ML20235F725

From kanterella
Revision as of 17:31, 27 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Partially Withheld Insp Rept 50-400/87-33 on 870831-0904 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted
ML20235F725
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/22/1987
From: Cline W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20235F729 List:
References
NUDOCS 8709290295
Download: ML20235F725 (2)


See also: IR 05000400/1987033

Text

- _ _ _ _ _ _ - _ _ _ _ - . _ _ - _ _

,

,

a i

SEP22 9 INFORMATION -

.B

\ Docket No. 50-400

6

9' mc

License No. NPF-63 *$n

N

> M

l

Carolina Power and Light Company g

ATTN: Mr. E. E. Utley

Senior Executive Vice President 3

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602 '

1

Gentlemen: l

\- SUBJECT: NRC INSPECTION REPORT NO. 50-400/87-33

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

J. D. Ennis on August 31 - September 4, 1987. The inspection included a review

of activities authorized for your Shearon Harris facility. At the conclusion

of the inspection, the findings were discussed with those members of your staff  ;

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

3

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified. j

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosure j

to this letter, with the exception of the report cover page which presents a i

! nonexempt summary, will not be placed in the NRC Public Document Room. j

Should you have any questions concerning this letter, please contact us.

Sincerely,

William E. Cline, Chief

Nuclear Materials Safety and

Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosure: (See page 2)

-

8709290295 070922 ##LOSURE contAINS

PDR ADOCK 05000400 3 #ECUAADS

UPon $gp INFOTourgo

G PDR

PAcg gg * TION THis

"'aoue

_ - - - _

SAFEGUAgoS rNFURMATIOP lt-00 \

- - -

. .___ - _ _ _

,

~

-

SAkr"" * 9? 'NFORMATION

Carolina Power and Light Company 2

${pggjgg7 i

Enclosure:

NRC InspectionLReport

(Safeguards Information)

cc w/ enc 1:

'R. A.' Watson, Vice President

Harris Nuclear Project

D. L. . Tibbitts, Director of Regulatory -

. Compliance .

J. L. Willis, Plant General Manager

bec w/ enc 1:

.NRR/DRIS/SB

bec w/ Inspection Summary:

Document Control Desk (RIDS IE04), 016

State of North Carolina

A. Upchurch, Ghairman, Triangle J-

Council of Governments

!

!

.

RII - RII RII 3

>

JEnnis:er DF ui re PFredrickson WC) ige j

09/11/87 09/tt/87 T 09/P/87 097 L*7

'

SAFEGUARDS INFORMATION e s s

,

I