Senator Humphrey:

Thank you for your letter of April 2,1987 expressing support for the NRC's actions at the Peach Bottom Atomic Power Station. The Commission believes that reactor operators are-a key element in ensuring the safety of nuclear power plants and that any action on the part of operators that places the plant in jeopardy cannot be tolerated. The NRC shares your concerns regarding the problems that have been identified at Peach Bottom. We are determined to see that these problems are resolved prior to restart of Peach Bottom.

You also commented about the Seabrook plant. I hope you will understand that the Commission may not comment on the substance of the Seabrook emergency planning issues so long as those matters are before the Commission or its adjudicatory Boards for resolution. Any resolution must be made on the record of the Seabrook proceeding. For your information, we will serve your letter on the parties to that proceeding.

With respect to Public Service Company of New Hampshire's request for a waiver of the regulation establishing the size of the emergency planning zone, that request was found insufficient by the Licensing Board that considered it. Lacking a favorable determination that a prima facie case has been made, the waiver I

request will not receive further Commission consideration on the merits.

I assure you that we will continue to take the. steps necessary in j regulating nuclear power for the protection of the public health and safety.

Commissioner Roberts did not participate in this response.

Sincerely, b u.

Lando W. Zec

/L .

Jr. [

(Originated by Williams:RI) 8705280085 870515

{DR ADOCK 05000171 PDR

..s . . _ _ ... .. . _ _ _ _. . . _ . _ _ _ _ _ _ _. . - _ _ . _ _ _ _ _ _ _. -_- ... _ _ -_ _ _.

/ 'o,, UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION -

g WASHINGTON, D. C. 20555 EDO PRINCIPAL CORRESPONDENCE CONTROL

__ _ _ - = - - _ ____ ==

FROM: DUE: 04/16/87 EDO CONTROL: 002727 DOC DT: 04/02/87 SEN.-OORDON J. HUMPHREY FINAL REPLY:

TO:

CHAIRMAN ZECH FOR SIONATURE OF: ** PRIORITY ** SECY NO: 87-346 CHAIRMAN DESC: ROUTING:

COMMENDS NRC FOR SHUTDOWN OF PEACH BOTTOM STELLO ROE DATE: 04/08/87 REHM ASSIGNED TO: RI - ---

CONTACT: MURLEY ZERBE TAYLOR DENTON SPECIAL INSTRUCTIONS OR REMARKS: MURRAY

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER: CRC-87-0346 LOGGING DATE: Apr 7 87 l

ACTION OFFICE: EDO .

AUTHOR: G.J. Humphrey .

AFFILIATION:

LETTER DATE: Apr 2 87 FILE, CODE: ID&R-5 Peach Bottom

SUBJECT:

NRC's decision to shut down Peach Bottom ACTION: Signature of Chairman DISTRIBUTION: RF, OCA to Ack SPECIAL HANDLING: None NOTES:

DATE DUE: Apr 21 87 SIGNATURE: . DATE SIGNED:

AFFILIATION:

. Refd Off. EDO  ;

Date 9' - V - 2 9 time F6

  • i b

e EDO --- 002727